JAC-SR 139-02.70
JAC County · est $0.2M
Bid dateThursday, January 28—
JAC County · est $0.2M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 19 more items below.
| Item | Quantity | R1Axis Civil Construction LLC | R2Heavy Highway Construction Company | R3Alan Stone CO INC | R4Eclipse CO LLC | R5R C Construction Company And Son | % of bid |
|---|---|---|---|---|---|---|---|
| 611E53300 53" X 83" CONDUIT, TYPE A, 706.04 | 90 FT | $665 | $620 | $902 | $627 | $750 | 29% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 98 CY | $250 | $290 | $253 | $212 | $325 | 12% |
| 624E10000 MOBILIZATION | 1 LS | $18,000 | $15,000 | $21,000 | $49,057 | $10,000 | 9% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 41 CY | $350 | $310 | $394 | $330 | $450 | 7% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 100 CY | $110 | $220 | $313 | $274 | $25.00 | 5% |
| 202E11001 STRUCTURE REMOVED, AS PER PLAN (60"x108" BOX CULV |
| Item | Quantity | R1Axis Civil Construction LLC | R2Heavy Highway Construction Company | R3Alan Stone CO INC | R4Eclipse CO LLC | R5R C Construction Company And Son |
|---|---|---|---|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 350 FT | $3.50 | $2.00 | $3.50 | $3.50 | $5.00 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 4 EACH | $250 | $300 | $318 | $310 | $500 |
| 202E75000 FENCE REMOVED | 130 FT | $3.00 | $2.00 | $2.50 | $3.50 | $10.00 |
| 204E10000 SUBGRADE COMPACTION | 554 SY |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $8,500 |
| $10,000 |
| $4,700 |
| $9,071 |
| $12,500 |
| 4% |
| 304E20000 AGGREGATE BASE | 88 CY | $85.00 | $60.00 | $70.00 | $76.50 | $100 | 4% |
| 203E20000 EMBANKMENT | 368 CY | $18.50 | $25.00 | $15.00 | $20.00 | $25.00 | 3% |
| 832E30000 EROSION CONTROL | 6,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 3% |
| 503E21320 UNCLASSIFIED EXCAVATION, INCLUDING ROCK (HEADWALLS | 1 LS | $6,000 | $8,000 | $3,500 | $5,454 | $9,500 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $6,000 | $2,500 | $5,000 | $9,357 | $10,000 | 3% |
| 202E23000 PAVEMENT REMOVED | 487 SY | $12.00 | $20.00 | $24.50 | $18.50 | $25.00 | 3% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $5,500 | $8,000 | $3,000 | $3,798 | $15,000 | 3% |
| 602E20000 CONCRETE MASONRY | 3.3 CY | $1,550 | $2,000 | $3,100 | $1,842 | $1,800 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,000 | $4,001 | $721 | $5,257 | $2,500 | 2% |
| 203E10000 EXCAVATION | 218 CY | $18.50 | $20.00 | $18.50 | $25.50 | $25.00 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,500 | $3,845 | $2,000 | $5,000 | $10,000 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $3,500 | $3,000 | $5,500 | $11,754 | $30,000 | 2% |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 36 CY | $80.00 | $125 | $76.50 | $104 | $100 | 1% |
| 253E02000 PAVEMENT REPAIR | 50 CY | $55.00 | $250 | $445 | $389 | $25.00 | 1% |
| $3.00 |
| $2.50 |
| $2.50 |
| $2.50 |
| $2.00 |
| 601E32110 ROCK CHANNEL PROTECTION, TYPE B WITH AGGREGATE FIL | 12 CY | $125 | $150 | $182 | $170 | $100 |
| 659E10000 SEEDING AND MULCHING | 1,085 SY | $2.00 | $2.00 | $1.50 | $3.00 | $10.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 54 SY | $0.60 | $1.00 | $8.50 | $1.00 | $0.20 |
| 659E20000 COMMERCIAL FERTILIZER | 0.15 TON | $450 | $550 | $441 | $526 | $1,200 |
| 659E31000 LIME | 0.22 ACRE | $125 | $75.00 | $175 | $211 | $800 |
| 659E35000 WATER | 6 MGAL | $1.00 | $1.00 | $120 | $1.00 | $1.00 |
| 407E10000 TACK COAT | 159 GAL | $3.00 | $3.00 | $2.00 | $2.00 | $10.00 |
| 621E00100 RPM | 5 EACH | $129 | $400 | $481 | $421 | $1,200 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 5 EACH | $20.00 | $20.00 | $29.50 | $12.50 | $50.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.08 MILE | $1,299 | $11,394 | $13,000 | $11,979 | $35,000 |
| 642E00300 CENTER LINE, TYPE 1 | 0.04 MILE | $1,440 | $22,788 | $28,000 | $23,957 | $35,000 |
| 407E10000 TACK COAT | 200 GAL | $2.00 | $3.00 | $2.00 | $2.00 | $1.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 8 HOUR | $65.00 | $75.00 | $78.00 | $68.50 | $25.00 |
| 616E10000 WATER | 5 MGAL | $1.00 | $1.00 | $0.20 | $28.00 | $1.00 |
| 619E16000 FIELD OFFICE, TYPE A | 1 MNTH | $1,450 | $500 | $1,200 | $684 | $100 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E53300 53" X 83" CONDUIT, TYPE A, 706.04 | 90 FT | $665 | $60k | 27% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 98 CY | $250 | $25k | 11% |
| 624E10000 MOBILIZATION | 1 LS | $18,000 | $18k | 8% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 41 CY | $350 | $14k | 7% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 100 CY | $110 | $11k | 5% |
| 202E11001 STRUCTURE REMOVED, AS PER PLAN (60"x108" BOX CULV | 1 LS | $8,500 | $9k | 4% |
| 304E20000 AGGREGATE BASE | 88 CY | $85 | $7k | 3% |
| 203E20000 EMBANKMENT | 368 CY | $18.5 | $7k | 3% |
| 832E30000 EROSION CONTROL | 6,000 EACH | $1 | $6k | 3% |
| 503E21320 UNCLASSIFIED EXCAVATION, INCLUDING ROCK (HEADWALLS | 1 LS | $6,000 | $6k | 3% |