| Item | Quantity | R1Great Lakes Demolition Company | R2Eclipse CO LLC | R3Vernon Nagel INC | % of bid |
|---|---|---|---|---|---|
| 611E96448 16' X 7' CONDUIT, TYPE A, 706.05 | 55 FT | $1,375 | $2,213 | $2,350 | 27% |
| 624E10000 MOBILIZATION | 1 LS | $58,500 | $16,129 | $10,000 | 21% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 44 CY | $500 | $510 | $1,000 | 8% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 14 CY | $900 | $1,488 | $1,500 | 4% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 5,474 LB | $2.25 | $3.00 | $2.85 | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 50 CY | $225 | $225 | $185 | 4% |
| 442E10501 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 36 CY | $300 |
| Item | Quantity | R1Great Lakes Demolition Company | R2Eclipse CO LLC | R3Vernon Nagel INC |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $500 | $3,000 | $1,000 |
| 202E23000 PAVEMENT REMOVED | 294 SY | $9.00 | $16.00 | $18.00 |
| 202E38000 GUARDRAIL REMOVED | 372.5 FT | $2.00 | $2.00 | $2.00 |
| 202E38500 BRIDGE RAILING REMOVED | 50 FT | $5.00 | $7.00 | $6.50 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 1 EACH | $250 | $240 | $215 |
| 202E42040 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $300 |
| $300 |
| 4% |
| 202E11001 STRUCTURE REMOVED, AS PER PLAN | 1 LS | $10,500 | $20,787 | $42,000 | 4% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $8,500 | $8,500 | $8,000 | 3% |
| 614E12420 DETOUR SIGNING | 1 LS | $7,500 | $4,350 | $6,000 | 3% |
| 659E00300 TOPSOIL | 149 CY | $45.00 | $39.00 | $25.00 | 2% |
| 518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 1 LS | $6,500 | $1,212 | $12,000 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $6,500 | $3,000 | $3,500 | 2% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 68 CY | $90.00 | $91.00 | $125 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3.0 INCH) | 144 SY | $35.00 | $32.00 | $50.00 | 2% |
| 304E20000 AGGREGATE BASE | 80 CY | $60.00 | $77.00 | $134 | 2% |
| 203E20000 EMBANKMENT | 313 CY | $15.00 | $14.00 | $30.00 | 2% |
| 512E33000 TYPE 2 WATERPROOFING | 228 SY | $20.00 | $28.00 | $30.00 | 2% |
| 503E21300 UNCLASSIFIED EXCAVATION (WINGWALL FOOTING) | 1 LS | $4,500 | $4,500 | $12,000 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,500 | $7,500 | $5,200 | 2% |
| 3 EACH |
| $150 |
| $151 |
| $135 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 4 EACH | $150 | $106 | $95.00 |
| 203E10000 EXCAVATION | 100 CY | $15.00 | $8.00 | $30.00 |
| 204E10000 SUBGRADE COMPACTION | 322 SY | $2.00 | $2.00 | $1.00 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $300 | $112 | $70.00 |
| 659E10000 SEEDING AND MULCHING | 1,342 SY | $2.00 | $3.00 | $3.95 |
| 659E14000 REPAIR SEEDING AND MULCHING | 67 SY | $1.00 | $1.00 | $0.45 |
| 659E15000 INTER-SEEDING | 67 SY | $1.00 | $0.11 | $0.10 |
| 659E20000 COMMERCIAL FERTILIZER | 0.18 TON | $1,000 | $391 | $350 |
| 659E31000 LIME | 0.28 ACRE | $800 | $28.00 | $25.00 |
| 659E35000 WATER | 7.25 MGAL | $5.00 | $1.00 | $1.00 |
| 670E00520 SLOPE EROSION PROTECTION MAT, TYPE B | 36 SY | $10.00 | $5.00 | $4.50 |
| 832E30000 EROSION CONTROL | 2,000 EACH | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 47 FT | $15.00 | $16.00 | $15.00 |
| 407E10000 TACK COAT | 48 GAL | $5.00 | $2.00 | $2.35 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 12 FT | $45.00 | $8.00 | $45.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $65.00 | $229 | $65.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1 EACH | $15.00 | $30.00 | $15.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.06 MILE | $19,150 | $25,500 | $19,200 |
| 642E00300 CENTER LINE, TYPE 1 | 0.03 MILE | $25,500 | $25,500 | $25,500 |
| 202E22900 APPROACH SLAB REMOVED | 111 SY | $20.00 | $45.00 | $50.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $1,500 | $30,000 | $12,000 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 1 CY | $1,500 | $2,766 | $3,200 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 35 SY | $25.00 | $32.00 | $40.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 42 SF | $10.00 | $6.00 | $10.00 |
| 619E16000 FIELD OFFICE, TYPE A | 3 MNTH | $500 | $1,339 | $2,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E96448 16' X 7' CONDUIT, TYPE A, 706.05 | 55 FT | $1,375 | $76k | 24% |
| 624E10000 MOBILIZATION | 1 LS | $58,500 | $59k | 19% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 44 CY | $500 | $22k | 7% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 14 CY | $900 | $13k | 4% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 5,474 LB | $2.25 | $12k | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 50 CY | $225 | $11k | 4% |
| 442E10501 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 36 CY | $300 | $11k | 3% |
| 202E11001 STRUCTURE REMOVED, AS PER PLAN | 1 LS | $10,500 | $11k | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $8,500 | $9k | 3% |
| 614E12420 DETOUR SIGNING | 1 LS | $7,500 | $8k | 2% |