GAL-US 35-12.73/13.40
GAL County · est $2.1M
Bid dateThursday, January 13—
GAL County · est $2.1M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 9.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 42 more items below.
| Item | Quantity | R1Complete General Construction Company | R2Shelly & Sands INC | R3Catts Construction INC | % of bid |
|---|---|---|---|---|---|
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 2,927 SY | $76.00 | $61.00 | $69.00 | 15% |
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 2,927 SY | $72.00 | $69.33 | $83.00 | 14% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 1,751 SY | $76.00 | $67.00 | $67.00 | 9% |
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 1,751 SY | $72.00 | $80.00 | $77.00 | 9% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 1,278 SY | $76.00 |
| Item | Quantity | R1Complete General Construction Company | R2Shelly & Sands INC | R3Catts Construction INC |
|---|---|---|---|---|
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1" DEPTH) | 2,203 SY | $8.25 | $9.00 | $4.50 |
| 407E20000 NON-TRACKING TACK COAT | 199 GAL | $3.05 | $3.00 | $3.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 43 EACH | $25.00 | $12.00 | $35.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 5.08 MILE | $1,250 | $1,325 | $2,167 |
| 642E00204 LANE LINE, 6", TYPE 1 | 2.59 MILE | $750 | $800 | $541 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $65.00 |
| $69.00 |
| 7% |
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 1,278 SY | $74.00 | $88.00 | $69.00 | 6% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 1,158 SY | $76.00 | $70.00 | $69.00 | 6% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 5,770 FT | $15.00 | $18.00 | $24.50 | 6% |
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 1,158 SY | $74.00 | $93.00 | $74.00 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40,000 | $125,400 | 3% |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 92 CY | $410 | $435 | $500 | 3% |
| 848E30100 LATEX MODIFIED CONCRETE OVERLAY (VARIABLE THICKNES | 86 CY | $425 | $745 | $670 | 3% |
| 516E11800 VERTICAL EXTENSION OF STRUCTURAL EXPANSION JOINT | 172 FT | $185 | $238 | $251 | 2% |
| 516E11800 VERTICAL EXTENSION OF STRUCTURAL EXPANSION JOINT | 147 FT | $190 | $242 | $251 | 2% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 447 SY | $59.00 | $78.00 | $92.00 | 2% |
| 516E11800 VERTICAL EXTENSION OF STRUCTURAL EXPANSION JOINT | 132 FT | $190 | $265 | $255 | 2% |
| 848E50200 FULL-DEPTH REPAIR | 35 CY | $700 | $750 | $500 | 2% |
| 516E11800 VERTICAL EXTENSION OF STRUCTURAL EXPANSION JOINT | 123 FT | $190 | $250 | $255 | 2% |
| 848E30100 LATEX MODIFIED CONCRETE OVERLAY (VARIABLE THICKNES | 52 CY | $425 | $745 | $670 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $21,810 | $91,000 | $104,100 | 1% |
| — |
| $2,300 |
| $2,400 |
| $2,000 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (1WAY) | 279 EACH | $16.00 | $7.00 | $30.00 |
| 614E13312 BARRIER REFLECTOR, TYPE 2 (1WAY) | 50 EACH | $32.00 | $7.00 | $30.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 329 EACH | $24.00 | $12.00 | $41.00 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 6.83 MILE | $1,125 | $1,200 | $1,113 |
| 614E24000 WORK ZONE DOTTED LINE, CLASS I | 4,480 FT | $0.52 | $0.55 | $1.00 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $13,000 | $7,500 | $2,381 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $10,000 | $18,000 | $3,818 |
| 202E23500 WEARING COURSE REMOVED | 307 SY | $6.00 | $22.00 | $7.00 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 100 LB | $4.50 | $3.00 | $3.75 |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 3 CY | $1,400 | $1,200 | $1,189 |
| 848E50000 HAND CHIPPING | 440 SY | $35.00 | $40.00 | $79.00 |
| 848E50100 TEST SLAB | 1 LS | $1,000 | $2,500 | $500 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $10,000 | $18,000 | $3,818 |
| 202E23500 WEARING COURSE REMOVED | 214 SY | $6.00 | $30.00 | $7.00 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 100 LB | $4.50 | $2.40 | $4.00 |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 2 CY | $1,900 | $1,800 | $1,180 |
| 848E50000 HAND CHIPPING | 263 SY | $35.00 | $40.00 | $79.00 |
| 848E50100 TEST SLAB | 1 LS | $1,000 | $2,500 | $500 |
| 848E50200 FULL-DEPTH REPAIR | 21 CY | $700 | $750 | $500 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $10,000 | $14,000 | $3,818 |
| 202E23500 WEARING COURSE REMOVED | 214 SY | $6.00 | $30.00 | $7.00 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 100 LB | $4.50 | $2.50 | $3.75 |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 2 CY | $1,900 | $1,800 | $1,189 |
| 848E30100 LATEX MODIFIED CONCRETE OVERLAY (VARIABLE THICKNES | 38 CY | $425 | $750 | $670 |
| 848E50000 HAND CHIPPING | 192 SY | $35.00 | $50.00 | $79.00 |
| 848E50100 TEST SLAB | 1 LS | $1,000 | $2,500 | $500 |
| 848E50200 FULL-DEPTH REPAIR | 14 CY | $700 | $750 | $500 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $10,000 | $15,000 | $3,818 |
| 202E23500 WEARING COURSE REMOVED | 214 SY | $6.00 | $30.00 | $7.00 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 100 LB | $4.50 | $2.50 | $4.00 |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 2 CY | $1,900 | $1,800 | $1,190 |
| 848E30100 LATEX MODIFIED CONCRETE OVERLAY (VARIABLE THICKNES | 34 CY | $425 | $750 | $670 |
| 848E50000 HAND CHIPPING | 174 SY | $35.00 | $50.00 | $79.00 |
| 848E50100 TEST SLAB | 1 LS | $1,000 | $2,500 | $500 |
| 848E50200 FULL-DEPTH REPAIR | 13 CY | $700 | $750 | $500 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,000 | $11,500 | $21,048 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 2,927 SY | $76 | $222k | 13% |
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 2,927 SY | $72 | $211k | 12% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 1,751 SY | $76 | $133k | 8% |
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 1,751 SY | $72 | $126k | 7% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 1,278 SY | $76 | $97k | 6% |
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 1,278 SY | $74 | $95k | 5% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 1,158 SY | $76 | $88k | 5% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 5,770 FT | $15 | $87k | 5% |
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 1,158 SY | $74 | $86k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 2% |