WOO-SR 25-00.75 Reconstruction
WOO County · est $24M
Bid dateThursday, January 27—
WOO County · est $24M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 153 more items below.
| Item | Quantity | R1Vernon Nagel INC | R2Helms And Sons Excavating | R3Miller Bros Const INC | R4Kokosing Construction Company INC | R5E S Wagner Company | R6Shelly Company | % of bid |
|---|---|---|---|---|---|---|---|---|
| 302E46001 ASPHALT CONCRETE BASE, AS PER PLAN, 5" | 32,069 CY | $126 | $126 | $126 | $126 | $126 | $126 | 23% |
| 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 11,732 CY | $145 | $145 | $145 | $145 | $145 | $145 | 10% |
| Item | Quantity | R1Vernon Nagel INC | R2Helms And Sons Excavating | R3Miller Bros Const INC | R4Kokosing Construction Company INC | R5E S Wagner Company | R6Shelly Company |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,000 | $180,000 | $300,001 | $90,000 | $114,493 | $325,000 |
| 202E23001 PAVEMENT REMOVED, AS PER PLAN | 57,105 SY | $3.00 | $7.72 | $2.25 | $1.72 | $1.72 | $1.15 |
| 202E30700 CONCRETE BARRIER REMOVED | 456 FT | $40.00 | $37.31 | $12.00 | $22.00 | $28.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 10,056 CY |
| $168 |
| $168 |
| $168 |
| $168 |
| $168 |
| $168 |
| 10% |
| 202E23000 PAVEMENT REMOVED | 209,675 SY | $7.65 | $7.84 | $9.20 | $8.00 | $10.34 | $15.00 | 9% |
| 304E20000 AGGREGATE BASE, 6" | 39,182 CY | $36.00 | $30.00 | $35.00 | $46.00 | $41.00 | $33.00 | 8% |
| 206E10500 CEMENT | 6,283 TON | $166 | $166 | $185 | $166 | $169 | $166 | 6% |
| 203E20000 EMBANKMENT | 130,267 CY | $8.00 | $8.10 | $13.00 | $12.00 | $13.00 | $15.60 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $800,000 | $385,000 | $800,000 | $800,000 | $800,000 | $800,000 | 5% |
| 611E21100 48" CONDUIT, TYPE C | 5,546 FT | $130 | $131 | $180 | $205 | $171 | $145 | 4% |
| 206E15020 CEMENT STABILIZED SUBGRADE, 14 INCHES DEEP | 242,820 SY | $2.66 | $2.05 | $2.40 | $2.70 | $2.93 | $2.35 | 4% |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC, 7 | 80,799 FT | $7.00 | $7.60 | $6.00 | $9.00 | $8.78 | $8.60 | 3% |
| 832E30000 EROSION CONTROL | 500,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 3% |
| 203E10000 EXCAVATION | 51,106 CY | $8.00 | $7.12 | $5.00 | $7.00 | $15.00 | $13.00 | 2% |
| 659E00300 TOPSOIL | 22,911 CY | $12.00 | $32.00 | $21.00 | $5.00 | $10.00 | $4.10 | 2% |
| 203E35120 GRANULAR MATERIAL, TYPE C | 12,141 CY | $22.00 | $32.02 | $20.00 | $37.00 | $15.50 | $34.00 | 2% |
| 206E11000 CURING COAT | 242,820 SY | $0.92 | $0.45 | $0.72 | $0.92 | $0.48 | $0.92 | 1% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 1,000 CY | $205 | $205 | $205 | $213 | $207 | $205 | 1% |
| 611E04400 12" CONDUIT, TYPE B | 4,587 FT | $40.00 | $49.00 | $60.00 | $71.00 | $79.54 | $65.00 | 1% |
| 202E35200 PIPE REMOVED, OVER 24" | 8,989 FT | $20.00 | $13.30 | $14.00 | $18.00 | $10.00 | $7.50 | 1% |
| 253E01001 PAVEMENT REPAIR, AS PER PLAN | 3,872 SY | $46.00 | $39.00 | $39.00 | $125 | $39.00 | $39.00 | 1% |
| $12.00 |
| 202E32000 CURB REMOVED | 10,271 FT | $3.00 | $7.60 | $1.00 | $1.00 | $2.50 | $1.25 |
| 202E32500 CURB AND GUTTER REMOVED | 64 FT | $6.00 | $12.73 | $2.50 | $6.50 | $9.00 | $4.25 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 17,096 FT | $10.00 | $9.25 | $22.00 | $12.00 | $10.00 | $14.00 |
