ADA-/BRO-SR 136/US 62-18.96/26.50
ADA County · est $2.4M
Bid dateThursday, December 16—
ADA County · est $2.4M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 91 more items below.
| Item | Quantity | R1Rack & Ballauer Excavating CO INC | R2Shelly Company | R3John R Jurgensen Company | R4Sunesis Construction CO | % of bid |
|---|---|---|---|---|---|---|
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 1,764 CY | $192 | $174 | $201 | $258 | 16% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 2,098 CY | $159 | $153 | $165 | $204 | 16% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $200,000 | $235,000 | $328,824 | $235,796 | 10% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (1021 CY | $182 | $213 | $203 | $217 |
| Item | Quantity | R1Rack & Ballauer Excavating CO INC | R2Shelly Company | R3John R Jurgensen Company | R4Sunesis Construction CO |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $13,000 | $10,000 | $10,533 | $13,289 |
| 202E20010 HEADWALL REMOVED | 2 EACH | $500 | $585 | $926 | $594 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 149 FT | $17.00 | $31.50 | $18.01 | $18.49 |
| 202E35200 PIPE REMOVED, OVER 24" | 9 FT | $48.00 | $130 | $87.06 | $51.74 |
| 202E75200 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 9% |
| 304E20000 AGGREGATE BASE | 2,849 CY | $50.00 | $40.50 | $76.10 | $87.14 | 7% |
| 204E30020 GRANULAR MATERIAL, TYPE C | 3,411 CY | $40.25 | $43.25 | $61.25 | $87.43 | 7% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, VARIABLE DEPTH | 37,268 SY | $2.60 | $3.40 | $3.30 | $3.56 | 5% |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,100 | $2,100 | $2,447 | $2,100 | 4% |
| 659E00300 TOPSOIL | 1,638 CY | $47.00 | $35.00 | $8.00 | $55.48 | 4% |
| 204E13000 EXCAVATION OF SUBGRADE | 3,411 CY | $18.75 | $17.25 | $29.00 | $42.55 | 3% |
| 203E10000 EXCAVATION | 2,932 CY | $21.00 | $23.00 | $17.21 | $35.81 | 3% |
| 202E23000 PAVEMENT REMOVED | 4,881 SY | $11.50 | $17.75 | $16.41 | $23.11 | 3% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 3,980 FT | $14.00 | $14.00 | $12.37 | $14.00 | 3% |
| 832E30000 EROSION CONTROL | 43,461 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 622E41110 PORTABLE BARRIER, ANCHORED | 2,160 FT | $18.00 | $18.00 | $33.69 | $18.00 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $30,000 | $40,000 | $13,581 | $23,450 | 1% |
| 624E10000 MOBILIZATION | 1 LS | $30,000 | $65,000 | $100,000 | $168,717 | 1% |
| 644E00104 EDGE LINE, 6" | 6.09 MILE | $4,605 | $4,605 | $4,392 | $3,656 | 1% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 339 SY | $70.00 | $54.50 | $76.21 | $105 | 1% |
| 632E26500 DETECTOR LOOP | 14 EACH | $1,650 | $2,400 | $2,450 | $1,650 | 1% |
| 48 FT |
| $90.00 |
| $58.00 |
| $50.00 |
| $9.28 |
| 203E20000 EMBANKMENT | 1,368 CY | $16.00 | $16.75 | $12.62 | $11.08 |
| 204E10000 SUBGRADE COMPACTION | 9,846 SY | $2.00 | $1.30 | $4.44 | $3.22 |
| 204E45000 PROOF ROLLING | 9 HOUR | $180 | $205 | $205 | $241 |
| 204E50000 GEOTEXTILE FABRIC | 7,320 SY | $1.40 | $0.50 | $4.28 | $1.33 |
| 608E52000 CURB RAMP | 230 SF | $40.00 | $52.75 | $21.87 | $25.96 |
| 609E26000 CURB, TYPE 6 | 39 FT | $85.00 | $72.25 | $45.41 | $45.63 |
| 623E40500 REFERENCE MONUMENT | 9 EACH | $510 | $1,425 | $598 | $1,282 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 4 SY | $100 | $550 | $143 | $177 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 8 CY | $153 | $375 | $304 | $328 |
| 659E10000 SEEDING AND MULCHING | 11,765 SY | $0.75 | $1.70 | $1.70 | $2.38 |
| 659E20000 COMMERCIAL FERTILIZER | 1.58 TON | $800 | $900 | $900 | $900 |
