WOO-SR 199-17.68 Brdg Repl.
WOO County · est $0.4M
Bid dateThursday, February 25—
WOO County · est $0.4M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 34 more items below.
| Item | Quantity | R1Vernon Nagel INC | R2Great Lakes Demolition Company | R3Eclipse CO LLC | % of bid |
|---|---|---|---|---|---|
| 611E96315 14' X 6' CONDUIT, TYPE A, 706.05, AS PER PLAN, DES | 96 FT | $1,125 | $950 | $1,053 | 42% |
| 511E46210 CLASS QC1 CONCRETE, RETAINING/WINGWALL INCLUDING F | 46 CY | $600 | $800 | $945 | 11% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 103 CY | $215 | $167 | $200 | 9% |
| 611E16600 36" CONDUIT, TYPE C, 706.02 | 89 FT | $165 | $155 | $162 | 6% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 43 CY | $250 | $220 | $297 | 4% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $10,000 | $8,500 | $10,560 | 4% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 3,616 LB | $2.00 |
| Item | Quantity | R1Vernon Nagel INC | R2Great Lakes Demolition Company | R3Eclipse CO LLC |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $500 | $500 | $3,699 |
| 202E23500 WEARING COURSE REMOVED | 55 SY | $20.00 | $6.00 | $16.50 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 87 FT | $5.00 | $10.00 | $30.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 124 FT | $8.00 | $17.00 | $31.50 |
| 202E38000 GUARDRAIL REMOVED | 462.5 FT | $3.00 | $1.50 | $3.00 |
| 202E38500 BRIDGE RAILING REMOVED |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $1.70 |
| $4.00 |
| 3% |
| 512E33000 TYPE 2 WATERPROOFING | 357 SY | $20.00 | $50.00 | $15.50 | 3% |
| 304E20000 AGGREGATE BASE | 109 CY | $65.00 | $55.00 | $49.50 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,500 | $10,000 | $8,500 | 2% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $5,200 | $1,000 | $4,984 | 2% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $5,000 | $8,750 | $4,571 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $5,000 | $22,600 | $27,000 | 2% |
| 203E20000 EMBANKMENT | 212 CY | $20.00 | $23.00 | $17.50 | 2% |
| 659E00300 TOPSOIL | 168 CY | $25.00 | $60.00 | $68.00 | 2% |
| 202E23000 PAVEMENT REMOVED | 397 SY | $10.00 | $8.00 | $13.50 | 2% |
| 611E98470 CATCH BASIN, NO. 2-2B | 2 EACH | $1,500 | $1,050 | $2,610 | 1% |
| 611E98540 CATCH BASIN, NO. 2-4 | 1 EACH | $3,000 | $1,600 | $3,309 | 1% |
| 611E04400 12" CONDUIT, TYPE B | 44 FT | $65.00 | $45.00 | $69.00 | 1% |
| 611E06100 15" CONDUIT, TYPE C | 45 FT | $60.00 | $50.00 | $64.50 | 1% |
| 50 FT |
| $8.00 |
| $9.00 |
| $16.00 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 3 EACH | $185 | $175 | $195 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 5 EACH | $145 | $185 | $153 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $300 | $250 | $675 |
| 203E10000 EXCAVATION | 74 CY | $30.00 | $15.00 | $25.50 |
| 204E10000 SUBGRADE COMPACTION | 616 SY | $1.00 | $1.00 | $3.00 |
| 209E60200 LINEAR GRADING | 7 STA | $100 | $15.00 | $145 |
| 623E38500 MONUMENT ASSEMBLY | 3 EACH | $650 | $850 | $1,090 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 20 CY | $75.00 | $95.00 | $78.50 |
| 659E10000 SEEDING AND MULCHING | 1,512 SY | $1.35 | $2.00 | $2.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.14 TON | $600 | $400 | $474 |
| 659E35000 WATER | 1 MGAL | $1.00 | $5.00 | $10.50 |
| 832E30000 EROSION CONTROL | 2,000 EACH | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 0.96 CY | $1,200 | $900 | $2,338 |
| 611E01500 6" CONDUIT, TYPE F | 20 FT | $10.00 | $10.00 | $25.50 |
| 611E02600 8" CONDUIT, TYPE F | 20 FT | $12.00 | $15.00 | $27.50 |
| 611E05200 12" CONDUIT, TYPE F | 30 FT | $45.00 | $30.00 | $21.50 |
| 407E20000 NON-TRACKING TACK COAT | 86 GAL | $5.00 | $4.00 | $2.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 2 EACH | $10.00 | $20.00 | $11.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 9 FT | $24.00 | $25.00 | $7.50 |
| 630E80100 SIGN, FLAT SHEET | 1 SF | $48.00 | $50.00 | $25.50 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 5 EACH | $10.00 | $15.00 | $10.50 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $10.00 | $15.00 | $21.00 |
| 202E22900 APPROACH SLAB REMOVED | 36 SY | $30.00 | $10.00 | $39.50 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 47 SY | $10.00 | $25.00 | $9.50 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 34 SF | $6.00 | $10.00 | $6.00 |
| 518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 1 LS | $2,000 | $4,600 | $1,590 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $2,500 | $3,500 | $3,566 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,500 | $2,800 | $7,866 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E96315 14' X 6' CONDUIT, TYPE A, 706.05, AS PER PLAN, DES | 96 FT | $1,125 | $108k | 37% |
| 511E46210 CLASS QC1 CONCRETE, RETAINING/WINGWALL INCLUDING F | 46 CY | $600 | $28k | 10% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 103 CY | $215 | $22k | 8% |
| 611E16600 36" CONDUIT, TYPE C, 706.02 | 89 FT | $165 | $15k | 5% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 43 CY | $250 | $11k | 4% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $10,000 | $10k | 3% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 3,616 LB | $2 | $7k | 2% |
| 512E33000 TYPE 2 WATERPROOFING | 357 SY | $20 | $7k | 2% |
| 304E20000 AGGREGATE BASE | 109 CY | $65 | $7k | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,500 | $6k | 2% |