| Item | Quantity | R1Double Jay Construction INC | R2Belgray, INC | R3Brumbaugh Construction INC | R4Associated Excavating INC | R5L J Deweese CO INC | R6Outdoor Enterprise LLC | R7Barrett Paving Materials INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 56 CY | $583 | $530 | $565 | $726 | $550 | $590 | $500 | 14% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 51 CY | $605 | $590 | $585 | $587 | $550 | $610 | $600 | 13% |
| 609E98000 |
| Item | Quantity | R1Double Jay Construction INC | R2Belgray, INC | R3Brumbaugh Construction INC | R4Associated Excavating INC | R5L J Deweese CO INC | R6Outdoor Enterprise LLC | R7Barrett Paving Materials INC |
|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,102 | $2,000 | $1,771 | $750 | $12,500 | $7,000 | $10,000 |
| 202E23000 PAVEMENT REMOVED | 20 SY | $31.80 | $28.00 | $34.00 | $45.00 | $55.00 | $45.00 | $35.00 |
| 202E30000 WALK REMOVED | 1,564 SF |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 775 FT |
| $31.35 |
| $35.00 |
| $43.00 |
| $37.50 |
| $35.00 |
| $32.00 |
| $28.00 |
| 10% |
| 608E52000 CURB RAMP | 1,559 SF | $12.50 | $16.25 | $22.00 | $18.45 | $21.00 | $23.00 | $10.00 | 8% |
| 630E97700 SIGNING, MISC.: SOLAR POWERED RECTANGULAR RAPID FL | 2 EACH | $6,738 | $6,125 | $6,500 | $12,631 | $8,000 | $9,000 | $7,550 | 6% |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 162 SY | $75.55 | $75.00 | $110 | $82.75 | $99.00 | $86.00 | $75.00 | 5% |
| 608E10000 4" CONCRETE WALK | 1,683 SF | $7.20 | $7.75 | $9.50 | $9.10 | $9.00 | $8.00 | $7.00 | 5% |
| 611E04400 12" CONDUIT, TYPE B | 196 FT | $59.80 | $90.00 | $75.00 | $83.50 | $95.00 | $90.00 | $90.00 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $11,660 | $4,554 | $5,300 | $7,875 | $21,000 | $10,000 | $39,650 | 5% |
| 659E00300 TOPSOIL | 167 CY | $50.25 | $58.00 | $40.00 | $55.00 | $35.00 | $70.00 | $75.00 | 4% |
| 611E99574 MANHOLE, NO. 3 | 2 EACH | $3,938 | $2,900 | $2,750 | $3,535 | $3,250 | $4,000 | $4,500 | 3% |
| 611E98180 CATCH BASIN, NO. 3A | 3 EACH | $2,544 | $2,500 | $2,000 | $2,755 | $3,200 | $4,600 | $4,200 | 3% |
| 644E00630 CROSSWALK LINE, 24" | 878 FT | $8.25 | $7.50 | $8.00 | $6.30 | $7.75 | $8.25 | $6.00 | 3% |
| 638E10300 FIRE HYDRANT EXTENDED AND ADJUSTED TO GRADE | 2 EACH | $3,474 | $1,400 | $850 | $885 | $2,500 | $2,500 | $5,500 | 3% |
| 203E10000 EXCAVATION | 240 CY | $28.00 | $37.00 | $19.00 | $7.00 | $28.00 | $36.00 | $62.00 | 3% |
| 304E20000 AGGREGATE BASE | 106 CY | $55.20 | $90.00 | $54.00 | $46.00 | $80.00 | $90.00 | $135 | 2% |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 1,397 FT | $3.75 | $3.50 | $3.50 | $3.68 | $3.50 | $3.75 | $3.50 | 2% |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 614E12420 DETOUR SIGNING | 1 LS | $4,917 | $5,850 | $4,750 | $5,250 | $4,500 | $5,000 | $5,000 | 2% |
| 202E32500 CURB AND GUTTER REMOVED | 454 FT | $10.75 | $20.00 | $8.00 | $6.90 | $6.00 | $6.00 | $13.00 | 2% |
| $1.50 |
| $3.50 |
| $4.00 |
| $1.75 |
| $1.40 |
| $3.50 |
| $4.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 235 FT | $14.50 | $15.00 | $18.00 | $10.00 | $12.00 | $20.00 | $30.00 |
| 202E58100 CATCH BASIN REMOVED | 4 EACH | $370 | $400 | $360 | $650 | $450 | $700 | $650 |
| 203E20000 EMBANKMENT | 35 CY | $29.50 | $42.00 | $21.00 | $15.00 | $80.00 | $30.00 | $62.00 |
