CLA-US 42/US 68-04.62/15.16
CLA County · est $1.3M
Bid dateThursday, November 18—
CLA County · est $1.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 9.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 66 more items below.
| Item | Quantity | R1Great Lakes Construction CO | R2Complete General Construction Company | R3Eagle Bridge CO | R4Catts Construction INC | R5Sunesis Construction CO | % of bid |
|---|---|---|---|---|---|---|---|
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 16,718 SF | $9.00 | $10.00 | $9.00 | $11.50 | $17.39 | 16% |
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 1,187 SY | $65.00 | $53.00 | $70.00 | $54.00 | $56.65 | 8% |
| 848E20001 SURFACE PREPARATION USING HYDRODEMOLITION, AS PER | 1,167 SY | $65.00 | $76.00 | $60.00 | $79.00 | $67.99 | 8% |
| Item | Quantity | R1Great Lakes Construction CO | R2Complete General Construction Company | R3Eagle Bridge CO | R4Catts Construction INC | R5Sunesis Construction CO |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,000 | $4,000 | $5,000 | $1,932 | $4,129 |
| 202E23500 WEARING COURSE REMOVED | 2,218 SY | $7.25 | $8.00 | $8.00 | $6.00 | $4.65 |
| 659E10000 SEEDING AND MULCHING | 467 SY | $5.00 | $6.50 | $7.00 | $7.00 | $5.92 |
| 659E20000 COMMERCIAL FERTILIZER | 0.06 TON | $500 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, |
| 1 LS |
| $74,175 |
| $70,000 |
| $55,000 |
| $21,954 |
| $14,985 |
| 8% |
| 516E11211 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S | 97 FT | $605 | $575 | $669 | $702 | $809 | 6% |
| 848E10201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 326 SY | $160 | $140 | $155 | $82.00 | $119 | 6% |
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 103 CY | $475 | $475 | $475 | $545 | $644 | 5% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 2,860 FT | $15.00 | $17.00 | $17.50 | $22.50 | $22.53 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40,000 | $35,000 | $62,250 | $73,526 | 4% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 16,718 SF | $2.00 | $2.75 | $2.00 | $3.15 | $2.01 | 4% |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 16,718 SF | $2.00 | $1.00 | $2.00 | $1.00 | $2.01 | 4% |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 16,718 SF | $1.90 | $5.00 | $1.90 | $5.73 | $2.01 | 3% |
| 530E00600 SPECIAL - STRUCTURES ABUTMENT REFACING WITH GALVAN | 184 SF | $158 | $150 | $165 | $401 | $643 | 3% |
| 848E20001 SURFACE PREPARATION USING HYDRODEMOLITION, AS PER | 326 SY | $85.00 | $95.00 | $105 | $83.00 | $56.04 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $26,000 | $30,000 | $57,500 | $38,233 | $51,132 | 3% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 367 SY | $68.00 | $60.00 | $100 | $99.00 | $139 | 3% |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 150 FT | $158 | $127 | $158 | $145 | $159 | 3% |
| 849E10700 STRAIGHTENING DAMAGED MEMBERS | 1 LS | $23,100 | $23,100 | $25,000 | $26,504 | $24,649 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $20,000 | $11,000 | $27,500 | $13,369 | $0.01 | 2% |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 930 SY | $20.50 | $20.50 | $20.50 | $28.00 | $20.64 | 2% |
| $800 |
| $1,500 |
| $535 |
| $504 |
| 659E35000 WATER | 3 MGAL | $1.00 | $1.00 | $10.00 | $1.00 | $1.01 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 407E10000 TACK COAT | 152 GAL | $3.00 | $3.00 | $3.00 | $3.50 | $5.03 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 7 EACH | $15.00 | $34.00 | $25.00 | $21.00 | $8.06 |
| 642E30030 REMOVAL OF PAVEMENT MARKING, LANE LINE | 0.38 MILE | $5,430 | $5,719 | $5,430 | $6,230 | $5,468 |
| 644E00204 LANE LINE, 6", LANE LINE | 0.38 MILE | $9,180 | $9,919 | $9,180 | $9,179 | $9,244 |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 2,888 FT | $1.45 | $1.10 | $1.45 | $1.65 | $1.46 |
| 646E10010 EDGE LINE, 6" | 0.48 MILE | $6,380 | $16,800 | $6,380 | $11,475 | $6,424 |
| 646E10200 CENTER LINE | 0.45 MILE | $6,800 | $16,800 | $6,800 | $17,210 | $6,847 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $70.00 | $85.00 | $93.21 | $57.50 | $85.59 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $1,950 | $2,100 | $2,100 | $2,570 | $2,115 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $1,950 | $2,150 | $2,150 | $2,570 | $2,165 |
| 614E12420 DETOUR SIGNING | 1 LS | $2,615 | $7,735 | $7,500 | $5,165 | $5,850 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 30 EACH | $7.65 | $15.00 | $10.00 | $7.00 | $18.13 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (ONE WAY) | 32 EACH | $7.70 | $15.00 | $10.00 | $9.00 | $15.10 |
| 614E13350 OBJECT MARKER, ONE WAY | 32 EACH | $16.75 | $16.00 | $15.00 | $13.50 | $16.11 |
