BRO-US 68-30.82 Safety
BRO County · est $1.8M
Bid dateThursday, June 17—
BRO County · est $1.8M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 187 more items below.
| Item | Quantity | R1Shelly Company | R2Complete General Construction Company | R3Sunesis Construction CO | R4Axis Civil Construction LLC | R5Eclipse CO LLC | R6John R Jurgensen Company | % of bid |
|---|---|---|---|---|---|---|---|---|
| 611E71000 CONDUIT, TYPE A, PRECAST REINFORCED CONCRETE ARCH | 42 FT | $4,305 | $3,300 | $4,134 | $4,100 | $4,910 | $4,335 | 17% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $40,000 | $115,862 | $100,000 | $100,000 | $100,000 | 9% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 474 CY | $210 | $210 | $170 |
| Item | Quantity | R1Shelly Company | R2Complete General Construction Company | R3Sunesis Construction CO | R4Axis Civil Construction LLC | R5Eclipse CO LLC | R6John R Jurgensen Company |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $15,000 | $10,000 | $5,333 | $20,000 | $5,409 | $12,047 |
| 202E32000 CURB REMOVED | 19 FT | $31.00 | $12.00 | $21.14 | $15.00 | $10.50 | $35.15 |
| 202E32500 CURB AND GUTTER REMOVED | 552 FT | $8.50 | $8.00 | $6.78 | $10.00 | $4.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $220 |
| $172 |
| $170 |
| 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $83,500 | $60,000 | $41,399 | $100,000 | $212,003 | $251,607 | 8% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 316 CY | $208 | $208 | $215 | $208 | $215 | $215 | 6% |
| 452E12011 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P, | 385 SY | $139 | $130 | $138 | $135 | $115 | $105 | 5% |
| 204E30020 GRANULAR MATERIAL, TYPE C, 12" | 1,113 CY | $40.50 | $46.00 | $60.52 | $72.00 | $48.00 | $54.39 | 4% |
| 452E10011 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P, | 422 SY | $100 | $95.00 | $113 | $98.00 | $89.00 | $85.09 | 4% |
| 202E23000 PAVEMENT REMOVED | 2,897 SY | $14.00 | $17.00 | $5.77 | $12.00 | $10.50 | $13.66 | 4% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $40,000 | $26,000 | $66,386 | $38,000 | $48,000 | $69,026 | 4% |
| 203E20000 EMBANKMENT | 2,316 CY | $17.00 | $17.00 | $9.72 | $24.00 | $14.75 | $19.95 | 4% |
| 632E72151 SIGNAL SUPPORT, TYPE TC-81.22, DESIGN 14, AS PER P | 2 EACH | $16,475 | $16,800 | $16,707 | $16,475 | $16,700 | $16,475 | 3% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 18 SNMT | $1,800 | $1,200 | $900 | $950 | $974 | $900 | 3% |
| 511E46001 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 50 SY | $625 | $900 | $1,101 | $595 | $1,100 | $959 | 3% |
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 148 CY | $210 | $210 | $180 | $210 | $181 | $180 | 3% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 180 CY | $170 | $200 | $404 | $260 | $188 | $379 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $30,000 | $15,000 | $11,416 | $12,500 | $34,500 | $9,882 | 3% |