| 202E38000 GUARDRAIL REMOVED | 2,087.65 FT | $1.50 | $2.01 | $1.50 | $1.50 | $2.00 | $2.00 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 2 EACH | $250 | $136 | $250 | $250 | $135 | $135 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 10 EACH | $250 | $95.50 | $250 | $250 | $95.00 | $95.00 |
| 202E42050 ANCHOR ASSEMBLY REMOVED, TYPE B | 4 EACH | $250 | $121 | $250 | $250 | $120 | $120 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 14 EACH | $250 | $55.29 | $250 | $250 | $55.00 | $55.00 |
| 202E47800 IMPACT ATTENUATOR REMOVED | 2 EACH | $1,000 | $261 | $1,000 | $1,000 | $260 | $260 |
| 202E53100 MAILBOX REMOVED | 30 EACH | $15.00 | $39.22 | $100 | $85.00 | $70.00 | $90.00 |
| 202E58000 MANHOLE REMOVED | 14 EACH | $300 | $394 | $230 | $525 | $250 | $475 |
| 202E58100 CATCH BASIN REMOVED | 122 EACH | $200 | $181 | $350 | $450 | $325 | $575 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT | 11,340 FT | $6.00 | $7.04 | $6.50 | $2.25 | $15.00 | $6.50 |
| 204E10000 SUBGRADE COMPACTION | 8,042 SY | $1.00 | $1.00 | $1.00 | $3.50 | $3.00 | $1.81 |
| 204E13000 EXCAVATION OF SUBGRADE | 12,141 CY | $6.00 | $12.04 | $10.00 | $15.00 | $10.00 | $16.75 |
| 204E45000 PROOF ROLLING | 121 HOUR | $100 | $96.64 | $50.00 | $215 | $150 | $225 |
| 204E50000 GEOTEXTILE FABRIC | 36,423 SY | $0.75 | $0.79 | $0.60 | $1.40 | $0.70 | $1.20 |
| 206E20000 TEST ROLLING | 30 HOUR | $125 | $96.64 | $50.00 | $215 | $150 | $225 |
| 206E30000 MIXTURE DESIGN FOR CHEMICALLY STABILIZED SOILS | 1 LS | $40,000 | $37,058 | $40,000 | $50,000 | $51,625 | $40,000 |
| 209E15000 RESHAPING UNDER GUARDRAIL | 26 STA | $60.00 | $40.21 | $250 | $100 | $40.00 | $40.00 |
| 209E60500 LINEAR GRADING | 14.4 MILE | $1,000 | $1,443 | $750 | $375 | $1,500 | $515 |
| 503E31100 ROCK EXCAVATION | 575 CY | $200 | $108 | $200 | $14.00 | $325 | $1,175 |
| 606E15050 GUARDRAIL, TYPE MGS | 1,400 FT | $21.00 | $21.91 | $21.00 | $21.00 | $21.80 | $21.80 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 62.5 FT | $27.50 | $23.32 | $27.50 | $27.50 | $23.20 | $23.20 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 8 EACH | $2,200 | $2,905 | $2,200 | $2,200 | $2,890 | $2,890 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 8 EACH | $1,750 | $1,387 | $1,750 | $1,750 | $1,380 | $1,380 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 11 EACH | $2,150 | $2,634 | $2,150 | $2,150 | $2,620 | $2,620 |
| 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4 | 4 EACH | $1,450 | $965 | $1,450 | $1,450 | $960 | $960 |
| 606E60028 IMPACT ATTENUATOR, TYPE 2 (BIDIRECTIONAL), 65 MPH, | 2 EACH | $34,000 | $32,890 | $34,000 | $34,000 | $32,720 | $32,720 |
| 622E10061 CONCRETE BARRIER, SINGLE SLOPE, TYPE B, AS PER PLA | 134 FT | $290 | $175 | $175 | $250 | $245 | $175 |
| 622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D | 240 FT | $175 | $100 | $100 | $130 | $125 | $100 |
| 622E24841 CONCRETE BARRIER END SECTION, TYPE B, AS PER PLAN | 2 EACH | $5,000 | $3,000 | $3,000 | $6,000 | $9,000 | $3,000 |
| 622E25000 CONCRETE BARRIER END SECTION, TYPE D | 2 EACH | $4,000 | $3,000 | $3,000 | $3,800 | $3,500 | $3,000 |
