STA-SR 43-09.08 Drainage
STA County · est $0.4M
Bid dateThursday, January 27—
STA County · est $0.4M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 61 more items below.
| Item | Quantity | R1Tucson INC | R2Stanley Miller Construction Company | R3S E T INC | R4Digioia-suburban Excavating LLC | R5Lockhart Concrete CO | R6Eclipse CO LLC | R7Wenger Excavating INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 100 CY | $303 | $435 | $431 | $260 | $280 | $308 | $280 | 13% |
| 624E10000 MOBILIZATION | 1 LS | $18,732 | $20,500 | $64,479 | $20,000 | $15,000 | $29,982 | $37,773 | 8% |
| 614E11000 MAINTAINING TRAFFIC |
| Item | Quantity | R1Tucson INC | R2Stanley Miller Construction Company | R3S E T INC | R4Digioia-suburban Excavating LLC | R5Lockhart Concrete CO | R6Eclipse CO LLC | R7Wenger Excavating INC |
|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,825 | $2,167 | $5,000 | $2,000 | $28,000 | $8,000 | $23,773 |
| 202E23000 PAVEMENT REMOVED | 593 SY | $10.00 | $13.00 | $17.84 | $26.00 | $30.00 | $13.00 | $14.60 |
| 202E53100 MAILBOX REMOVED | 10 EACH |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $15,000 |
| $27,800 |
| $26,312 |
| $14,395 |
| $15,000 |
| $24,000 |
| $53,733 |
| 7% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 66 CY | $225 | $163 | $162 | $315 | $185 | $371 | $296 | 6% |
| 611E16600 36" CONDUIT, TYPE C, 706.01 OR 707.13 14 GAUGE MIN | 148 FT | $99.25 | $142 | $125 | $160 | $155 | $132 | $181 | 6% |
| 611E04600 12" CONDUIT, TYPE C, 706.01 OR 707.13 14 GAUGE MIN | 319 FT | $43.00 | $38.00 | $51.05 | $62.50 | $60.50 | $72.00 | $80.40 | 6% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=3") | 1,197 SY | $11.00 | $6.20 | $6.16 | $10.00 | $2.50 | $13.00 | $10.00 | 6% |
| 659E00300 TOPSOIL | 303 CY | $40.00 | $28.00 | $67.25 | $70.00 | $85.00 | $34.00 | $12.00 | 5% |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 589 FT | $18.00 | $12.50 | $5.00 | $9.00 | $5.00 | $18.00 | $19.70 | 5% |
| 611E07600 18" CONDUIT, TYPE C, 706.01 OR 707.13 14 GAUGE MIN | 189 FT | $53.50 | $46.00 | $66.05 | $83.00 | $76.00 | $82.00 | $97.80 | 4% |
| 659E10000 SEEDING AND MULCHING | 2,750 SY | $3.60 | $3.00 | $2.70 | $2.75 | $4.25 | $2.00 | $5.00 | 4% |
| 611E98470 CATCH BASIN, NO. 2-2B | 7 EACH | $1,240 | $2,346 | $1,360 | $2,300 | $1,057 | $2,698 | $2,879 | 4% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $8,423 | $12,345 | $7,821 | $9,000 | $10,000 | $11,000 | $8,448 | 4% |
| 611E16400 36" CONDUIT, TYPE B, 706.01 OR 707.13 14 GAUGE MIN | 50 FT | $164 | $153 | $158 | $310 | $230 | $155 | $183 | 4% |
| 611E13400 30" CONDUIT, TYPE B, 706.01 OR 707.13 14 GAUGE MIN | 60 FT | $128 | $106 | $147 | $300 | $200 | $129 | $150 | 3% |
| 203E10000 EXCAVATION | 228 CY | $33.50 | $27.00 | $26.00 | $28.00 | $40.00 | $30.00 | $32.80 | 3% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $72.00 | $90.00 | $65.00 | $90.00 | $55.00 | $79.00 | $89.00 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,500 | $4,726 | $7,000 | $3,851 | $12,000 | $10,500 | $15,004 | 3% |
| 441E50401 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $627 | $435 | $431 | $330 | $350 | $390 | $580 | 3% |
| 611E98540 CATCH BASIN, NO. 2-4 | 3 EACH | $2,075 | $3,667 | $2,128 | $3,600 | $2,400 | $3,458 | $4,208 | 3% |
| $56.00 |
| $50.00 |
| $50.00 |
| $100 |
| $100 |
| $54.00 |
| $152 |
