CLA-SR 54-00.00
CLA County · est $1.5M
Bid dateThursday, December 16—
CLA County · est $1.5M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 39 more items below.
| Item | Quantity | R1Shelly Company | R2John R Jurgensen Company | % of bid |
|---|---|---|---|---|
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 3,358 CY | $169 | $174 | 41% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (1951 CY | $149 | $165 | 21% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $75,000 | $59,549 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $71,000 | $40,000 | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 449 CY | $140 | $155 | 5% |
| 253E01001 PAVEMENT REPAIR, AS PER PLAN | 1,200 SY | $40.00 | $73.47 | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 2" Depth | 18,348 SY | $2.00 | $2.13 | 3% |
| 617E10100 COMPACTED AGGREGATE | 628 CY | $58.00 |
| Item | Quantity | R1Shelly Company | R2John R Jurgensen Company |
|---|---|---|---|
| 202E30000 WALK REMOVED | 282 SF | $10.00 | $10.00 |
| 202E38000 GUARDRAIL REMOVED | 300 FT | $8.00 | $8.00 |
| 202E42001 ANCHOR ASSEMBLY REMOVED, TYPE A, AS PER PLAN | 4 EACH | $775 | $775 |
| 204E10000 SUBGRADE COMPACTION | 1,900 SY | $1.00 | $2.02 |
| 204E13000 EXCAVATION OF SUBGRADE | 33 CY | $20.00 | $67.32 |
| 204E30020 GRANULAR MATERIAL, TYPE C | 33 CY | $60.00 | $87.89 |
| 204E45000 PROOF ROLLING | 3 HOUR | $150 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $95.76 |
| 3% |
| 202E23500 WEARING COURSE REMOVED | 1,261 SY | $23.72 | $16.67 | 2% |
| 407E20000 NON-TRACKING TACK COAT | 13,384 GAL | $2.00 | $5.00 | 2% |
| 304E20000 AGGREGATE BASE | 354 CY | $60.00 | $80.69 | 2% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (92 CY | $172 | $241 | 1% |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 13.06 MILE | $1,200 | $1,200 | 1% |
| 608E52000 CURB RAMP | 282 SF | $55.00 | $58.50 | 1% |
| 203E10000 EXCAVATION | 470 CY | $28.00 | $36.14 | 1% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 4 EACH | $2,915 | $2,915 | 1% |
| 606E15050 GUARDRAIL, TYPE MGS | 400 FT | $27.00 | $27.00 | 1% |
| 621E00100 RPM | 361 EACH | $27.50 | $27.50 | 1% |
| 202E23000 PAVEMENT REMOVED | 1,648 SY | $6.00 | $7.47 | 1% |
| 642E00104 EDGE LINE, 6", TYPE 1 | 11.28 MILE | $800 | $800 | 1% |
| $192 |
| 204E50000 GEOTEXTILE FABRIC | 100 SY | $5.00 | $9.17 |
| 209E72050 PREPARING SUBGRADE FOR SHOULDER PAVING | 9.76 MILE | $450 | $1,375 |
| 606E35170 BRIDGE TERMINAL ASSEMBLY, TYPE BR-1 | 4 EACH | $2,000 | $2,000 |
| 623E39500 MONUMENT BOX ADJUSTED TO GRADE | 1 EACH | $1,200 | $489 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET | 5 EACH | $250 | $509 |
| 659E10000 SEEDING AND MULCHING | 3 SY | $25.00 | $25.00 |
| 605E31100 AGGREGATE DRAINS | 800 FT | $9.00 | $22.71 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 1 EACH | $1,250 | $549 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE Variable Depth | 913 SY | $2.00 | $6.81 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, Variable Depth | 184 SY | $2.00 | $14.46 |
| 254E01601 PATCHING PLANED SURFACE, AS PER PLAN | 50 SY | $25.00 | $4.03 |
| 301E46001 ASPHALT CONCRETE BASE, PG64-22, AS PER PLAN | 24 CY | $360 | $536 |
| 407E13900 TACK COAT, 702.13 | 16 GAL | $2.00 | $5.00 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 5 EACH | $30.00 | $453 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 361 EACH | $10.00 | $18.58 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BI-DIRECTIONAL | 10 EACH | $15.00 | $15.00 |
| 642E00300 CENTER LINE, TYPE 1 | 5.98 MILE | $1,200 | $1,200 |
| 644E00400 CHANNELIZING LINE, 8" | 30 FT | $4.00 | $4.00 |
| 644E00500 STOP LINE | 300 FT | $8.00 | $8.00 |
| 644E01000 RAILROAD SYMBOL MARKING | 2 EACH | $650 | $650 |
| 644E01300 LANE ARROW | 1 EACH | $200 | $200 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 24 HOUR | $70.00 | $89.63 |
| 614E12420 DETOUR SIGNING | 1 LS | $5,500 | $5,500 |
| 614E12460 WORK ZONE MARKING SIGN | 49 EACH | $110 | $110 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 90 FT | $1.00 | $1.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 600 FT | $3.00 | $3.00 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 3 EACH | $50.00 | $50.00 |
| 614E32210 WORK ZONE RAILROAD SYMBOL MARKING, CLASS III, 642 | 4 EACH | $200 | $200 |
| 516E31001 JOINT SEALER, AS PER PLAN | 72 FT | $30.00 | $30.00 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $5,000 | $2,500 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,000 | $5,291 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $2,500 | $4,384 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 3,358 CY | $169 | $568k | 39% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (1951 CY | $149 | $291k | 20% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $75,000 | $75k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $71,000 | $71k | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 449 CY | $140 | $63k | 4% |
| 253E01001 PAVEMENT REPAIR, AS PER PLAN | 1,200 SY | $40 | $48k | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 2" Depth | 18,348 SY | $2 | $37k | 2% |
| 617E10100 COMPACTED AGGREGATE | 628 CY | $58 | $36k | 2% |
| 202E23500 WEARING COURSE REMOVED | 1,261 SY | $23.72 | $30k | 2% |
| 407E20000 NON-TRACKING TACK COAT | 13,384 GAL | $2 | $27k | 2% |