ROS-SR 327-03.88
ROS County · est $0.3M
Bid dateThursday, February 11—
ROS County · est $0.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 25 more items below.
| Item | Quantity | R1Axis Civil Construction LLC | R2Eclipse CO LLC | R3Alan Stone CO INC | R4Darby Creek Excavating INC | R5Heavy Highway Construction Company | R6LLC R C Construction Company And Son INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 611E26000 72" CONDUIT, TYPE A (FOR ALLOWABLE MATERIAL TYPES, | 90 FT | $550 | $460 | $526 | $460 | $750 | $950 | 24% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 102 CY | $220 | $196 | $244 | $216 | $270 | $325 | 11% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $44,867 | $17,000 |
| Item | Quantity | R1Axis Civil Construction LLC | R2Eclipse CO LLC | R3Alan Stone CO INC | R4Darby Creek Excavating INC | R5Heavy Highway Construction Company | R6LLC R C Construction Company And Son INC |
|---|---|---|---|---|---|---|---|
| 202E35100 PIPE REMOVED, 24" AND UNDER | 67 FT | $35.00 | $18.50 | $22.50 | $20.00 | $19.00 | $25.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 50 FT | $50.00 | $88.00 | $43.00 | $40.00 | $200 | $100 |
| 202E75000 FENCE REMOVED | 182 FT | $5.00 | $2.50 | $3.00 | $2.75 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $15,000 |
| $10,000 |
| $12,500 |
| 10% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 100 CY | $110 | $227 | $283 | $270 | $260 | $50.00 | 5% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 37 CY | $280 | $227 | $283 | $370 | $419 | $425 | 5% |
| 203E10000 EXCAVATION | 414 CY | $20.00 | $10.00 | $18.00 | $30.00 | $18.00 | $20.00 | 4% |
| 203E20000 EMBANKMENT | 425 CY | $18.00 | $11.00 | $14.00 | $30.00 | $22.00 | $20.00 | 4% |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 75 CY | $100 | $70.00 | $78.00 | $75.00 | $85.00 | $100 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $7,500 | $7,705 | $8,000 | $10,000 | $3,500 | $25,000 | 4% |
| 304E20000 AGGREGATE BASE | 81 CY | $90.00 | $67.00 | $75.00 | $65.00 | $65.00 | $100 | 4% |
| 607E15000 FENCE, TYPE 47 | 270 FT | $25.70 | $19.00 | $24.00 | $20.35 | $83.00 | $65.00 | 3% |
| 602E20000 CONCRETE MASONRY | 5.6 CY | $1,200 | $780 | $1,100 | $1,000 | $1,500 | $1,750 | 3% |
| 832E30000 EROSION CONTROL | 6,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 3% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $5,800 | $3,679 | $2,200 | $10,000 | $20,000 | $15,000 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,500 | $3,496 | $500 | $2,500 | $3,000 | $3,500 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,500 | $5,867 | $5,800 | $4,000 | $3,500 | $12,500 | 3% |
| 611E10900 24" CONDUIT, TYPE D | 40 FT | $120 | $75.00 | $102 | $105 | $75.00 | $100 | 2% |
| 202E23000 PAVEMENT REMOVED | 444 SY | $10.00 | $9.50 | $14.00 | $10.00 | $22.00 | $20.00 | 2% |
| 607E40500 GATE, TYPE 47 | 1 EACH | $3,000 | $1,154 | $1,400 | $1,232 | $425 | $1,800 | 1% |
| 611E07900 18" CONDUIT, TYPE D | 50 FT | $60.00 | $54.50 | $76.50 | $95.00 | $60.00 | $100 | 1% |
| $3.00 |
| $10.00 |
| 202E75250 GATE REMOVED | 2 EACH | $40.00 | $129 | $161 | $140 | $500 | $500 |
| 204E10000 SUBGRADE COMPACTION | 837 SY | $3.50 | $1.50 | $3.00 | $2.00 | $5.00 | $2.00 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $2,850 | $1,752 | $2,400 | $8,000 | $20,000 | $12,500 |
| 601E32010 ROCK CHANNEL PROTECTION, TYPE A WITH AGGREGATE FIL | 25 CY | $85.00 | $65.50 | $120 | $100 | $150 | $125 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 1 CY | $200 | $172 | $539 | $200 | $500 | $100 |
| 659E10000 SEEDING AND MULCHING | 1,276 SY | $2.00 | $2.50 | $2.00 | $3.58 | $3.00 | $5.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 64 SY | $0.50 | $2.50 | $3.00 | $1.10 | $2.00 | $0.20 |
| 659E20000 COMMERCIAL FERTILIZER | 0.17 TON | $350 | $629 | $520 | $550 | $500 | $1,200 |
| 659E31000 LIME | 0.26 ACRE | $300 | $82.50 | $198 | $220 | $1,000 | $800 |
| 659E35000 WATER | 7 MGAL | $1.00 | $1.00 | $13.00 | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 110 FT | $14.00 | $13.00 | $10.50 | $30.00 | $20.00 | $10.00 |
| 407E10000 TACK COAT | 72 GAL | $3.00 | $2.00 | $2.50 | $1.92 | $8.00 | $10.00 |
| 621E00100 RPM | 4 EACH | $750 | $577 | $965 | $710 | $1,000 | $1,500 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 4 EACH | $35.00 | $13.00 | $37.00 | $50.00 | $25.00 | $50.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.07 MILE | $6,614 | $14,008 | $16,000 | $1,673 | $15,500 | $12,500 |
| 642E00300 CENTER LINE, TYPE 1 | 0.04 MILE | $11,925 | $14,008 | $28,000 | $1,190 | $15,500 | $12,500 |
| 253E02000 PAVEMENT REPAIR | 50 CY | $55.00 | $278 | $347 | $368 | $300 | $25.00 |
| 407E10000 TACK COAT | 200 GAL | $2.00 | $2.00 | $2.50 | $1.92 | $8.00 | $1.00 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 20 CY | $60.00 | $63.00 | $89.50 | $300 | $100 | $20.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 8 HOUR | $50.00 | $67.00 | $83.50 | $90.00 | $75.00 | $20.00 |
| 616E10000 WATER | 5 MGAL | $1.00 | $24.00 | $0.30 | $1.00 | $5.00 | $1.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,000 | $3,750 | $2,000 | $3,000 | $3,645 | $10,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E26000 72" CONDUIT, TYPE A (FOR ALLOWABLE MATERIAL TYPES, | 90 FT | $550 | $50k | 21% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 102 CY | $220 | $22k | 10% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 9% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 100 CY | $110 | $11k | 5% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 37 CY | $280 | $10k | 4% |
| 203E10000 EXCAVATION | 414 CY | $20 | $8k | 4% |
| 203E20000 EMBANKMENT | 425 CY | $18 | $8k | 3% |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 75 CY | $100 | $8k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $7,500 | $8k | 3% |
| 304E20000 AGGREGATE BASE | 81 CY | $90 | $7k | 3% |