| 622E25050 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 2 EACH | $4,400 | $3,000 | $3,000 | $3,500 | $5,000 | $3,000 |
| 623E38500 MONUMENT ASSEMBLY | 25 EACH | $500 | $956 | $1,250 | $650 | $1,200 | $925 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 22 EACH | $145 | $131 | $185 | $250 | $200 | $450 |
| 690E50200 SPECIAL - MAILBOX SUPPORT SYSTEM, DOUBLE | 4 EACH | $215 | $208 | $235 | $350 | $240 | $550 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 160 SY | $73.01 | $101 | $140 | $115 | $150 | $200 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 190.2 CY | $92.12 | $99.29 | $125 | $120 | $128 | $105 |
| 616E10000 WATER | 5 MGAL | $10.00 | $1.00 | $200 | $75.00 | $70.00 | $48.00 |
| 659E10000 SEEDING AND MULCHING | 206,381 SY | $0.84 | $0.49 | $0.49 | $0.49 | $0.49 | $0.49 |
| 659E20000 COMMERCIAL FERTILIZER | 31 TON | $475 | $475 | $475 | $475 | $475 | $475 |
| 659E35000 WATER | 560 MGAL | $5.00 | $1.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $3,500 | $3,950 | $3,275 | $3,275 | $3,800 | $3,950 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $3,500 | $15,090 | $13,205 | $14,595 | $20,000 | $12,960 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $16,000 | $17,960 | $15,225 | $20,000 | $18,000 | $17,960 |
| 602E20000 CONCRETE MASONRY | 6.07 CY | $2,200 | $1,479 | $1,200 | $2,200 | $2,000 | $2,400 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 5,554 FT | $18.00 | $14.72 | $28.00 | $25.00 | $16.00 | $20.00 |
| 611E01500 6" CONDUIT, TYPE F | 100 FT | $10.00 | $11.53 | $25.00 | $24.00 | $26.00 | $50.00 |
| 611E02600 8" CONDUIT, TYPE F | 100 FT | $11.00 | $12.88 | $27.00 | $26.00 | $32.00 | $45.00 |
| 611E04600 12" CONDUIT, TYPE C | 2,862 FT | $38.00 | $39.00 | $43.00 | $46.00 | $67.50 | $37.00 |
| 611E05200 12" CONDUIT, TYPE F | 100 FT | $22.00 | $38.29 | $30.00 | $63.00 | $52.00 | $78.00 |
| 611E05900 15" CONDUIT, TYPE B | 495 FT | $65.00 | $63.22 | $71.00 | $87.00 | $107 | $78.00 |
| 611E06100 15" CONDUIT, TYPE C | 1,664 FT | $40.00 | $49.38 | $48.00 | $79.00 | $74.00 | $55.00 |
| 611E07400 18" CONDUIT, TYPE B | 328 FT | $60.00 | $73.76 | $79.00 | $87.00 | $108 | $73.00 |
| 611E07600 18" CONDUIT, TYPE C | 594 FT | $50.00 | $53.08 | $55.00 | $86.00 | $84.00 | $63.00 |
| 611E08900 21" CONDUIT, TYPE B | 191 FT | $68.00 | $76.00 | $92.00 | $127 | $107 | $100 |
| 611E09100 21" CONDUIT, TYPE C | 1,450 FT | $60.00 | $63.00 | $71.00 | $112 | $97.50 | $83.00 |
| 611E10600 24" CONDUIT, TYPE C | 503 FT | $60.00 | $63.00 | $76.00 | $112 | $99.50 | $83.00 |
| 611E16400 36" CONDUIT, TYPE B | 209 FT | $110 | $114 | $135 | $166 | $170 | $152 |
| 611E16600 36" CONDUIT, TYPE C | 1,743 FT | $90.00 | $100 | $100 | $151 | $165 | $116 |
| 611E19400 42" CONDUIT, TYPE B | 316 FT | $140 | $113 | $160 | $201 | $171 | $174 |
| 611E19600 42" CONDUIT, TYPE C | 980 FT | $120 | $117 | $140 | $165 | $167 | $142 |
| 611E20900 48" CONDUIT, TYPE B | 286 FT | $190 | $146 | $240 | $225 | $210 | $168 |
| 611E98370 CATCH BASIN, NO. 6 | 13 EACH | $2,500 | $2,397 | $3,400 | $4,000 | $3,575 | $2,200 |
| 611E98470 CATCH BASIN, NO. 2-2B | 40 EACH | $1,400 | $1,635 | $1,500 | $2,200 | $1,900 | $1,400 |
| 611E98510 CATCH BASIN, NO. 2-3 | 2 EACH | $2,500 | $1,965 | $1,700 | $2,700 | $2,200 | $1,900 |
