LAK-SR 2-14.76/VAR Paint
LAK County · est $4.2M
Bid dateThursday, January 27—
LAK County · est $4.2M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 87 more items below.
| Item | Quantity | R1Vimas Painting Company INC | R2Elite Contractors INC | R3360 Construction Company INC | R4Legend Painting INC | R5Atsalis Brothers Painting CO | R6Corrosion Resistance LTD | R7Industrial Painting & Rigging INC | R8Panther Industrial Painting LLC | R9M & J Construction CO Of Pinellas County | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 57,800 SF | $9.50 | $7.00 | $10.00 | $6.00 | $10.10 | $8.50 | $10.50 | $8.50 | $8.00 | 20% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL |
| Item | Quantity | R1Vimas Painting Company INC | R2Elite Contractors INC | R3360 Construction Company INC | R4Legend Painting INC | R5Atsalis Brothers Painting CO | R6Corrosion Resistance LTD | R7Industrial Painting & Rigging INC | R8Panther Industrial Painting LLC | R9M & J Construction CO Of Pinellas County |
|---|---|---|---|---|---|---|---|---|---|---|
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $5,000 | $8,000 | $2,000 | $4,000 | $100 | $3,600 | $5,000 | $1,000 | $40,000 |
| 832E30000 EROSION CONTROL | 5,000 EACH |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 49,600 SF |
| $9.50 |
| $7.00 |
| $10.00 |
| $6.00 |
| $10.10 |
| $9.25 |
| $10.50 |
| $8.50 |
| $8.00 |
| 17% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 20,500 SF | $10.00 | $7.00 | $10.00 | $9.00 | $10.50 | $8.15 | $10.50 | $10.00 | $8.00 | 7% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 20,500 SF | $10.00 | $7.00 | $10.00 | $9.00 | $10.50 | $8.15 | $10.50 | $10.00 | $8.00 | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $175,000 | $170,000 | $125,000 | $46,215 | $155,000 | $135,000 | $150,000 | $200,000 | $351,658 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $160,000 | $135,000 | $75,000 | $265,500 | $72,500 | $95,000 | $150,000 | $150,000 | $300,000 | 6% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 9,100 SF | $10.00 | $12.20 | $11.00 | $11.00 | $11.50 | $8.00 | $10.50 | $10.00 | $8.00 | 3% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 9,100 SF | $10.00 | $12.20 | $11.00 | $11.00 | $11.50 | $8.10 | $10.50 | $10.00 | $8.00 | 3% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 9,100 SF | $10.00 | $10.00 | $11.00 | $11.00 | $11.50 | $8.10 | $10.50 | $12.00 | $8.00 | 3% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 9,100 SF | $10.00 | $10.00 | $11.00 | $11.00 | $11.50 | $8.10 | $10.50 | $12.00 | $8.00 | 3% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 7,800 SF | $10.00 | $10.00 | $12.00 | $11.00 | $11.50 | $9.40 | $10.50 | $12.00 | $8.00 | 3% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 7,800 SF | $10.00 | $10.00 | $12.00 | $11.00 | $11.50 | $9.40 | $10.50 | $12.00 | $8.00 | 3% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 6,600 SF | $10.00 | $10.00 | $12.00 | $11.00 | $11.50 | $11.00 | $10.50 | $12.00 | $8.00 | 2% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 6,600 SF | $10.00 | $10.00 | $12.00 | $11.00 | $11.50 | $11.00 | $10.50 | $12.00 | $8.00 | 2% |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 57,800 SF | $1.00 | $1.50 | $1.00 | $2.00 | $2.00 | $1.35 | $2.50 | $2.00 | $3.00 | 2% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 57,800 SF | $1.00 | $1.50 | $1.00 | $2.00 | $1.00 | $1.80 | $1.00 | $2.00 | $3.00 | 2% |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 57,800 SF | $1.00 | $1.50 | $1.00 | $2.00 | $1.00 | $2.85 | $1.00 | $2.00 | $3.00 | 2% |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 49,600 SF | $1.00 | $1.50 | $1.00 | $2.00 | $2.00 | $1.50 | $2.50 | $2.00 | $3.00 | 2% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 49,600 SF | $1.00 | $1.50 | $1.00 | $2.00 | $1.00 | $2.00 | $1.00 | $2.00 | $3.00 | 2% |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 49,600 SF | $1.00 | $1.50 | $1.00 | $2.00 | $1.00 | $3.25 | $1.00 | $2.00 | $3.00 | 2% |
