GAL-CR 71-00.90
GAL County · est $1.5M
Bid dateThursday, November 18—
GAL County · est $1.5M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 10.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 48 more items below.
| Item | Quantity | R1Righter Company INC | R2Complete General Construction Company | % of bid |
|---|---|---|---|---|
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $279,000 | $240,000 | 17% |
| 530E00200 SPECIAL - STRUCTURES, TEMPORARY SUPPORT OF STRUCTU | 1 LS | $250,000 | $190,000 | 15% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $150,000 | $150,000 | 9% |
| 511E44112 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT NOT INCLUD | 289 CY | $500 | $530 | 9% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 67,293 LB | $2.00 | $1.50 | 8% |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 2,190 FT | $50.00 | $37.00 | 7% |
| 511E34413 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, AS | 88 CY | $1,200 | $1,400 | 6% |
| Item | Quantity | R1Righter Company INC | R2Complete General Construction Company |
|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,000 | $5,000 |
| 202E23000 PAVEMENT REMOVED | 242 SY | $10.00 | $50.00 |
| 203E10000 EXCAVATION | 4 CY | $150 | $75.00 |
| 203E20000 EMBANKMENT | 9 CY | $100 | $50.00 |
| 204E10000 SUBGRADE COMPACTION | 322 SY | $3.00 | $9.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 100 FT | $34.88 | $34.88 |
| 606E26100 ANCHOR ASSEMBLY, TYPE E |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 182 CY |
| $500 |
| $400 |
| 5% |
| 519E11600 SPECIAL - PATCHING CONCRETE STRUCTUREType 1 Repair | 445 SF | $175 | $130 | 5% |
| 519E11600 SPECIAL - PATCHING CONCRETE STRUCTUREType 2 Repair | 309 SF | $175 | $150 | 3% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $50,000 | $245,000 | 3% |
| 601E32000 ROCK CHANNEL PROTECTION, TYPE A WITH FILTER | 498 CY | $100 | $80.00 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40,000 | 2% |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $25,000 | $20,000 | 2% |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 787 SY | $26.00 | $100 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $20,000 | $15,000 | 1% |
| 507E00150 STEEL PILES HP10X42, DRIVEN | 1,940 FT | $10.00 | $10.00 | 1% |
| 526E10000 REINFORCED CONCRETE APPROACH SLABS (T=12") | 76 SY | $250 | $320 | 1% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 128 CY | $100 | $140 | 1% |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 10 CY | $1,200 | $3,500 | 1% |
| 2 EACH |
| $2,350 |
| $2,350 |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 2 EACH | $1,150 | $1,150 |
| 606E35100 BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 4 EACH | $340 | $340 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $100 | $100 |
| 659E00300 TOPSOIL | 71 CY | $45.00 | $25.00 |
| 659E10000 SEEDING AND MULCHING | 129 SY | $20.00 | $12.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 32 SY | $20.00 | $2.50 |
| 659E15000 INTER-SEEDING | 32 SY | $20.00 | $1.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.09 TON | $800 | $650 |
| 659E31000 LIME | 0.13 ACRE | $80.00 | $500 |
| 659E35000 WATER | 4 MGAL | $1.00 | $4.00 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 34 CY | $335 | $335 |
| 304E20000 AGGREGATE BASE | 66 CY | $124 | $95.00 |
| 407E10000 TACK COAT | 34 GAL | $2.00 | $2.00 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 24 CY | $365 | $365 |
| 620E00500 DELINEATOR, POST GROUND MOUNTED | 6 EACH | $60.00 | $60.00 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, BI-DIRECTIONAL | 10 EACH | $10.00 | $10.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 28 FT | $13.00 | $13.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2 EACH | $20.00 | $20.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 4 EACH | $60.00 | $60.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 6 EACH | $20.00 | $20.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.06 MILE | $1,952 | $8,100 |
| 642E00300 CENTER LINE, TYPE 1 | 0.03 MILE | $3,800 | $15,700 |
| 646E10200 CENTER LINE | 0.03 MILE | $22,152 | $91,300 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 69 LB | $5.00 | $5.00 |
| 512E10600 CONCRETE REPAIR BY EPOXY INJECTION | 77 FT | $100 | $100 |
| 512E33000 TYPE 2 WATERPROOFING | 52 SY | $26.00 | $26.00 |
| 512E71500 SPECIAL - URETHANE TOP COAT SEALER | 6 SY | $40.00 | $40.00 |
| 516E10010 ARMORLESS PREFORMED JOINT SEAL | 40 FT | $151 | $75.00 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 42 SF | $4.00 | $12.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 49 SF | $6.00 | $15.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 171 SF | $8.00 | $16.00 |
| 516E14014 INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 56 FT | $45.00 | $60.00 |
| 518E12301 SCUPPERS, INCLUDING SUPPORTS, AS PER PLAN | 2 EACH | $2,500 | $2,400 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 173 FT | $10.00 | $10.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 45 FT | $20.00 | $15.00 |
| 519E00100 SPECIAL - COMPOSITE FIBER WRAP SYSTEM | 54 SF | $206 | $70.00 |
| 519E11600 SPECIAL - PATCHING CONCRETE STRUCTUREType 3 Repair | 4 SF | $700 | $500 |
| 526E90011 TYPE A INSTALLATION, AS PER PLAN | 46 FT | $150 | $325 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $1,000 | $5,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $6,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $279,000 | $279k | 16% |
| 530E00200 SPECIAL - STRUCTURES, TEMPORARY SUPPORT OF STRUCTU | 1 LS | $250,000 | $250k | 14% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $150,000 | $150k | 8% |
| 511E44112 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT NOT INCLUD | 289 CY | $500 | $145k | 8% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 67,293 LB | $2 | $135k | 8% |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 2,190 FT | $50 | $110k | 6% |
| 511E34413 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, AS | 88 CY | $1,200 | $106k | 6% |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 182 CY | $500 | $91k | 5% |
| 519E11600 SPECIAL - PATCHING CONCRETE STRUCTUREType 1 Repair | 445 SF | $175 | $78k | 4% |
| 519E11600 SPECIAL - PATCHING CONCRETE STRUCTUREType 2 Repair | 309 SF | $175 | $54k | 3% |