| 611E98540 CATCH BASIN, NO. 2-4 | 4 EACH | $3,000 | $2,281 | $2,500 | $3,400 | $3,400 | $2,500 |
| 611E98570 CATCH BASIN, NO. 2-5 | 3 EACH | $4,000 | $3,784 | $3,400 | $5,100 | $4,600 | $3,750 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 4 EACH | $500 | $539 | $1,100 | $575 | $500 | $1,000 |
| 611E99574 MANHOLE, NO. 3 | 13 EACH | $4,500 | $4,212 | $3,300 | $6,200 | $6,225 | $5,000 |
| 611E99620 MANHOLE, NO. 5 | 21 EACH | $4,500 | $5,212 | $5,000 | $5,700 | $6,500 | $5,100 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 2 EACH | $725 | $452 | $1,000 | $550 | $100 | $1,000 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 89 EACH | $150 | $419 | $200 | $400 | $350 | $300 |
| 253E02000 PAVEMENT REPAIR | 46 CY | $325 | $320 | $320 | $320 | $320 | $320 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3.25" | 7,938 SY | $1.90 | $2.15 | $2.15 | $2.15 | $2.15 | $2.15 |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22, 3.5" | 201 CY | $200 | $200 | $200 | $200 | $200 | $200 |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22, 5" | 303 CY | $173 | $173 | $173 | $173 | $173 | $173 |
| 304E20000 AGGREGATE BASE, 8" | 852 CY | $40.00 | $31.30 | $57.00 | $71.00 | $48.00 | $65.00 |
| 407E20000 NON-TRACKING TACK COAT | 36,553 GAL | $2.25 | $2.25 | $2.25 | $2.25 | $2.25 | $2.25 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 177 CY | $300 | $300 | $300 | $300 | $300 | $300 |
| 609E18000 COMBINATION CURB AND GUTTER, TYPE 3 | 64 FT | $37.88 | $25.00 | $29.00 | $55.00 | $20.00 | $25.00 |
| 609E26000 CURB, TYPE 6 | 282 FT | $32.00 | $25.00 | $28.50 | $38.00 | $13.50 | $25.00 |
| 617E10100 COMPACTED AGGREGATE | 938 CY | $40.00 | $46.75 | $47.00 | $48.00 | $49.00 | $50.00 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 9,559 LB | $0.65 | $0.65 | $0.65 | $0.65 | $0.65 | $0.65 |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 3 | 5,163 SY | $1.90 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 |
| 301E46001 ASPHALT CONCRETE BASE, PG64-22, AS PER PLAN | 645 CY | $138 | $138 | $138 | $138 | $138 | $138 |
| 407E20001 NON-TRACKING TACK COAT, AS PER PLAN | 497 GAL | $2.25 | $2.25 | $2.25 | $2.25 | $2.25 | $2.25 |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 380 CY | $192 | $192 | $192 | $192 | $192 | $192 |
| 621E00100 RPM | 1,734 EACH | $25.50 | $25.27 | $25.75 | $25.50 | $24.75 | $24.75 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 1,734 EACH | $7.00 | $7.70 | $3.50 | $3.75 | $8.97 | $3.75 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, UNIDIRECTIONAL | 9 EACH | $20.00 | $7.34 | $7.30 | $14.00 | $7.30 | $7.30 |
| 626E00116 BARRIER REFLECTOR, TYPE 5, UNIDIRECTIONAL | 44 EACH | $20.00 | $8.54 | $8.50 | $14.00 | $8.50 | $8.50 |
| 630E03101 GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN | 2,104 FT | $11.50 | $11.63 | $10.00 | $11.50 | $11.50 | $11.50 |
| 630E07000 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W8X18 | 50 FT | $58.00 | $58.63 | $58.00 | $58.00 | $58.00 | $58.00 |
| 630E07600 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X12 | 45 FT | $43.00 | $43.47 | $43.00 | $43.00 | $43.00 | $43.00 |
| 630E08521 STREET NAME SIGN SUPPORT, NO. 3 POST, AS PER PLAN | 48 FT | $12.50 | $12.64 | $12.00 | $12.50 | $12.50 | $12.50 |