| 204E10000 SUBGRADE COMPACTION | 613 SY | $1.75 | $3.50 | $1.00 | $2.00 | $2.00 | $2.00 | $3.00 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 4 EACH | $204 | $200 | $215 | $50.00 | $225 | $320 | $350 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 750 SY | $6.25 | $5.00 | $1.50 | $5.50 | $2.00 | $3.00 | $3.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.21 TON | $1,485 | $750 | $600 | $550 | $1,000 | $800 | $1,350 |
| 659E31000 LIME | 0.31 ACRE | $200 | $1,000 | $100 | $165 | $100 | $800 | $150 |
| 659E35000 WATER | 9 MGAL | $11.00 | $80.00 | $5.00 | $40.00 | $10.00 | $50.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 0.15 CY | $2,720 | $3,400 | $900 | $3,000 | $2,000 | $4,000 | $2,400 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 100 FT | $12.40 | $15.00 | $14.00 | $30.75 | $12.00 | $14.00 | $20.00 |
| 611E01500 6" CONDUIT, TYPE F | 100 FT | $22.60 | $16.00 | $16.50 | $32.75 | $12.00 | $40.00 | $20.00 |
| 611E98150 CATCH BASIN, NO. 3 | 1 EACH | $3,595 | $3,500 | $2,800 | $3,375 | $4,000 | $3,800 | $5,000 |
| 611E98470 CATCH BASIN, NO. 2-2B | 1 EACH | $1,552 | $1,500 | $1,300 | $1,660 | $2,100 | $2,400 | $2,500 |
| 407E20000 NON-TRACKING TACK COAT | 40 GAL | $22.00 | $10.00 | $20.00 | $5.50 | $20.00 | $22.00 | $3.00 |
| 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $695 | $700 | $585 | $1,365 | $600 | $610 | $600 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 120 FT | $16.50 | $15.00 | $16.00 | $15.75 | $12.00 | $15.00 | $11.25 |
| 630E80100 SIGN, FLAT SHEET | 26 SF | $35.00 | $32.00 | $34.00 | $31.50 | $25.00 | $25.00 | $23.50 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 11 EACH | $81.50 | $75.00 | $80.00 | $75.00 | $75.00 | $85.00 | $75.00 |
| 644E00100 EDGE LINE, 4" | 0.11 MILE | $16,500 | $15,000 | $16,000 | $10,500 | $15,500 | $16,500 | $10,000 |
| 644E00300 CENTER LINE | 0.01 MILE | $59,950 | $54,500 | $58,000 | $52,500 | $55,000 | $60,000 | $50,000 |
| 644E00500 STOP LINE | 97 FT | $8.25 | $7.50 | $8.00 | $6.30 | $8.00 | $8.25 | $6.00 |
| 644E00620 CROSSWALK LINE, 12" | 1,158 FT | $4.15 | $3.75 | $4.00 | $3.15 | $4.00 | $4.10 | $3.00 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 35 CY | $62.80 | $80.00 | $74.00 | $46.00 | $30.00 | $40.00 | $110 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,928 | $3,000 | $2,500 | $4,415 | $5,500 | $3,000 | $2,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,740 | $4,000 | $7,000 | $3,740 | $4,500 | $4,000 | $10,000 |
| 624E10000 MOBILIZATION | 1 LS | $4,160 | $10,000 | $20,000 | $9,305 | $15,500 | $19,000 | $20,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 56 CY | $583 | $33k | 11% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 51 CY | $605 | $31k | 10% |
| 609E98000 CURB, MISC.: COMBINATION CURB AND GUTTER, MCE TYPE | 775 FT | $31.35 | $24k | 8% |
| 608E52000 CURB RAMP | 1,559 SF | $12.5 | $19k | 7% |
| 630E97700 SIGNING, MISC.: SOLAR POWERED RECTANGULAR RAPID FL | 2 EACH | $6,738 | $13k | 5% |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 162 SY | $75.55 | $12k | 4% |
| 608E10000 4" CONCRETE WALK | 1,683 SF | $7.2 | $12k | 4% |
| 611E04400 12" CONDUIT, TYPE B | 196 FT | $59.8 | $12k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $11,660 | $12k | 4% |
| 659E00300 TOPSOIL | 167 CY | $50.25 | $8k | 3% |