| 452E09010 4" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 324 SY | $89.00 | $53.00 | $95.36 | $50.00 | $67.50 | $47.09 | 3% |
| 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 115 CY | $249 | $249 | $200 | $249 | $202 | $200 | 3% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 53 CY | $520 | $430 | $577 | $495 | $670 | $874 | 3% |
| $8.00 |
| 202E38000 GUARDRAIL REMOVED | 268 FT | $2.00 | $10.00 | $10.00 | $5.00 | $2.50 | $2.00 |
| 203E10000 EXCAVATION | 1,176 CY | $21.50 | $11.00 | $39.03 | $24.00 | $12.50 | $18.30 |
| 606E15050 GUARDRAIL, TYPE MGS | 176 FT | $34.00 | $28.25 | $28.25 | $28.25 | $39.00 | $34.00 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 3 EACH | $1,220 | $1,125 | $1,125 | $1,125 | $1,277 | $1,220 |
| 606E35000 BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 1 EACH | $1,050 | $2,200 | $2,200 | $2,200 | $1,104 | $1,050 |
| 608E10000 4" CONCRETE WALK | 2,446 SF | $7.50 | $7.25 | $7.54 | $8.00 | $8.00 | $7.70 |
| 608E52000 CURB RAMP | 346 SF | $16.50 | $21.00 | $17.71 | $18.00 | $24.00 | $18.43 |
| 608E53020 DETECTABLE WARNING | 66 SF | $13.25 | $44.00 | $30.00 | $25.00 | $23.00 | $24.00 |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 903 FT | $28.00 | $44.00 | $31.86 | $36.00 | $40.00 | $34.79 |
| 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN | 638 FT | $28.00 | $37.00 | $32.10 | $38.00 | $40.50 | $37.81 |
| 609E18000 COMBINATION CURB AND GUTTER, TYPE 3 | 325 FT | $28.00 | $39.00 | $32.02 | $41.00 | $42.00 | $38.54 |
| 609E26000 CURB, TYPE 6 | 636 FT | $25.00 | $26.00 | $29.11 | $35.00 | $35.00 | $20.79 |
| 609E28000 CURB, TYPE 7 | 110 FT | $32.00 | $50.00 | $34.97 | $40.00 | $49.00 | $33.45 |
| 625E31506 PULL BOX REMOVED AND REPLACED | 2 EACH | $1,400 | $1,500 | $1,420 | $1,400 | $1,515 | $1,400 |
| 638E10300 FIRE HYDRANT EXTENDED AND ADJUSTED TO GRADE | 1 EACH | $2,000 | $1,675 | $1,350 | $2,800 | $1,557 | $1,521 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 2 EACH | $300 | $250 | $262 | $400 | $261 | $484 |
| 659E00100 SOIL ANALYSIS TEST | 1 EACH | $200 | $100 | $155 | $100 | $217 | $200 |
| 659E00300 TOPSOIL | 524 CY | $22.75 | $22.00 | $60.84 | $32.00 | $32.50 | $52.12 |
| 659E10000 SEEDING AND MULCHING | 3,501 SY | $1.25 | $1.70 | $2.63 | $1.70 | $1.30 | $1.25 |
| 659E14000 REPAIR SEEDING AND MULCHING | 177 SY | $1.00 | $1.70 | $1.76 | $1.70 | $1.00 | $1.00 |
| 659E15000 INTER-SEEDING | 177 SY | $0.01 | $1.70 | $0.52 | $1.70 | $0.01 | $0.01 |
| 659E20000 COMMERCIAL FERTILIZER | 0.51 TON | $500 | $610 | $829 | $610 | $541 | $0.51 |
| 659E31000 LIME | 0.74 ACRE | $200 | $80.00 | $62.19 | $80.00 | $217 | $200 |
| 659E35000 WATER | 19.6 MGAL | $1.00 | $1.00 | $1.04 | $1.00 | $1.00 | $1.00 |
| 670E00500 SLOPE EROSION PROTECTION | 1,198 SY | $2.25 | $2.00 | $2.28 | $2.00 | $2.50 | $2.25 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,500 | $1,500 | $1,425 | $1,500 | $3,500 | $1,425 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $1,260 | $2,400 | $5,460 | $6,500 | $3,300 | $2,280 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $7,540 | $7,500 | $6,638 | $9,000 | $8,000 | $6,638 |