| 659E31000 LIME | 2.43 ACRE | $80.00 | $75.00 | $75.00 | $75.00 |
| 659E35000 WATER | 63 MGAL | $1.00 | $1.00 | $1.00 | $1.00 |
| 670E00500 SLOPE EROSION PROTECTION | 2,987 SY | $2.00 | $2.50 | $2.50 | $2.50 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,500 | $1,325 | $1,500 | $1,325 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $6,000 | $1,260 | $3,420 | $4,860 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $8,000 | $7,766 | $8,329 | $8,400 |
| 602E20000 CONCRETE MASONRY | 2.76 CY | $1,500 | $1,950 | $1,757 | $1,977 |
| 605E31100 AGGREGATE DRAINS | 943 FT | $11.00 | $11.50 | $24.23 | $7.94 |
| 611E00400 4" CONDUIT, TYPE E | 60 FT | $15.00 | $23.00 | $18.74 | $20.02 |
| 611E01400 6" CONDUIT, TYPE E | 50 FT | $20.00 | $26.25 | $31.28 | $27.68 |
| 611E01500 6" CONDUIT, TYPE F | 110 FT | $25.00 | $29.50 | $31.32 | $23.88 |
| 611E07900 18" CONDUIT, TYPE D | 72 FT | $72.00 | $65.25 | $99.72 | $98.71 |
| 611E10900 24" CONDUIT, TYPE D [707.01 or 707.02 (ALUMINIZED) | 62 FT | $90.00 | $92.75 | $136 | $129 |
| 611E19200 42" CONDUIT, TYPE A [707.01 OR 707.02 METALLIC COA | 23 FT | $180 | $270 | $757 | $530 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 15 EACH | $750 | $875 | $588 | $575 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 4 EACH | $700 | $875 | $588 | $460 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 4 EACH | $300 | $250 | $389 | $344 |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 150 SY | $71.00 | $64.75 | $104 | $110 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 6,686 FT | $2.00 | $2.95 | $2.95 | $3.48 |
| 253E01001 PAVEMENT REPAIR, AS PER PLAN | 50 SY | $104 | $144 | $375 | $400 |
| 254E01600 PATCHING PLANED SURFACE | 4,300 SY | $4.00 | $2.50 | $4.29 | $4.00 |
| 407E10000 TACK COAT | 4,234 GAL | $2.00 | $1.85 | $4.00 | $5.00 |
| 407E20000 NON-TRACKING TACK COAT | 1,934 GAL | $2.00 | $3.05 | $4.00 | $10.00 |
| 617E10100 COMPACTED AGGREGATE | 40 CY | $100 | $112 | $105 | $118 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 15 EACH | $500 | $300 | $515 | $175 |
| 618E40100 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 4,502 FT | $2.60 | $1.22 | $2.00 | $1.00 |
| 621E00100 RPM | 432 EACH | $28.75 | $25.00 | $32.50 | $32.50 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 225 EACH | $12.50 | $6.25 | $22.75 | $37.69 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 389.7 FT | $10.25 | $10.25 | $10.25 | $10.25 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 378.5 FT | $11.25 | $11.25 | $11.25 | $11.25 |
| 630E04100 GROUND MOUNTED SUPPORT, NO. 4 POST | 29.2 FT | $15.25 | $15.25 | $15.25 | $15.25 |
| 630E08600 SIGN POST REFLECTOR | 13 EACH | $43.60 | $43.60 | $43.60 | $43.60 |
| 630E75000 SIGN ATTACHMENT ASSEMBLY | 2 EACH | $65.00 | $65.00 | $65.00 | $65.00 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 12 EACH | $110 | $110 | $110 | $110 |
| 630E80100 SIGN, FLAT SHEET | 570.2 SF | $20.50 | $20.50 | $20.50 | $20.50 |
| 630E80500 SIGN, DOUBLE FACED, STREET NAME | 2 EACH | $41.00 | $41.00 | $41.00 | $41.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 93 EACH | $11.00 | $11.00 | $11.00 | $11.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 5 EACH | $75.00 | $75.00 | $75.00 | $75.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 72 EACH | $25.00 | $25.00 | $25.00 | $25.00 |
| 644E00204 LANE LINE, 6" | 1.27 MILE | $1,605 | $1,605 | $2,418 | $1,916 |
| 644E00300 CENTER LINE | 2.05 MILE | $5,790 | $5,790 | $6,152 | $4,875 |
| 644E00404 CHANNELIZING LINE, 12" | 4,049 FT | $1.85 | $1.85 | $1.80 | $1.33 |