| 202E58100 CATCH BASIN REMOVED | 4 EACH | $385 | $450 | $300 | $360 | $200 | $434 | $627 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, 12" | 90 FT | $29.50 | $39.00 | $9.66 | $15.00 | $20.00 | $56.00 | $19.80 |
| 202E75000 FENCE REMOVED | 70 FT | $4.50 | $3.00 | $5.00 | $4.50 | $5.00 | $4.00 | $5.50 |
| 202E98100 REMOVAL MISC.: INSPECTION WELL | 5 EACH | $340 | $50.00 | $150 | $190 | $100 | $236 | $437 |
| 202E98200 REMOVAL MISC.: CONDUIT | 20 FT | $27.00 | $15.00 | $5.00 | $10.50 | $5.00 | $26.00 | $25.00 |
| 203E20000 EMBANKMENT | 56 CY | $22.00 | $40.00 | $20.00 | $58.00 | $60.00 | $35.00 | $30.40 |
| 203E20001 EMBANKMENT, AS PER PLAN | 5 CY | $134 | $60.00 | $25.00 | $17.00 | $70.00 | $53.00 | $30.40 |
| 203E35120 GRANULAR MATERIAL, TYPE C, (703.16) | 40 CY | $60.00 | $68.00 | $57.00 | $62.00 | $100 | $83.00 | $84.60 |
| 203E40000 BORROW | 20 CY | $96.50 | $12.50 | $30.00 | $30.00 | $35.00 | $47.00 | $42.00 |
| 204E10000 SUBGRADE COMPACTION | 372 SY | $3.00 | $1.00 | $2.00 | $2.00 | $4.00 | $1.00 | $6.80 |
| 204E50000 GEOTEXTILE FABRIC, TYPE D | 200 SY | $3.00 | $3.10 | $2.55 | $2.00 | $3.00 | $1.00 | $3.60 |
| 607E15100 FENCE, TYPE 47RA | 70 FT | $54.00 | $83.00 | $55.00 | $53.00 | $50.00 | $80.00 | $72.60 |
| 690E50000 SPECIAL - MAILBOX SUPPORT | 10 EACH | $243 | $200 | $347 | $205 | $200 | $181 | $312 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 3 CY | $240 | $204 | $87.75 | $180 | $135 | $355 | $145 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 9 CY | $206 | $192 | $87.91 | $155 | $145 | $167 | $147 |
| 616E10000 WATER | 1 MGAL | $1.00 | $1.00 | $51.25 | $405 | $150 | $147 | $24.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 138 SY | $0.50 | $1.50 | $1.03 | $1.00 | $4.25 | $2.00 | $0.80 |
| 659E20000 COMMERCIAL FERTILIZER | 0.38 TON | $2,150 | $800 | $688 | $1,350 | $1,250 | $840 | $1,258 |
| 659E31000 LIME | 0.57 ACRE | $56.51 | $150 | $55.00 | $400 | $397 | $84.00 | $442 |
| 659E35000 WATER | 14.9 MGAL | $1.00 | $1.00 | $2.01 | $37.00 | $35.00 | $1.00 | $36.00 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $1,900 | $7,000 | $4,575 | $1,800 | $4,000 | $18,000 | $4,447 |
| 602E20000 CONCRETE MASONRY | 1.4 CY | $2,000 | $1,944 | $2,673 | $2,200 | $2,300 | $1,154 | $1,897 |
| 611E00200 4" CONDUIT, TYPE C | 15 FT | $13.00 | $40.00 | $15.14 | $17.50 | $32.54 | $27.00 | $20.20 |
| 611E00900 6" CONDUIT, TYPE B | 30 FT | $16.00 | $10.00 | $27.31 | $39.00 | $29.00 | $34.00 | $21.00 |
| 611E01400 6" CONDUIT, TYPE E | 30 FT | $31.50 | $10.00 | $27.31 | $22.00 | $29.00 | $15.00 | $21.00 |
| 611E01500 6" CONDUIT, TYPE F | 30 FT | $29.00 | $10.00 | $27.31 | $34.00 | $29.00 | $15.00 | $21.00 |
| 611E04900 12" CONDUIT, TYPE D | 20 FT | $47.00 | $38.00 | $55.10 | $57.00 | $60.50 | $72.00 | $78.80 |
| 611E06100 15" CONDUIT, TYPE C, 706.01 OR 707.13 14 GAUGE MIN | 62 FT | $50.00 | $56.00 | $49.96 | $65.00 | $65.50 | $78.00 | $84.50 |
| 611E08900 21" CONDUIT, TYPE B, 706.01 OR 707.13 14 GAUGE MIN | 39 FT | $99.50 | $64.00 | $91.99 | $290 | $170 | $107 | $122 |
| 611E13600 30" CONDUIT, TYPE C, 706.01 OR 707.13 14 GAUGE MIN | 10 FT | $162 | $160 | $111 | $275 | $138 | $138 | $148 |
| 611E97400 CONDUIT, MISC.: TYPE C FOR DRAINAGE DISCHARGE CONT | 20 FT | $24.00 | $15.00 | $36.09 | $27.00 | $130 | $35.00 | $32.00 |
| 611E97400 CONDUIT, MISC.: TYPE E FOR DRAINAGE DISCHARGE CONT | 20 FT | $14.00 | $15.00 | $36.09 | $27.00 | $210 | $25.00 | $32.00 |
| 611E97400 CONDUIT, MISC.: TYPE F FOR DRAINAGE DISCHARGE CONT | 20 FT | $14.00 | $15.00 | $36.09 | $27.00 | $130 | $27.00 | $32.00 |