| 832E30000 EROSION CONTROL | 20,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 202E58100 CATCH BASIN REMOVED | 3 EACH | $280 | $450 | $472 | $750 | $420 | $820 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 10 SY | $150 | $140 | $178 | $110 | $78.00 | $187 |
| 605E05100 4" SHALLOW PIPE UNDERDRAINS, 30" DEPTH | 1,081 FT | $11.00 | $12.00 | $11.34 | $15.00 | $9.99 | $23.11 |
| 605E05200 4" UNCLASSIFIED PIPE UNDERDRAINS | 120 FT | $11.00 | $16.00 | $11.63 | $15.00 | $7.50 | $51.06 |
| 605E06000 4" BASE PIPE UNDERDRAINS, 18" DEPTH | 668 FT | $9.75 | $9.00 | $7.87 | $15.00 | $8.50 | $22.86 |
| 605E06000 4" BASE PIPE UNDERDRAINS, 30" DEPTH | 592 FT | $11.75 | $12.00 | $16.49 | $15.00 | $10.50 | $24.48 |
| 605E31100 AGGREGATE DRAINS | 80 FT | $14.00 | $9.50 | $8.71 | $15.00 | $11.00 | $23.71 |
| 611E00406 4" CONDUIT, TYPE F | 160 FT | $22.25 | $17.00 | $18.88 | $15.00 | $9.50 | $48.99 |
| 611E04400 12" CONDUIT, TYPE B | 35 FT | $90.75 | $150 | $69.54 | $120 | $90.50 | $208 |
| 611E04400 12" CONDUIT, TYPE B707.42 | 28 FT | $84.75 | $150 | $85.03 | $120 | $90.50 | $233 |
| 611E98150 CATCH BASIN, NO. 3 | 3 EACH | $3,000 | $3,500 | $3,840 | $3,600 | $3,208 | $2,874 |
| 611E99574 MANHOLE, NO. 3 | 1 EACH | $3,725 | $4,000 | $3,281 | $4,500 | $4,333 | $1,885 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 2 EACH | $845 | $950 | $483 | $800 | $406 | $484 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 4 EACH | $365 | $270 | $353 | $450 | $230 | $427 |
| 204E13000 EXCAVATION OF SUBGRADE, 12" AS PER PLAN | 1,113 CY | $19.25 | $19.50 | $26.79 | $20.00 | $19.00 | $29.19 |
| 204E45000 PROOF ROLLING | 2.4 HOUR | $210 | $265 | $235 | $190 | $209 | $206 |
| 204E50000 GEOTEXTILE FABRIC, 712.09, TYPE D | 3,254 SY | $1.50 | $1.70 | $1.18 | $1.20 | $1.50 | $2.70 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 818 FT | $2.75 | $3.00 | $2.61 | $3.50 | $3.00 | $3.00 |
| 253E01000 PAVEMENT REPAIR | 16 SY | $51.00 | $185 | $270 | $130 | $350 | $350 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.25" | 3,154 SY | $1.65 | $1.65 | $3.75 | $1.65 | $3.75 | $3.75 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 5,133 SY | $1.60 | $1.60 | $6.00 | $1.60 | $6.00 | $6.00 |
| 304E20000 AGGREGATE BASE | 377 CY | $50.00 | $80.00 | $71.67 | $82.00 | $52.50 | $111 |
| 407E20000 NON-TRACKING TACK COAT | 976 GAL | $3.05 | $3.25 | $3.50 | $3.25 | $3.75 | $3.50 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (52 CY | $187 | $187 | $180 | $187 | $180 | $180 |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT-C TRANSFORMER BASE | 7 EACH | $2,700 | $2,300 | $2,738 | $2,700 | $2,705 | $2,700 |
| 625E14000 LIGHT POLE FOUNDATION, 24" X 6' DEEP | 1 EACH | $1,775 | $1,650 | $1,800 | $1,775 | $1,775 | $1,775 |