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, DEPTH = 1 1/2" | 822 SY | $1.00 | $10.50 | $9.50 | $9.50 | $15.70 | $13.00 | $20.00 | $11.00 | $9.60 |
| 407E10000 TACK COAT | 70 GAL | $1.00 | $7.00 | $20.00 | $20.00 | $2.25 | $2.25 | $5.00 | $30.00 | $600 |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 34 CY | $1.00 | $700 | $950 | $950 | $508 | $550 | $508 | $1,200 | $882 |
| 618E40100 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 3,700 FT | $0.10 | $2.25 | $2.00 | $2.00 | $1.58 | $1.45 | $14.00 | $3.00 | $1.90 |
| 644E00104 EDGE LINE, 6" | 1.59 MILE | $100 | $3,700 | $3,700 | $3,700 | $3,700 | $3,700 | $3,700 | $1,500 | $4,440 |
| 644E00204 LANE LINE, 6" | 0.78 MILE | $100 | $2,100 | $2,100 | $2,100 | $2,100 | $2,100 | $2,100 | $1,100 | $2,520 |
| 644E00404 CHANNELIZING LINE, 12" | 240 FT | $1.00 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 | $3.60 |
| 644E01510 DOTTED LINE, 6" | 225 FT | $1.00 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 | $3.60 |
| 646E10010 EDGE LINE, 6" | 0.4 MILE | $100 | $7,000 | $7,000 | $7,000 | $7,000 | $7,000 | $7.00 | $5,000 | $8,400 |
| 646E10110 LANE LINE, 6" | 0.24 MILE | $100 | $6,000 | $6,000 | $6,000 | $6,000 | $6,000 | $6.00 | $5,000 | $7,200 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $1.00 | $75.00 | $75.00 | $150 | $80.00 | $75.00 | $75.00 | $100 | $82.00 |
| 614E11300 SPECIAL - WORK ZONE TRAFFIC SIGNAL | 3 EACH | $6,000 | $8,400 | $8,400 | $8,400 | $8,400 | $8,400 | $8,400 | $5,000 | $10,080 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $1.00 | $2,100 | $2,100 | $2,100 | $2,100 | $2,100 | $2,100 | $2,100 | $2,520 |
| 614E12420 DETOUR SIGNING | 1 LS | $3,000 | $6,955 | $6,955 | $6,955 | $6,955 | $6,955 | $6,955 | $7,000 | $8,346 |
| 614E12800 WORK ZONE RAISED PAVEMENT MARKER | 663 EACH | $1.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $15.00 | $7.20 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $1.00 | $10.00 | $200 | $1,200 | $750 | $400 | $250 | $15.00 | $3,000 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (ONE WAY) | 26 EACH | $1.00 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 | $16.00 | $18.00 |
| 614E13312 BARRIER REFLECTOR, TYPE 2 (ONE WAY) | 25 EACH | $1.00 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 | $18.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 51 EACH | $1.50 | $16.00 | $16.00 | $16.00 | $16.00 | $16.00 | $16.00 | $15.00 | $19.20 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 18 SNMT | $100 | $1,050 | $525 | $1,050 | $1,050 | $1,050 | $1,050 | $1,000 | $1,260 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 0.4 MILE | $100 | $3,750 | $3,750 | $3,750 | $3,750 | $3,750 | $3,750 | $3,500 | $4,500 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 1.63 MILE | $100 | $8,750 | $8,750 | $8,750 | $8,750 | $8,750 | $8,750 | $5,000 | $10,500 |
| 614E23210 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 642 PAI | 1,287 FT | $1.00 | $0.60 | $0.60 | $0.60 | $0.60 | $0.60 | $1.00 | $0.60 | $0.72 |
| 614E23410 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 740.06, | 4,355 FT | $0.10 | $3.50 | $3.50 | $3.50 | $3.50 | $3.50 | $3.50 | $3.00 | $4.20 |
| 614E24202 WORK ZONE DOTTED LINE, CLASS I, 6", 642 PAINT | 660 FT | $1.00 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 | $3.60 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 73 FT | $1.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $6.00 |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 1,200 FT | $0.10 | $20.00 | $48.00 | $48.00 | $48.00 | $30.00 | $53.00 | $25.00 | $57.60 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 58 MNHR | $150 | $150 | $100 | $40.00 | $100 | $35.00 | $85.00 | $200 | $100 |
| 514E10000 FINAL INSPECTION REPAIR | 39 EACH | $150 | $200 | $150 | $75.00 | $200 | $200 | $150 | $500 | $500 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 50 MNHR | $150 | $150 | $100 | $40.00 | $100 | $35.00 | $85.00 | $200 | $100 |