| 644E00500 STOP LINE | 539 FT | $5.85 | $5.85 | $6.80 | $7.00 |
| 644E00600 CROSSWALK LINE | 501 FT | $3.85 | $3.85 | $3.20 | $3.50 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 697 FT | $5.60 | $5.60 | $6.35 | $6.65 |
| 644E00720 CHEVRON MARKING | 556 FT | $5.60 | $5.60 | $6.50 | $6.65 |
| 644E00900 ISLAND MARKING | 797 SF | $3.85 | $3.85 | $3.10 | $4.90 |
| 644E01000 RAILROAD SYMBOL MARKING | 3 EACH | $580 | $580 | $830 | $700 |
| 644E01200 PARKING LOT STALL MARKING | 54 FT | $5.35 | $5.35 | $3.50 | $2.10 |
| 644E01300 LANE ARROW | 35 EACH | $100 | $100 | $99.00 | $105 |
| 644E01514 DOTTED LINE, 8" | 614 FT | $1.60 | $1.60 | $2.80 | $1.40 |
| 625E25402 CONDUIT, 2", 725.05 | 169 FT | $6.35 | $16.00 | $20.00 | $6.35 |
| 625E29000 TRENCH | 169 FT | $13.60 | $12.00 | $20.00 | $13.60 |
| 625E30700 PULL BOX, 725.08, 18" | 5 EACH | $1,450 | $1,500 | $900 | $1,450 |
| 625E31510 PULL BOX REMOVED | 5 EACH | $500 | $400 | $175 | $500 |
| 632E30500 MESSENGER WIRE, MISC.: DELASH AND RELASH CABLE | 597 FT | $14.75 | $16.00 | $6.00 | $14.75 |
| 632E65200 LOOP DETECTOR LEAD-IN CABLE | 3,044 FT | $2.40 | $3.25 | $1.50 | $2.40 |
| 410E10000 TRAFFIC COMPACTED SURFACE, TYPE A | 50 CY | $50.00 | $99.50 | $109 | $72.98 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 300 HOUR | $70.00 | $85.00 | $96.07 | $75.00 |
| 614E12800 WORK ZONE RAISED PAVEMENT MARKER | 2,835 EACH | $6.00 | $6.00 | $7.50 | $7.50 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BI-DIRECTIONAL) | 158 EACH | $17.00 | $17.00 | $15.91 | $25.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 158 EACH | $21.00 | $21.00 | $15.91 | $35.00 |
| 614E18600 PORTABLE CHANGEABLE MESSAGE SIGN | 12 SNMT | $850 | $850 | $1,600 | $1,600 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 1.18 MILE | $865 | $865 | $4,490 | $4,490 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 8.08 MILE | $680 | $680 | $1,225 | $1,225 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 24,346 FT | $0.55 | $0.55 | $0.30 | $0.30 |
| 614E24612 WORK ZONE DOTTED LINE, CLASS III, 6", 642 PAINT | 4,009 FT | $0.50 | $0.50 | $0.60 | $0.60 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 220 FT | $3.50 | $3.50 | $12.00 | $12.00 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 6 EACH | $75.00 | $75.00 | $420 | $420 |
| 614E32210 WORK ZONE RAILROAD SYMBOL MARKING, CLASS III, 642 | 2 EACH | $400 | $400 | $775 | $775 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $15,000 | $7,500 | $6,110 | $12,888 |
| 616E10000 WATER | 24 MGAL | $80.00 | $1.00 | $67.77 | $12.81 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $8,500 | $7,500 | $5,764 | $4,457 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $15,000 | $12,000 | $16,666 | $18,374 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $1,500 | $2,000 | $1,953 | $1,996 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 1,764 CY | $192 | $339k | 13% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 2,098 CY | $159 | $334k | 13% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $200,000 | $200k | 8% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (1021 CY | $182 | $186k | 7% |
| 304E20000 AGGREGATE BASE | 2,849 CY | $50 | $142k | 6% |
| 204E30020 GRANULAR MATERIAL, TYPE C | 3,411 CY | $40.25 | $137k | 5% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, VARIABLE DEPTH | 37,268 SY | $2.6 | $97k | 4% |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,100 | $88k | 3% |
| 659E00300 TOPSOIL | 1,638 CY | $47 | $77k | 3% |
| 204E13000 EXCAVATION OF SUBGRADE | 3,411 CY | $18.75 | $64k | 3% |