| 625E14200 LIGHT POLE FOUNDATION, 24" X 10' DEEP | 7 EACH | $2,000 | $1,750 | $2,028 | $2,000 | $2,000 | $2,000 |
| 625E14501 LIGHT POLE FOUNDATION, AS PER PLAN | 1 EACH | $1,000 | $1,750 | $1,014 | $1,000 | $1,010 | $1,000 |
| 625E14600 LIGHT POLE FOUNDATION, MISC.: REUSE FOUNDATION | 2 EACH | $500 | $450 | $507 | $500 | $500 | $500 |
| 625E17960 BRACKET ARM, 8' | 7 EACH | $600 | $725 | $608 | $600 | $600 | $600 |
| 625E23306 NO. 10 AWG 600 VOLT DISTRIBUTION CABLE | 4,636 FT | $1.70 | $2.50 | $1.72 | $1.70 | $2.00 | $1.70 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 1,128 FT | $1.70 | $2.00 | $1.72 | $1.70 | $1.80 | $1.70 |
| 625E25100 CONDUIT, 1", 725.04 | 194 FT | $16.50 | $16.50 | $16.73 | $16.50 | $16.50 | $16.50 |
| 625E25101 CONDUIT, 1", 725.04, AS PER PLAN | 39 FT | $16.50 | $19.00 | $16.73 | $16.50 | $17.00 | $16.50 |
| 625E25104 CONDUIT, 1", 725.051 | 1,152 FT | $12.50 | $10.00 | $12.68 | $12.50 | $12.50 | $12.50 |
| 625E26252 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), TYPE I | 8 EACH | $750 | $650 | $761 | $750 | $760 | $750 |
| 625E30500 PULL BOX, 725.06, SIZE 1.5 | 1 EACH | $695 | $950 | $705 | $695 | $695 | $695 |
| 625E32000 GROUND ROD | 11 EACH | $265 | $275 | $269 | $265 | $287 | $265 |
| 625E34000 POWER SERVICE | 1 EACH | $9,500 | $12,000 | $9,634 | $9,500 | $10,000 | $9,500 |
| 625E40004 SPECIAL - MAINTAIN EXISTING LIGHTING | 2 EACH | $2,500 | $10,000 | $2,535 | $2,500 | $2,500 | $2,500 |
| 625E75400 LIGHT POLE REMOVED | 6 EACH | $500 | $350 | $507 | $500 | $500 | $500 |
| 625E75500 LIGHT POLE FOUNDATION REMOVED | 2 EACH | $500 | $500 | $507 | $500 | $500 | $500 |
| AA3 625E10481 LIGHT POLE, DECORATIVE, AS PER PLAN, ALTERNATE 3: | 4 EACH | $1,586 | $2,160 | $1,608 | $1,586 | $1,600 | $1,586 |
| AA3 625E27551 LUMINAIRE, DECORATIVE, AS PER PLAN, ALTERNATE 3: A | 4 EACH | $417 | $640 | $423 | $417 | $420 | $417 |
| 621E00100 RPM | 107 EACH | $50.00 | $37.95 | $37.95 | $55.00 | $40.00 | $37.95 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 50 EACH | $4.50 | $12.00 | $14.72 | $40.87 | $8.00 | $19.89 |
| 625E32001 GROUND ROD, AS PER PLAN | 12 EACH | $265 | $275 | $269 | $265 | $287 | $265 |
| 626E00112 BARRIER REFLECTOR, TYPE 3, ONE-WAY | 5 EACH | $8.00 | $15.00 | $15.00 | $15.00 | $12.00 | $11.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 430 FT | $12.00 | $11.00 | $11.00 | $11.00 | $14.00 | $13.00 |
| 630E04100 GROUND MOUNTED SUPPORT, NO. 4 POST | 14 FT | $13.50 | $16.00 | $16.00 | $16.00 | $15.00 | $14.00 |
| 630E08600 SIGN POST REFLECTOR | 12 EACH | $45.00 | $46.00 | $46.00 | $46.00 | $54.00 | $50.00 |
| 630E72540 OVERHEAD SIGN SUPPORT, TYPE TC-16.22, DESIGN 12 | 2 EACH | $12,300 | $14,300 | $14,300 | $14,300 | $12,500 | $12,300 |
| 630E72550 OVERHEAD SIGN SUPPORT, TYPE TC-16.22, DESIGN 13 | 1 EACH | $16,560 | $18,100 | $18,100 | $18,100 | $16,700 | $16,560 |