| 630E08601 SIGN POST REFLECTOR, AS PER PLAN | 64 EACH | $40.00 | $40.44 | $40.00 | $40.00 | $40.00 | $40.00 |
| 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION | 4 EACH | $615 | $622 | $615 | $615 | $615 | $615 |
| 630E80100 SIGN, FLAT SHEET | 869 SF | $14.00 | $14.15 | $18.00 | $14.00 | $14.00 | $14.00 |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 164 SF | $22.00 | $22.24 | $22.00 | $22.00 | $22.00 | $22.00 |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 4 EACH | $785 | $794 | $785 | $785 | $785 | $785 |
| 630E84501 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION, | 4 EACH | $495 | $500 | $495 | $495 | $495 | $495 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 276 EACH | $10.00 | $10.11 | $10.00 | $10.00 | $10.00 | $10.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 3 EACH | $65.00 | $65.71 | $65.00 | $65.00 | $65.00 | $65.00 |
| 630E85400 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND DISPOSAL | 2 EACH | $165 | $167 | $165 | $165 | $165 | $165 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $15.00 | $15.17 | $15.00 | $15.00 | $15.00 | $15.00 |
| 630E86003 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 250 EACH | $10.00 | $10.11 | $10.00 | $10.00 | $10.00 | $10.00 |
| 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT | 4 EACH | $185 | $187 | $185 | $185 | $185 | $185 |
| 630E97900 SIGNING, MISC.:6" X 8" WOOD POST | 86 FT | $32.50 | $32.86 | $32.50 | $32.50 | $32.50 | $32.50 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 18.42 MILE | $700 | $700 | $700 | $700 | $800 | $700 |
| 642E00204 LANE LINE, 6", TYPE 1 | 9.84 MILE | $500 | $500 | $500 | $500 | $700 | $500 |
| 642E00300 CENTER LINE, TYPE 1 | 7.16 MILE | $1,000 | $1,000 | $1,000 | $1,000 | $1,000 | $100 |
| 642E00404 CHANNELIZING LINE, 12", TYPE 1 | 3,301 FT | $1.00 | $1.00 | $1.00 | $1.00 | $2.00 | $1.00 |
| 644E00500 STOP LINE | 533 FT | $6.00 | $6.00 | $6.00 | $6.00 | $8.00 | $6.00 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 3,469 FT | $5.00 | $5.00 | $5.00 | $5.00 | $4.00 | $5.00 |
| 644E01300 LANE ARROW | 43 EACH | $90.00 | $90.00 | $90.00 | $90.00 | $127 | $90.00 |
| 644E01500 DOTTED LINE, 4" | 1,204 FT | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 50 HOUR | $98.37 | $80.00 | $60.00 | $75.00 | $75.00 | $60.00 |
| 614E12460 WORK ZONE MARKING SIGN | 20 EACH | $2,850 | $126 | $125 | $500 | $335 | $125 |
| 614E12500 REPLACEMENT SIGN | 5 EACH | $192 | $194 | $192 | $400 | $300 | $192 |
| 614E12600 REPLACEMENT DRUM | 5 EACH | $64.00 | $64.00 | $64.00 | $75.00 | $100 | $64.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 117 SNMT | $750 | $750 | $750 | $600 | $700 | $750 |
| 614E20010 WORK ZONE LANE LINE, CLASS I, 6" | 30.8 MILE | $500 | $500 | $500 | $500 | $550 | $500 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 15.82 MILE | $900 | $900 | $900 | $900 | $1,000 | $900 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" (WHITE) | 1.04 MILE | $600 | $600 | $600 | $600 | $800 | $600 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" (YELLOW) | 1.25 MILE | $600 | $600 | $600 | $600 | $800 | $600 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 6,602 FT | $0.50 | $0.50 | $0.50 | $0.50 | $0.75 | $0.50 |
