VAN-Rotary Soccer Park Trail
VAN County · est $0.6M
Bid dateThursday, January 27—
VAN County · est $0.6M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 6.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 25 more items below.
| Item | Quantity | R1Shelly Company | R2Ward Construction CO | R3Scioto Valley Paving LLC | % of bid |
|---|---|---|---|---|---|
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (389 CY | $230 | $255 | $190 | 20% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 251 CY | $270 | $270 | $200 | 15% |
| 608E10001 4" CONCRETE WALK, AS PER PLAN | 10,363 SF | $6.50 | $7.50 | $12.00 | 15% |
| 659E00300 TOPSOIL | 608 CY | $52.00 | $51.40 | $40.00 | 7% |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 316 CY | $72.00 | $97.00 | $44.00 |
| Item | Quantity | R1Shelly Company | R2Ward Construction CO | R3Scioto Valley Paving LLC |
|---|---|---|---|---|
| 202E98000 REMOVAL MISC.: REMOVED | 1 LS | $1,200 | $500 | $5,500 |
| 203E20000 EMBANKMENT | 106 CY | $22.00 | $27.60 | $45.00 |
| 204E45000 PROOF ROLLING | 3 HOUR | $80.00 | $200 | $150 |
| 204E50000 GEOTEXTILE FABRIC | 2,442 SY | $1.80 | $1.00 | $5.00 |
| 608E52001 CURB RAMP, AS PER PLAN | 472 SF | $11.25 | $12.90 | $25.00 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 1 EACH | $460 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 5% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 407 CY | $53.00 | $45.00 | $45.00 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $12,000 | $22,000 | 4% |
| 203E10000 EXCAVATION | 361 CY | $55.00 | $48.00 | $45.00 | 4% |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 235 CY | $72.00 | $61.00 | $65.00 | 4% |
| 832E30000 EROSION CONTROL | 14,000 EACH | $1.00 | $1.00 | $1.00 | 3% |
| 690E98700 SPECIAL - AGGREGATE BASE REMOVED | 291 CY | $36.00 | $25.50 | $60.00 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $10,000 | $8,900 | $5,000 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $10,000 | $3,300 | $3,500 | 2% |
| 204E13000 EXCAVATION OF SUBGRADE | 407 CY | $24.00 | $25.00 | $35.00 | 2% |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 5,466 SY | $1.55 | $1.10 | $3.00 | 2% |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $1,250 | $2,200 | $1,000 | 2% |
| 209E61000 SPECIAL - SHAPING | 3,451 SY | $2.10 | $2.25 | $12.00 | 2% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $6,960 | $7,000 | $4,500 | 2% |
| 204E10000 SUBGRADE COMPACTION | 4,388 SY | $1.50 | $0.75 | $2.00 | 1% |
| 202E30000 WALK REMOVED | 2,183 SF | $2.95 | $1.00 | $4.00 | 1% |
| $700 |
| $1,500 |
| 690E50560 SPECIAL - BICYCLE RACK | 1 EACH | $750 | $1,500 | $5,000 |
| 690E50600 SPECIAL - BOLLARD | 1 EACH | $1,500 | $2,500 | $2,000 |
| 659E14000 REPAIR SEEDING AND MULCHING | 275 SY | $3.00 | $1.10 | $3.50 |
| 659E15000 INTER-SEEDING | 275 SY | $3.00 | $0.60 | $2.25 |
| 659E20000 COMMERCIAL FERTILIZER | 0.5 TON | $1,500 | $650 | $800 |
| 659E31000 LIME | 1.13 ACRE | $500 | $35.00 | $800 |
| 659E35000 WATER | 0.03 MGAL | $150 | $1.00 | $1.00 |
| 670E00500 SLOPE EROSION PROTECTION | 1,079 SY | $1.45 | $1.90 | $3.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,275 | $1,275 | $2,500 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $4,200 | $5,000 | $10,000 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $5,500 | $8,112 | $10,000 |
| 407E20000 NON-TRACKING TACK COAT | 393 GAL | $2.50 | $2.50 | $10.00 |
| 452E10011 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P, | 64 SY | $54.00 | $97.85 | $150 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 196 FT | $11.00 | $11.75 | $16.00 |
| 630E80100 SIGN, FLAT SHEET | 62 SF | $22.00 | $35.50 | $20.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 5 EACH | $75.00 | $24.00 | $100 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $15.00 | $24.00 | $15.00 |
| 642E00620 CROSSWALK LINE, 12", TYPE 1 | 43 FT | $10.00 | $10.00 | $50.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,500 | $4,300 | $6,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (389 CY | $230 | $89k | 18% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 251 CY | $270 | $68k | 14% |
| 608E10001 4" CONCRETE WALK, AS PER PLAN | 10,363 SF | $6.5 | $67k | 14% |
| 659E00300 TOPSOIL | 608 CY | $52 | $32k | 6% |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 316 CY | $72 | $23k | 5% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 407 CY | $53 | $22k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 4% |
| 203E10000 EXCAVATION | 361 CY | $55 | $20k | 4% |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 235 CY | $72 | $17k | 3% |
| 832E30000 EROSION CONTROL | 14,000 EACH | $1 | $14k | 3% |