| 630E79101 SIGN HANGER ASSEMBLY, MAST ARM, AS PER PLAN | 26 EACH | $425 | $630 | $630 | $630 | $450 | $450 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 3 EACH | $165 | $115 | $115 | $115 | $135 | $125 |
| 630E80100 SIGN, FLAT SHEET | 429 SF | $14.00 | $20.25 | $20.25 | $20.25 | $30.50 | $28.00 |
| 630E80510 SIGN, STREET NAME | 5 EACH | $385 | $440 | $440 | $440 | $671 | $620 |
| 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION | 3 EACH | $3,500 | $7,800 | $7,800 | $7,800 | $3,500 | $3,500 |
| 630E85000 REMOVAL OF GROUND MOUNTED SIGN AND STORAGE | 25 EACH | $10.00 | $25.00 | $25.00 | $25.00 | $21.50 | $20.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 4 EACH | $60.00 | $85.00 | $85.00 | $85.00 | $92.00 | $85.00 |
| 630E86006 REMOVAL OF GROUND MOUNTED POST SUPPORT AND STORAGE | 22 EACH | $15.00 | $45.00 | $45.00 | $45.00 | $32.50 | $30.00 |
| 630E87510 REMOVAL OF POLE MOUNTED SIGN AND STORAGE | 4 EACH | $15.00 | $20.00 | $20.00 | $20.00 | $38.00 | $35.00 |
| 644E00104 EDGE LINE, 6", WHITE | 0.51 MILE | $3,615 | $6,585 | $6,469 | $7,906 | $3,910 | $6,469 |
| 644E00104 EDGE LINE, 6", YELLOW | 0.22 MILE | $3,561 | $6,585 | $6,373 | $7,999 | $3,852 | $6,373 |
| 644E00204 LANE LINE, 6", WHITE | 0.1 MILE | $1,725 | $4,670 | $4,378 | $4,889 | $1,866 | $4,378 |
| 644E00300 CENTER LINE, 4", DOUBLE YELLOW | 0.31 MILE | $7,360 | $7,295 | $7,295 | $12,810 | $7,962 | $7,295 |
| 644E00400 CHANNELIZING LINE, 8", WHITE | 2,629 FT | $1.50 | $1.15 | $1.15 | $2.25 | $1.50 | $1.15 |
| 644E00500 STOP LINE, 24 | 135 FT | $7.00 | $8.00 | $8.00 | $9.60 | $7.50 | $8.00 |
| 644E00600 CROSSWALK LINE, 12 | 148 FT | $3.50 | $6.00 | $6.00 | $4.65 | $3.65 | $6.00 |
| 644E00700 TRANSVERSE/DIAGONAL LINE, 24", WHITE | 15 FT | $9.50 | $7.85 | $7.85 | $8.90 | $9.75 | $7.85 |
| 644E00720 CHEVRON MARKING, 24", YELLOW | 42 FT | $9.50 | $7.85 | $7.85 | $8.90 | $9.65 | $7.85 |
| 644E01300 LANE ARROW | 40 EACH | $83.00 | $100 | $100 | $130 | $85.00 | $100 |
| 644E01514 DOTTED LINE, 8", WHITE | 374 FT | $2.25 | $1.10 | $1.10 | $4.00 | $2.30 | $1.10 |
| 644E20800 YIELD LINE, 24 | 58 FT | $35.17 | $8.35 | $8.35 | $11.25 | $38.00 | $8.35 |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 5,870 FT | $0.72 | $0.65 | $0.65 | $1.30 | $0.85 | $0.65 |
| 644E30020 REMOVAL OF PAVEMENT MARKING | 16 EACH | $90.00 | $150 | $150 | $70.00 | $97.50 | $150 |
| 646E10010 EDGE LINE, 6", WHITE | 0.05 MILE | $53,483 | $42,310 | $42,310 | $46,900 | $57,857 | $42,310 |
| 646E10200 CENTER LINE, 4", DOUBLE YELLOW | 0.03 MILE | $66,016 | $43,935 | $43,935 | $80,400 | $71,414 | $35,148 |
| 646E10300 CHANNELIZING LINE, 8", WHITE | 130 FT | $5.95 | $12.00 | $12.00 | $5.00 | $6.50 | $12.00 |
| 625E00450 CONNECTION, FUSED PULL APART | 19 EACH | $92.00 | $120 | $93.29 | $92.00 | $93.00 | $92.00 |
| 625E00460 CONNECTION, UNFUSED PULL APART | 5 EACH | $92.00 | $130 | $93.29 | $92.00 | $93.00 | $92.00 |
| 625E18510 BRACKET ARM, 30' | 1 EACH | $2,540 | $2,000 | $2,576 | $2,540 | $2,600 | $2,540 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 180 FT | $1.70 | $2.00 | $1.72 | $1.70 | $1.85 | $1.70 |