| 614E13360 OBJECT MARKER, TWO WAY | 30 EACH | $16.95 | $21.00 | $15.00 | $18.00 | $21.15 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 0.2 MILE | $7,235 | $7,235 | $14,000 | $11,474 | $7,285 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 1.5 MILE | $3,155 | $3,155 | $8,500 | $2,869 | $3,177 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 24 FT | $10.50 | $10.50 | $10.00 | $14.00 | $10.57 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $14,500 | $15,000 | $16,500 | $6,423 | $10,736 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $3,500 | $7,000 | $6,500 | $8,764 | $27,597 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $3,800 | $1,000 | $6,500 | $8,764 | $4,835 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 50 LB | $5.00 | $5.00 | $2.50 | $4.75 | $6.61 |
| 509E25000 UNCOATED REINFORCING STEEL | 619 LB | $3.00 | $3.00 | $2.50 | $4.50 | $3.66 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 148 EACH | $24.00 | $12.00 | $26.00 | $35.00 | $16.59 |
| 511E50210 CLASS QC1 CONCRETE, SUBSTRUCTURE | 2 CY | $1,850 | $2,400 | $4,000 | $5,196 | $6,676 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 68 SY | $45.00 | $45.00 | $45.00 | $40.00 | $45.31 |
| 514E27700 FIELD PAINTING, MISC.: ZINC RICH PRIMER | 52 SF | $180 | $90.00 | $50.00 | $5.00 | $42.38 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 46 SF | $10.00 | $8.00 | $8.00 | $39.00 | $7.26 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 10 SF | $15.00 | $16.00 | $8.50 | $39.00 | $11.34 |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN | 94 FT | $18.00 | $22.50 | $22.50 | $37.00 | $22.66 |
| 517E76302 RAILING, MISC.: REPAIR OF COMPROMISED TOP ANCHOR B | 5 EACH | $550 | $450 | $300 | $395 | $1,072 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 167 FT | $13.00 | $13.50 | $13.50 | $24.00 | $13.59 |
| 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE | 10 CY | $310 | $252 | $275 | $575 | $466 |
| 848E50000 HAND CHIPPING | 17 SY | $155 | $80.00 | $75.00 | $85.00 | $136 |
| 848E50100 TEST SLAB | 1 LS | $1,300 | $1,600 | $1,500 | $2,729 | $2,517 |
| 848E50201 FULL DEPTH REPAIR, AS PER PLAN | 2 CY | $6,850 | $1,800 | $1,750 | $450 | $14,202 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 50 LB | $5.00 | $5.00 | $2.50 | $4.75 | $6.61 |
| 509E25000 UNCOATED REINFORCING STEEL | 744 LB | $3.00 | $3.00 | $2.50 | $4.75 | $2.80 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 96 EACH | $20.00 | $14.00 | $16.00 | $34.00 | $16.39 |
| 511E34410 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 17 CY | $1,025 | $1,900 | $2,500 | $806 | $3,838 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 85 SY | $25.00 | $25.00 | $25.00 | $28.00 | $25.17 |
| 513E90000 STRUCTURAL STEEL, MISC.: DAMAGED SECONDARY MEMBER | 960 LB | $10.00 | $8.00 | $12.00 | $10.99 | $7.95 |
| 513E95000 STRUCTURAL STEEL, MISC.: CP WELD | 1 FT | $2,000 | $2,000 | $2,000 | $2,295 | $4,808 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 25 MNHR | $120 | $150 | $120 | $172 | $45.31 |
| 514E10000 FINAL INSPECTION REPAIR | 16 EACH | $150 | $200 | $150 | $228 | $151 |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN | 90 FT | $18.00 | $22.50 | $22.50 | $28.00 | $22.66 |
| 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 12 EACH | $955 | $1,150 | $1,750 | $1,302 | $1,776 |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $10,500 | $11,000 | $15,000 | $12,050 | $10,573 |
| 518E12900 SCUPPER, LENGTHENING | 10 EACH | $450 | $350 | $450 | $571 | $601 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 40 SF | $135 | $135 | $140 | $132 | $136 |
| 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE | 56 CY | $260 | $252 | $275 | $370 | $466 |
| 848E50000 HAND CHIPPING | 101 SY | $95.00 | $65.00 | $55.00 | $82.00 | $45.94 |
| 848E50100 TEST SLAB | 1 LS | $1,300 | $1,600 | $1,500 | $2,729 | $2,660 |
| 848E50200 FULL-DEPTH REPAIR | 6 CY | $1,300 | $1,400 | $1,250 | $582 | $5,316 |
| 848E50320 EXISTING CONCRETE OVERLAY REMOVED, 1 1/4" | 1,187 SY | $9.00 | $8.00 | $8.00 | $20.00 | $8.25 |
| 848E50340 REMOVAL OF DEBONDED OR DETERIORATED EXISTING VARIA | 51 SY | $160 | $55.00 | $55.00 | $23.00 | $101 |
| 849E10000 DAMAGE ASSESSMENT | 1 LS | $2,500 | $2,500 | $2,500 | $2,868 | $2,668 |
| 849E10500 SURFACE PREPARATION | 1 LS | $3,000 | $2,000 | $5,000 | $917 | $800 |
| 849E10600 REPAIRING DAMAGED MEMBERS BY GRINDING | 4 HOUR | $125 | $125 | $125 | $143 | $133 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,000 | $4,000 | $5,000 | $1,721 | $5,035 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 16,718 SF | $9 | $150k | 13% |
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 1,187 SY | $65 | $77k | 6% |
| 848E20001 SURFACE PREPARATION USING HYDRODEMOLITION, AS PER | 1,167 SY | $65 | $76k | 6% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $74,175 | $74k | 6% |
| 516E11211 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S | 97 FT | $605 | $59k | 5% |
| 848E10201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 326 SY | $160 | $52k | 4% |
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 103 CY | $475 | $49k | 4% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 2,860 FT | $15 | $43k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 3% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 16,718 SF | $2 | $33k | 3% |