ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 25 more items below.
| Item | Quantity | R1Black Horse Bridge Construction INC | R2Bcc Ohio INC | R3Eclipse CO LLC | R4Great Lakes Demolition Company | R5Rietschlin Construction INC | % of bid |
|---|---|---|---|---|---|---|---|
| 611E95800 12' X 6' CONDUIT, TYPE A, 706.05 | 70 FT | $970 | $1,065 | $887 | $1,000 | $1,318 | 30% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $15,500 | $2,340 | $5,500 | $2,500 | $10,500 | 7% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 33 CY | $460 | $774 | $705 | $950 | $490 | 7% |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 11 CY | $1,350 | $1,155 | $2,531 | $950 | $1,050 | 7% |
| 203E20000 EMBANKMENT | 550 CY | $26.00 | $30.55 | $4.50 | $22.00 | $14.00 | 6% |
| 202E11001 STRUCTURE REMOVED, AS PER PLAN | 1 LS |
| Item | Quantity | R1Black Horse Bridge Construction INC | R2Bcc Ohio INC | R3Eclipse CO LLC | R4Great Lakes Demolition Company | R5Rietschlin Construction INC |
|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 130 SY | $18.00 | $4.97 | $8.50 | $8.00 | $13.25 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 117 FT | $8.00 | $4.88 | $9.50 | $8.00 | $27.75 |
| 203E10000 EXCAVATION | 106 CY | $10.00 | $9.75 | $21.00 | $19.00 | $23.00 |
| 204E10000 SUBGRADE COMPACTION | 289 SY | $4.00 | $1.46 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $13,000 |
| $7,800 |
| $4,425 |
| $5,000 |
| $9,300 |
| 6% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 4,516 LB | $2.50 | $1.73 | $2.50 | $1.50 | $1.75 | 5% |
| 442E10501 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 32 CY | $324 | $340 | $334 | $310 | $350 | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 67 CY | $151 | $159 | $156 | $195 | $163 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $6,771 | $15,754 | $15,000 | $18,000 | 4% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 71 CY | $100 | $129 | $99.00 | $110 | $96.00 | 3% |
| 304E20000 AGGREGATE BASE | 86 CY | $75.00 | $91.95 | $58.50 | $55.00 | $94.00 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,000 | $1,635 | $9,500 | $5,925 | $1,000 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $2,445 | $9,500 | $3,000 | $3,000 | 2% |
| 503E21100 UNCLASSIFIED EXCAVATION | 33 CY | $125 | $83.78 | $22.50 | $50.00 | $392 | 2% |
| 614E12420 DETOUR SIGNING | 1 LS | $4,000 | $5,500 | $4,076 | $5,000 | $3,100 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,600 | $780 | $2,490 | $1,000 | $5,000 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,500 | $3,151 | $7,500 | $10,000 | $3,500 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3.0") | 130 SY | $24.00 | $25.20 | $24.50 | $19.00 | $26.00 | 1% |
| 518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 1 LS | $2,800 | $1,046 | $2,540 | $15,000 | $2,400 | 1% |
| $2.00 |
| $2.00 |
| $6.00 |
| 623E38500 MONUMENT ASSEMBLY | 2 EACH | $1,000 | $1,429 | $1,120 | $1,500 | $1,020 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $300 | $158 | $155 | $450 | $54.00 |
| 659E00300 TOPSOIL | 198 CY | $14.00 | $50.62 | $60.50 | $50.00 | $30.00 |
| 659E10000 SEEDING AND MULCHING | 1,788 SY | $0.75 | $2.89 | $1.50 | $1.90 | $2.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 89 SY | $2.00 | $0.95 | $1.50 | $1.00 | $1.00 |
| 659E15000 INTER-SEEDING | 89 SY | $1.00 | $0.11 | $1.50 | $1.00 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.25 TON | $800 | $517 | $629 | $800 | $800 |
| 659E31000 LIME | 0.37 ACRE | $200 | $31.51 | $82.51 | $500 | $100 |
| 659E35000 WATER | 9.9 MGAL | $1.00 | $1.05 | $1.00 | $10.00 | $10.00 |
| 832E30000 EROSION CONTROL | 2,500 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 54 FT | $20.00 | $10.55 | $12.00 | $15.00 | $20.00 |
| 611E04900 12" CONDUIT, TYPE D | 45 FT | $30.00 | $75.71 | $35.50 | $40.00 | $43.00 |
| 611E06400 15" CONDUIT, TYPE D | 32 FT | $35.00 | $106 | $39.00 | $51.00 | $54.00 |
| 611E07900 18" CONDUIT, TYPE D | 40 FT | $30.00 | $137 | $44.50 | $62.00 | $54.00 |
| 407E10000 TACK COAT | 50 GAL | $2.35 | $2.47 | $2.50 | $5.00 | $2.75 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.06 MILE | $11,505 | $26,250 | $25,750 | $11,505 | $12,500 |
| 642E00300 CENTER LINE, TYPE 1 | 0.03 MILE | $15,340 | $26,250 | $25,750 | $15,430 | $16,600 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 51 SY | $36.00 | $27.66 | $26.00 | $50.00 | $49.00 |
| 512E33000 TYPE 2 WATERPROOFING | 124 SY | $20.00 | $25.35 | $22.00 | $30.00 | $20.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 3 SF | $12.00 | $17.25 | $23.50 | $10.02 | $174 |
| 619E16010 FIELD OFFICE, TYPE B | 4 MNTH | $500 | $1,513 | $525 | $500 | $1,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E95800 12' X 6' CONDUIT, TYPE A, 706.05 | 70 FT | $970 | $68k | 27% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $15,500 | $16k | 6% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 33 CY | $460 | $15k | 6% |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 11 CY | $1,350 | $15k | 6% |
| 203E20000 EMBANKMENT | 550 CY | $26 | $14k | 6% |
| 202E11001 STRUCTURE REMOVED, AS PER PLAN | 1 LS | $13,000 | $13k | 5% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 4,516 LB | $2.5 | $11k | 4% |
| 442E10501 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 32 CY | $324 | $10k | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 67 CY | $151 | $10k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10k | 4% |