| 625E25500 CONDUIT, 3", 725.04 | 122 FT | $27.30 | $44.00 | $27.68 | $27.30 | $27.50 | $27.30 |
| 625E25600 CONDUIT, 4", 725.04 | 12 FT | $37.20 | $90.00 | $37.72 | $37.20 | $38.00 | $37.20 |
| 625E25906 CONDUIT, JACKED OR DRILLED, 725.051, 4 | 321 FT | $40.00 | $46.00 | $40.56 | $40.00 | $40.00 | $40.00 |
| 625E29000 TRENCH | 255 FT | $10.20 | $10.00 | $10.34 | $10.20 | $11.00 | $10.20 |
| 625E30700 PULL BOX, 725.08, 18" | 3 EACH | $795 | $1,250 | $806 | $795 | $800 | $795 |
| 625E30706 PULL BOX, 725.08, 24" | 1 EACH | $1,025 | $1,400 | $1,039 | $1,025 | $1,109 | $1,025 |
| 625E31510 PULL BOX REMOVED | 8 EACH | $150 | $350 | $152 | $150 | $155 | $150 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 255 FT | $0.40 | $1.00 | $0.41 | $0.40 | $0.50 | $0.40 |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 9 EACH | $995 | $785 | $1,009 | $995 | $1,000 | $995 |
| 632E05087 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 2 EACH | $1,510 | $1,375 | $1,531 | $1,510 | $1,600 | $1,510 |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 2 EACH | $540 | $750 | $548 | $540 | $550 | $540 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 11 EACH | $65.00 | $50.00 | $65.91 | $65.00 | $70.50 | $65.00 |
| 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD | 2 EACH | $65.00 | $42.00 | $65.92 | $65.00 | $70.50 | $65.00 |
| 632E26000 PEDESTRIAN PUSHBUTTON | 2 EACH | $225 | $325 | $228 | $225 | $244 | $225 |
| 632E30980 SIGNAL CABLE, 3 CONDUCTOR, NO. 10 AWG | 40 FT | $2.45 | $4.00 | $2.48 | $2.45 | $2.50 | $2.45 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 520 FT | $2.10 | $3.00 | $2.13 | $2.10 | $2.15 | $2.10 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 930 FT | $2.35 | $3.75 | $2.38 | $2.35 | $2.50 | $2.35 |
| 632E62820 INTERCONNECT, MISC.: LONG RANGE REPEATER, SOLAR PO | 1 EACH | $4,200 | $8,100 | $4,259 | $4,200 | $4,544 | $4,200 |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 2 EACH | $4,750 | $5,000 | $4,817 | $4,750 | $5,139 | $4,750 |
| 632E64011 SIGNAL SUPPORT FOUNDATION, AS PER PLAN | 2 EACH | $5,250 | $6,000 | $5,324 | $5,250 | $5,680 | $5,250 |
| 632E68200 POWER CABLE, 2 CONDUCTOR, NO. 6 AWG | 70 FT | $3.05 | $5.50 | $3.09 | $3.05 | $3.15 | $3.05 |
| 632E69700 SERVICE CABLE, 3 CONDUCTOR, NO. 8 AWG | 30 FT | $3.05 | $6.00 | $3.09 | $3.05 | $3.10 | $3.05 |
| 632E70000 POWER SERVICE | 1 EACH | $4,500 | $2,300 | $4,563 | $4,500 | $6,500 | $4,500 |
| 632E77233 SIGNAL SUPPORT, MECHANICAL DAMPER FOR TC-81.21 MAS | 1 EACH | $815 | $1,100 | $826 | $815 | $850 | $815 |
| 632E79151 COMBINATION SIGNAL SUPPORT, TYPE TC-81.22, DESIGN | 1 EACH | $17,275 | $17,800 | $17,518 | $17,275 | $17,300 | $17,275 |
| 632E90100 REMOVAL OF TRAFFIC SIGNAL INSTALLATION | 1 EACH | $4,250 | $13,000 | $4,310 | $4,250 | $6,500 | $4,250 |
| 632E90104 REUSE OF TRAFFIC CONTROL ITEM: PREEMPTION PHASE SE | 1 EACH | $850 | $500 | $862 | $850 | $900 | $850 |