| 514E10000 FINAL INSPECTION REPAIR | 30 EACH | $150 | $200 | $150 | $75.00 | $200 | $250 | $150 | $500 | $500 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 9,100 SF | $1.00 | $2.00 | $2.00 | $2.00 | $2.00 | $1.60 | $2.50 | $2.00 | $3.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 9,100 SF | $1.00 | $2.00 | $2.00 | $2.00 | $1.00 | $2.70 | $1.00 | $2.00 | $3.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 9,100 SF | $1.00 | $2.00 | $2.00 | $2.00 | $1.00 | $3.00 | $1.00 | $2.00 | $3.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 16 MNHR | $150 | $150 | $100 | $40.00 | $100 | $35.00 | $85.00 | $200 | $100 |
| 514E10000 FINAL INSPECTION REPAIR | 11 EACH | $150 | $200 | $150 | $75.00 | $200 | $250 | $150 | $500 | $500 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 9,100 SF | $1.00 | $2.00 | $2.00 | $2.00 | $2.00 | $1.60 | $2.50 | $2.00 | $3.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 9,100 SF | $1.00 | $2.00 | $2.00 | $2.00 | $1.00 | $2.70 | $1.00 | $2.00 | $3.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 9,100 SF | $1.00 | $2.00 | $2.00 | $2.00 | $1.00 | $3.00 | $1.00 | $2.00 | $3.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 16 MNHR | $150 | $150 | $100 | $40.00 | $100 | $35.00 | $85.00 | $200 | $100 |
| 514E10000 FINAL INSPECTION REPAIR | 11 EACH | $150 | $200 | $150 | $75.00 | $200 | $250 | $150 | $500 | $500 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 6,600 SF | $1.00 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 | $2.50 | $2.00 | $3.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 6,600 SF | $1.00 | $2.00 | $2.00 | $2.00 | $1.00 | $3.60 | $1.00 | $2.00 | $4.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 6,600 SF | $1.00 | $2.00 | $2.00 | $2.00 | $1.00 | $4.00 | $1.00 | $2.00 | $3.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 13 MNHR | $150 | $150 | $100 | $40.00 | $100 | $35.00 | $85.00 | $200 | $100 |
| 514E10000 FINAL INSPECTION REPAIR | 8 EACH | $150 | $200 | $150 | $75.00 | $200 | $275 | $150 | $500 | $500 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 6,600 SF | $1.00 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 | $2.50 | $2.00 | $3.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 6,600 SF | $1.00 | $2.00 | $2.00 | $2.00 | $1.00 | $3.60 | $1.00 | $2.00 | $4.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 6,600 SF | $1.00 | $2.00 | $2.00 | $2.00 | $1.00 | $4.00 | $1.00 | $2.00 | $3.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 13 MNHR | $150 | $150 | $100 | $40.00 | $100 | $35.00 | $85.00 | $200 | $100 |
| 514E10000 FINAL INSPECTION REPAIR | 8 EACH | $150 | $200 | $150 | $75.00 | $200 | $275 | $150 | $500 | $500 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 7,800 SF | $1.00 | $2.00 | $2.00 | $2.00 | $2.00 | $1.80 | $2.50 | $2.00 | $3.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 7,800 SF | $1.00 | $2.00 | $2.00 | $2.00 | $1.00 | $3.00 | $1.00 | $2.00 | $3.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 7,800 SF | $1.00 | $2.00 | $2.00 | $2.00 | $1.00 | $3.40 | $1.00 | $2.00 | $3.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 14 MNHR | $150 | $150 | $100 | $40.00 | $100 | $35.00 | $85.00 | $200 | $100 |
| 514E10000 FINAL INSPECTION REPAIR | 9 EACH | $150 | $200 | $150 | $75.00 | $200 | $250 | $150 | $500 | $500 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 7,800 SF | $1.00 | $2.00 | $2.00 | $2.00 | $2.00 | $1.80 | $2.50 | $2.00 | $3.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 7,800 SF | $1.00 | $2.00 | $2.00 | $2.00 | $1.00 | $3.10 | $1.00 | $2.00 | $3.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 7,800 SF | $1.00 | $2.00 | $2.00 | $2.00 | $1.00 | $3.40 | $1.00 | $2.00 | $3.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 14 MNHR | $150 | $150 | $100 | $40.00 | $100 | $35.00 | $85.00 | $200 | $100 |