| 611E98510 CATCH BASIN, NO. 2-3 | 1 EACH | $2,162 | $3,667 | $2,128 | $3,200 | $1,600 | $3,465 | $3,767 |
| 611E99574 MANHOLE, NO. 3, 48" DIAMETER | 1 EACH | $3,572 | $3,889 | $1,952 | $3,000 | $3,857 | $4,670 | $6,549 |
| 611E99720 INSPECTION WELL | 5 EACH | $465 | $550 | $508 | $800 | $1,300 | $530 | $1,077 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 625 FT | $2.25 | $7.00 | $3.84 | $3.00 | $2.50 | $4.02 | $3.35 |
| 304E20000 AGGREGATE BASE | 62 CY | $86.00 | $117 | $57.00 | $90.00 | $65.00 | $70.00 | $82.60 |
| 407E20000 NON-TRACKING TACK COAT | 126 GAL | $4.35 | $2.50 | $2.48 | $5.50 | $7.00 | $6.00 | $4.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 203 GAL | $6.50 | $4.00 | $3.85 | $5.50 | $5.00 | $6.00 | $6.00 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 23 CY | $205 | $83.30 | $82.50 | $160 | $65.00 | $159 | $190 |
| 621E00100 RPM | 5 EACH | $783 | $250 | $468 | $750 | $200 | $588 | $524 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 30 FT | $15.35 | $15.78 | $15.62 | $15.00 | $25.00 | $26.00 | $19.80 |
| 630E80100 SIGN, FLAT SHEET, 730.20 | 4 SF | $106 | $109 | $108 | $100 | $50.00 | $98.00 | $100 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 2 EACH | $93.70 | $96.50 | $95.43 | $92.00 | $85.00 | $98.00 | $90.00 |
| 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 1 EACH | $188 | $193 | $191 | $183 | $150 | $125 | $175 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.16 MILE | $5,346 | $5,450 | $5,396 | $5,200 | $7,500 | $7,320 | $5,000 |
| 642E00300 CENTER LINE, TYPE 1 | 0.08 MILE | $7,063 | $7,267 | $14,388 | $6,900 | $25,000 | $10,022 | $6,767 |
| 642E00500 STOP LINE, TYPE 1 | 15 FT | $3.00 | $3.10 | $3.08 | $3.00 | $5.00 | $14.00 | $4.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $4,930 | $5,072 | $5,022 | $4,800 | $15,675 | $17,000 | $10,796 |
| 614E12460 WORK ZONE MARKING SIGN | 20 EACH | $106 | $109 | $108 | $103 | $200 | $138 | $129 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $216 | $150 | $415 | $315 | $200 | $190 | $276 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 4 SNMT | $1,026 | $1,056 | $1,045 | $1,000 | $1,500 | $1,378 | $1,206 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 0.08 MILE | $15,876 | $16,334 | $16,170 | $15,500 | $14,000 | $30,183 | $15,000 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.08 MILE | $5,616 | $5,778 | $5,720 | $5,500 | $14,000 | $19,295 | $5,600 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.32 MILE | $4,212 | $4,333 | $4,290 | $4,115 | $7,500 | $5,654 | $4,900 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $630 | $500 | $1,525 | $2,000 | $1,500 | $683 | $1,412 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 100 CY | $303 | $30k | 9% |
| 624E10000 MOBILIZATION | 1 LS | $18,732 | $19k | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $15,000 | $15k | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 66 CY | $225 | $15k | 4% |
| 611E16600 36" CONDUIT, TYPE C, 706.01 OR 707.13 14 GAUGE MIN | 148 FT | $99.25 | $15k | 4% |
| 611E04600 12" CONDUIT, TYPE C, 706.01 OR 707.13 14 GAUGE MIN | 319 FT | $43 | $14k | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=3") | 1,197 SY | $11 | $13k | 4% |
| 659E00300 TOPSOIL | 303 CY | $40 | $12k | 4% |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 589 FT | $18 | $11k | 3% |
| 611E07600 18" CONDUIT, TYPE C, 706.01 OR 707.13 14 GAUGE MIN | 189 FT | $53.5 | $10k | 3% |