| 632E90104 REUSE OF TRAFFIC CONTROL ITEM: PREEMPTION RECEIVIN | 3 EACH | $1,075 | $1,900 | $1,090 | $1,075 | $1,163 | $1,075 |
| 632E90104 REUSE OF TRAFFIC CONTROL ITEM: PREEMPTION, AS PER | 1 EACH | $1,270 | $1,900 | $1,288 | $1,270 | $1,374 | $1,270 |
| 632E90104 REUSE OF TRAFFIC CONTROL ITEM: PTZ CAMERA, AS PER | 1 EACH | $2,725 | $2,000 | $2,763 | $2,725 | $2,948 | $2,725 |
| 632E90104 REUSE OF TRAFFIC CONTROL ITEM: STOP-LINE RADAR DET | 4 EACH | $1,500 | $3,300 | $1,521 | $1,500 | $1,623 | $1,500 |
| 632E90104 REUSE OF TRAFFIC CONTROL ITEM: UNINTERRUPTIBLE POW | 1 EACH | $2,500 | $3,650 | $2,535 | $2,500 | $2,705 | $2,500 |
| 632E90206 REUSE OF SIGNAL SUPPORT | 1 EACH | $2,560 | $5,900 | $2,596 | $2,560 | $2,770 | $2,560 |
| 632E90213 REUSE OF CONTROLLER, AS PER PLAN | 1 EACH | $4,300 | $6,550 | $4,360 | $4,300 | $4,652 | $4,300 |
| 632E90400 SIGNALIZATION, MISC.: 2" WEATHERHEAD, AS PER PLAN | 2 EACH | $750 | $400 | $761 | $750 | $812 | $750 |
| 633E67101 CABINET FOUNDATION, AS PER PLAN | 1 EACH | $1,265 | $3,850 | $1,283 | $1,265 | $1,369 | $1,265 |
| 633E67200 CONTROLLER WORK PAD | 1 EACH | $895 | $900 | $908 | $895 | $968 | $895 |
| 633E72001 TRAINING, AS PER PLAN | 1 LS | $1,500 | $1,800 | $1,521 | $1,500 | $1,623 | $1,500 |
| 633E99000 CONTROLLER ITEM, MISC.: TWO-WAY RADIO, AS PER PLAN | 1 EACH | $2,260 | $3,100 | $2,292 | $2,260 | $2,445 | $2,260 |
| 809E65990 ITS DEVICE, MISC.: PREEMPTION PHASE SELECTOR, AS P | 1 EACH | $4,430 | $3,750 | $4,492 | $4,430 | $4,500 | $4,430 |
| 809E65990 ITS DEVICE, MISC.: PREEMPTION RECEIVING UNIT, AS P | 2 EACH | $2,550 | $2,000 | $2,586 | $2,550 | $2,700 | $2,550 |
| 809E65990 ITS DEVICE, MISC.: PREEMPTION, AS PER PLAN | 1 EACH | $2,665 | $1,600 | $2,702 | $2,665 | $2,700 | $2,665 |
| 809E65990 ITS DEVICE, MISC.: PREEMPTION, AS PER PLAN (QUEUE) | 1 EACH | $12,050 | $16,300 | $12,219 | $12,050 | $12,100 | $12,050 |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 2 EACH | $7,960 | $7,400 | $8,072 | $7,960 | $9,000 | $7,960 |
| 809E69210 PREEMPT RECEIVING UNIT | 1 EACH | $1,725 | $6,100 | $1,749 | $1,725 | $1,866 | $1,725 |
| 809E69220 PREEMPT DETECTOR CABLE | 710 FT | $1.70 | $2.75 | $1.72 | $1.70 | $1.72 | $1.70 |
| 809E69240 PREEMPT CONFIRMATION LIGHT, LED | 1 EACH | $600 | $2,500 | $608 | $600 | $649 | $600 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 150 CY | $47.00 | $70.00 | $52.73 | $80.00 | $52.00 | $111 |
| 410E13000 TRAFFIC COMPACTED SURFACE, TYPE C | 150 CY | $57.75 | $70.00 | $58.58 | $80.00 | $51.50 | $105 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 120 HOUR | $75.00 | $90.00 | $68.65 | $70.00 | $70.50 | $98.54 |
| 614E18002 MAINTAINING TRAFFIC, MISC.:PORTABLE TRAFFIC SIGNAL | 1 LS | $19,500 | $25,000 | $11,200 | $32,000 | $16,500 | $11,200 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 0.57 MILE | $7,500 | $3,005 | $3,005 | $995 | $3,251 | $3,005 |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I | 0.14 MILE | $18,764 | $18,000 | $2,500 | $8,179 | $2,705 | $2,500 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 1.17 MILE | $3,750 | $2,670 | $2,670 | $680 | $2,889 | $2,670 |
