How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
1%
642E01510DOTTED LINE, 6", TYPE 1
39,730 FT
$0.50
$0.75
$0.75
1%
642E00500STOP LINE, TYPE 1
4,832 FT
$3.00
$3.95
$3.50
1%
624E10000MOBILIZATION
1 LS
$12,750
$15,000
$100,000
1%
642E01000RAILROAD SYMBOL MARKING, TYPE 1
30 EACH
$300
$380
$450
1%
642E00400CHANNELIZING LINE, 8", TYPE 1
19,991 FT
$0.45
$0.55
$0.75
1%
614E11110LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST
150 HOUR
$55.00
$75.00
$75.00
1%
103E05000PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM
1 LS
$7,374
$10,000
$13,000
0%
642E00620CROSSWALK LINE, 12", TYPE 1
3,788 FT
$1.75
$2.80
$3.00
0%
642E01110SCHOOL SYMBOL MARKING, 96", TYPE 1
22 EACH
$300
$380
$450
0%
642E01410WORD ON PAVEMENT, 96", TYPE 1
94 EACH
$70.00
$85.00
$85.00
0%
642E01322WRONG WAY ARROW, TYPE 1
27 EACH
$175
$205
$500
0%
642E01602BIKE LANE SYMBOL MARKING, TYPE 1
22 EACH
$75.00
$200
$250
0%
642E01312LANE REDUCTION ARROW, TYPE 1
2 EACH
$250
$250
$400
0%
LANE LINE, 6", TYPE 1
200.27 MILE
$380
$76k
5%
614E11000MAINTAINING TRAFFIC
1 LS
$40,000
$40k
3%
642E00404CHANNELIZING LINE, 12", TYPE 1
55,173 FT
$0.5
$28k
2%
642E01300LANE ARROW, TYPE 1
351 EACH
$60
$21k
1%
642E40001SPEED MEASUREMENT MARKING, AS PER PLAN
20 EACH
$1,000
$20k
1%
642E01510DOTTED LINE, 6", TYPE 1
39,730 FT
$0.5
$20k
1%
642E00500STOP LINE, TYPE 1
4,832 FT
$3
$14k
1%
624E10000MOBILIZATION
1 LS
$12,750
$13k
1%
D05-PM FY2022 (A) Fast Dry East · ODOT 220070 · Cassandri