| 514E10000 FINAL INSPECTION REPAIR | 9 EACH | $150 | $200 | $150 | $75.00 | $200 | $275 | $150 | $500 | $500 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 20,500 SF | $1.00 | $2.20 | $1.50 | $2.00 | $2.00 | $1.50 | $2.50 | $2.00 | $3.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 20,500 SF | $1.00 | $2.20 | $1.00 | $2.00 | $1.00 | $1.90 | $1.00 | $2.00 | $3.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 20,500 SF | $1.00 | $2.20 | $1.00 | $2.00 | $1.00 | $3.05 | $1.00 | $2.00 | $3.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 22 MNHR | $150 | $150 | $100 | $40.00 | $100 | $35.00 | $85.00 | $200 | $100 |
| 514E10000 FINAL INSPECTION REPAIR | 14 EACH | $150 | $200 | $150 | $75.00 | $200 | $300 | $150 | $500 | $500 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 20,500 SF | $1.00 | $2.20 | $1.50 | $2.00 | $2.00 | $1.45 | $2.50 | $2.00 | $3.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 20,500 SF | $1.00 | $2.20 | $1.00 | $2.00 | $1.00 | $1.90 | $1.00 | $2.00 | $3.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 20,500 SF | $1.00 | $2.20 | $1.00 | $2.00 | $1.00 | $3.00 | $1.00 | $2.00 | $3.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 22 MNHR | $150 | $150 | $100 | $40.00 | $100 | $35.00 | $85.00 | $200 | $100 |
| 514E10000 FINAL INSPECTION REPAIR | 14 EACH | $150 | $200 | $150 | $75.00 | $200 | $300 | $150 | $500 | $500 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 9,100 SF | $1.00 | $2.00 | $2.00 | $2.00 | $2.00 | $1.60 | $2.50 | $2.00 | $3.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 9,100 SF | $1.00 | $2.00 | $2.00 | $2.00 | $1.00 | $2.70 | $1.00 | $2.00 | $3.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 9,100 SF | $1.00 | $2.00 | $2.00 | $2.00 | $1.00 | $3.00 | $1.00 | $2.00 | $3.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 16 MNHR | $150 | $150 | $100 | $40.00 | $100 | $35.00 | $85.00 | $200 | $100 |
| 514E10000 FINAL INSPECTION REPAIR | 12 EACH | $150 | $200 | $150 | $75.00 | $200 | $250 | $150 | $500 | $500 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 9,100 SF | $1.00 | $2.00 | $2.00 | $2.00 | $2.00 | $1.60 | $2.50 | $2.00 | $3.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 9,100 SF | $1.00 | $2.00 | $2.00 | $2.00 | $1.00 | $2.70 | $1.00 | $2.00 | $3.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 9,100 SF | $1.00 | $2.00 | $2.00 | $2.00 | $1.00 | $3.00 | $1.00 | $2.00 | $3.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 16 MNHR | $150 | $150 | $100 | $40.00 | $100 | $35.00 | $85.00 | $200 | $100 |
| 514E10000 FINAL INSPECTION REPAIR | 12 EACH | $150 | $200 | $150 | $75.00 | $200 | $240 | $150 | $500 | $500 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $8,000 | $20,000 | $5,000 | $5,000 | $10,000 | $5,000 | $15,000 | $25,000 | $40,000 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $38,000 | $100,000 | $44,000 | $45,000 | $35,000 | $30,000 | $77,162 | $100,000 | $73,000 |
| 619E16020 FIELD OFFICE, TYPE C | 9 MNTH | $2,500 | $400 | $2,000 | $1,000 | $1,500 | $1,800 | $750 | $2,000 | $6,905 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $5,000 | $200 | $500 | $3,000 | $3,840 | $8,000 | $9,000 | $1,000 | $20,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 57,800 SF | $9.5 | $549k | 17% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 49,600 SF | $9.5 | $471k | 15% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 20,500 SF | $10 | $205k | 6% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 20,500 SF | $10 | $205k | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $175,000 | $175k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $160,000 | $160k | 5% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 9,100 SF | $10 | $91k | 3% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 9,100 SF | $10 | $91k | 3% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 9,100 SF | $10 | $91k | 3% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 9,100 SF | $10 | $91k | 3% |