| 614E24000 WORK ZONE DOTTED LINE, CLASS I | 1,075 FT | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 1,170 FT | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 |
| 614E30000 WORK ZONE ARROW, CLASS I | 86 EACH | $125 | $30.00 | $30.00 | $30.00 | $65.00 | $30.00 |
| 614E40051 BUSINESS ENTRANCE SIGN, AS PER PLAN | 3 EACH | $250 | $253 | $250 | $515 | $550 | $250 |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 1,451 SY | $52.94 | $40.00 | $50.00 | $42.97 | $55.00 | $40.00 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,850 | $1,941 | $2,850 | $3,900 | $1,920 | $2,850 |
| 614E13318 BARRIER REFLECTOR, TYPE 5, BIDIRECTIONAL | 10 EACH | $20.00 | $14.00 | $20.00 | $19.00 | $14.00 | $20.00 |
| 614E13360 OBJECT MARKER, TWO WAY, BIDIRECTIONAL | 10 EACH | $20.00 | $20.22 | $20.00 | $19.00 | $25.00 | $20.00 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $74,252 | $230,000 | $100,000 | $28,000 | $10,000 | $40,000 |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 460 FT | $23.11 | $43.00 | $20.00 | $22.50 | $20.00 | $22.00 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 61 LB | $4.00 | $30.28 | $5.00 | $5.00 | $6.00 | $5.00 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 16 EACH | $17.04 | $40.13 | $40.00 | $21.00 | $100 | $110 |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 0.9 CY | $902 | $6,128 | $4,000 | $2,700 | $4,200 | $5,000 |
| 512E33010 TYPE 3 WATERPROOFING | 425 SY | $29.34 | $40.00 | $40.00 | $40.00 | $36.00 | $40.00 |
| 516E31200 SPECIAL - SAWING AND SEALING BITUMINOUS CONCRETE J | 400 FT | $18.38 | $20.00 | $24.00 | $20.00 | $24.00 | $20.00 |
| 516E31200 SPECIAL - SAWING AND SEALING BITUMINOUS CONCRETE J | 460 FT | $18.38 | $20.00 | $24.00 | $20.00 | $24.00 | $20.00 |
| 516E31200 SPECIAL - SAWING AND SEALING BITUMINOUS CONCRETE J | 340 FT | $18.38 | $20.00 | $24.00 | $20.00 | $24.00 | $20.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $120,000 | $111,470 | $100,000 | $108,000 | $80,827 | $95,000 |
| 108E10000 CPM PROGRESS SCHEDULE | 1 LS | $16,200 | $10,000 | $10,000 | $5,000 | $10,000 | $20,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $125,000 | $250,000 | $300,000 | $300,000 | $600,000 | $675,000 |
| 619E16010 FIELD OFFICE, TYPE B | 16 MNTH | $2,200 | $1,500 | $2,600 | $6,650 | $5,000 | $1,850 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $70,000 | $60,000 | $51,650 | $120,000 | $100,000 | $140,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 302E46001 ASPHALT CONCRETE BASE, AS PER PLAN, 5" | 32,069 CY | $126 | $4.04M | 19% |
| 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 11,732 CY | $145 | $1.70M | 8% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 10,056 CY | $168 | $1.69M | 8% |
| 202E23000 PAVEMENT REMOVED | 209,675 SY | $7.65 | $1.60M | 7% |
| 304E20000 AGGREGATE BASE, 6" | 39,182 CY | $36 | $1.41M | 7% |
| 206E10500 CEMENT | 6,283 TON | $166 | $1.04M | 5% |
| 203E20000 EMBANKMENT | 130,267 CY | $8 | $1.04M | 5% |
| 624E10000 MOBILIZATION | 1 LS | $800,000 | $800k | 4% |
| 611E21100 48" CONDUIT, TYPE C | 5,546 FT | $130 | $721k | 3% |
| 206E15020 CEMENT STABILIZED SUBGRADE, 14 INCHES DEEP | 242,820 SY | $2.66 | $646k | 3% |