| 614E22200 WORK ZONE EDGE LINE, CLASS I, 4", 740.06, TYPE I | 0.13 MILE | $9,830 | $9,000 | $1.00 | $8,400 | $1.00 | $1.00 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 1,815 FT | $1.05 | $0.75 | $0.75 | $0.90 | $0.80 | $0.75 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 144 FT | $5.00 | $3.50 | $3.50 | $4.00 | $4.00 | $3.50 |
| 614E30000 WORK ZONE ARROW, CLASS I | 30 EACH | $35.00 | $70.00 | $70.00 | $75.00 | $75.50 | $70.00 |
| 614E30400 WORK ZONE ARROW, CLASS I, 740.06, TYPE I | 1 EACH | $80.00 | $80.00 | $2.00 | $550 | $2.00 | $2.00 |
| 614E32700 WORK ZONE ISLAND MARKING, CLASS I | 960 SF | $0.50 | $2.50 | $2.50 | $2.50 | $2.50 | $2.50 |
| 616E10000 WATER | 24 MGAL | $1.00 | $60.00 | $13.46 | $1.00 | $29.00 | $5.46 |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 LS | $13,125 | $30,000 | $12,273 | $12,500 | $16,500 | $26,644 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $20,000 | $35,000 | $4,242 | $19,000 | $13,500 | $7,122 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 2,802 LB | $4.25 | $4.65 | $2.36 | $4.00 | $5.00 | $2.49 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 24 EACH | $33.50 | $19.00 | $76.45 | $32.00 | $31.50 | $16.25 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 54 SY | $44.00 | $48.00 | $35.20 | $42.00 | $25.50 | $48.00 |
| 512E33000 TYPE 2 WATERPROOFING | 242 SY | $23.00 | $23.50 | $22.93 | $22.00 | $22.00 | $23.50 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 22 CY | $131 | $85.00 | $102 | $125 | $60.00 | $128 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 34 CY | $115 | $86.00 | $179 | $110 | $123 | $163 |
| 108E10000 CPM PROGRESS SCHEDULE | 1 LS | $7,500 | $4,000 | $4,144 | $6,000 | $9,500 | $6,586 |
| 619E16000 FIELD OFFICE, TYPE A | 7 MNTH | $2,000 | $1,600 | $1,035 | $1,500 | $900 | $1,395 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $25,000 | $35,600 | $13,915 | $20,000 | $58,000 | $20,167 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E71000 CONDUIT, TYPE A, PRECAST REINFORCED CONCRETE ARCH | 42 FT | $4,305 | $181k | 9% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 474 CY | $210 | $100k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $83,500 | $84k | 4% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 316 CY | $208 | $66k | 3% |
| 452E12011 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P, | 385 SY | $139 | $54k | 3% |
| 204E30020 GRANULAR MATERIAL, TYPE C, 12" | 1,113 CY | $40.5 | $45k | 2% |
| 452E10011 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P, | 422 SY | $100 | $42k | 2% |
| 202E23000 PAVEMENT REMOVED | 2,897 SY | $14 | $41k | 2% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $40,000 | $40k | 2% |