| Item | Quantity | R1Becdir Construction Company | R2Eagle Bridge CO | R3Prus Construction Company | R4Complete General Construction Company | % of bid |
|---|---|---|---|---|---|---|
| AA2 607E40000 SPECIAL - VANDAL PROTECTION FENCE(AESTHETIC VANDAL | 721 FT | $370 | $280 | $349 | $365 | 17% |
| 511E34460 CLASS QC SCC CONCRETE, BRIDGE DECK (PARAPET) | 124 CY | $1,650 | $1,650 | $977 | $1,800 | 13% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $200,000 | $156,000 | $250,000 | $65,000 | 13% |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 LS | $140,000 | $162,500 | $150,000 | $85,000 |
| Item | Quantity | R1Becdir Construction Company | R2Eagle Bridge CO | R3Prus Construction Company | R4Complete General Construction Company |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,000 | $7,500 | $13,500 | $7,000 |
| 202E23000 PAVEMENT REMOVED | 11 SY | $74.00 | $70.00 | $53.00 | $200 |
| 202E32000 CURB REMOVED | 10 FT | $2.65 | $12.00 | $48.00 | $150 |
| 202E38000 GUARDRAIL REMOVED | 300 FT | $6.50 | $5.00 | $6.00 | $6.00 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 9% |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 537 SF | $235 | $135 | $190 | $158 | 8% |
| 624E10000 MOBILIZATION | 1 LS | $85,000 | $40,000 | $100,000 | $100,000 | 6% |
| 519E00100 SPECIAL - COMPOSITE FIBER WRAP SYSTEM | 2,180 SF | $25.00 | $36.72 | $41.25 | $55.00 | 4% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $50,000 | $30,000 | $16,500 | $24,000 | 3% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 134 CY | $370 | $280 | $350 | $350 | 3% |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 2,648 SY | $18.00 | $20.00 | $33.00 | $20.00 | 3% |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 LS | $45,000 | $35,000 | $34,000 | $40,000 | 3% |
| 625E25500 CONDUIT, 3", 725.04 | 822 FT | $50.00 | $34.00 | $57.00 | $57.00 | 3% |
| 607E39994 TEMPORARY VANDAL FENCE, TYPE B | 721 FT | $42.00 | $40.00 | $40.00 | $40.00 | 2% |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 743 SY | $39.00 | $21.50 | $29.75 | $21.50 | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 400 HOUR | $71.00 | $85.00 | $90.00 | $80.00 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.00" DEPTH | 4,766 SY | $5.80 | $3.75 | $5.50 | $5.50 | 2% |
| 622E41110 PORTABLE BARRIER, ANCHORED | 1,080 FT | $25.00 | $23.50 | $23.50 | $23.50 | 2% |
| 510E10001 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, AS | 1,736 EACH | $15.00 | $20.00 | $19.50 | $25.00 | 2% |
| 842E10000 CORRECTING ELEVATION OF CONCRETE APPROACH SLABS WI | 5,000 LB | $5.00 | $4.65 | $4.65 | $6.00 | 2% |
| 842E10000 CORRECTING ELEVATION OF CONCRETE APPROACH SLABS WI | 5,000 LB | $5.00 | $4.65 | $4.65 | $6.00 | 2% |
| 2 EACH |
| $105 |
| $250 |
| $100 |
| $100 |
| 204E10000 SUBGRADE COMPACTION | 56 SY | $8.00 | $15.00 | $10.00 | $15.00 |
| 209E15050 RESHAPING UNDER GUARDRAIL | 0.12 MILE | $2,100 | $5.00 | $2,000 | $2,000 |
| 606E15050 GUARDRAIL, TYPE MGS | 250 FT | $31.50 | $25.00 | $30.00 | $30.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (NCHRP 350 OR MASH 201 | 2 EACH | $2,800 | $2,700 | $2,650 | $2,650 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $2,625 | $2,500 | $2,500 | $2,500 |
| 609E24510 CURB, TYPE 4-C | 50 FT | $85.00 | $65.00 | $60.00 | $85.00 |
| 621E00100 RPM | 14 EACH | $158 | $391 | $391 | $391 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 14 EACH | $27.00 | $25.00 | $14.00 | $50.00 |
| 690E98400 SPECIAL - CONSULTANT FOR CONCRETE QUALITY CONTROL | 1 LS | $9,500 | $15,000 | $3,600 | $9,000 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $1,250 | $2,500 | $1,000 | $10,000 |
| 659E10000 SEEDING AND MULCHING | 1,620 SY | $3.45 | $7.00 | $3.25 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.27 TON | $1,050 | $1,500 | $1,000 | $1,000 |
| 659E31000 LIME | 3.24 ACRE | $201 | $10.00 | $200 | $750 |
| 659E35000 WATER | 4.86 MGAL | $1.05 | $20.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 500 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 3 CY | $950 | $800 | $470 | $900 |
| 304E20000 AGGREGATE BASE | 10 CY | $235 | $175 | $300 | $200 |
| 407E20000 NON-TRACKING TACK COAT | 431 GAL | $10.50 | $3.00 | $10.00 | $10.00 |
| 626E00102 BARRIER REFLECTOR, TYPE 1 (BI-DIRECTIONAL) | 16 EACH | $14.70 | $10.00 | $10.00 | $10.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BI-DIRECTIONAL) | 12 EACH | $10.50 | $10.00 | $15.00 | $10.00 |
| 644E00104 EDGE LINE, 6" | 0.39 MILE | $9,250 | $8,795 | $8,795 | $8,795 |
| 644E00300 CENTER LINE | 0.42 MILE | $8,415 | $8,015 | $8,015 | $8,015 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 130 FT | $5.00 | $4.75 | $4.75 | $4.75 |
| 646E10010 EDGE LINE, 6" | 0.31 MILE | $15,000 | $14,230 | $14,230 | $14,230 |
| 646E10200 CENTER LINE | 0.27 MILE | $9,750 | $9,295 | $9,295 | $9,295 |
| 614E11630 INCREASED BARRIER DELINEATION | 3,978 FT | $3.35 | $2.00 | $3.20 | $3.20 |
| 614E12200 SPECIAL - WORK ZONE GUARDRAIL | 62.5 FT | $17.00 | $40.00 | $16.00 | $16.00 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,200 | $2,100 | $2,100 | $2,100 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BI-DIRECTIONAL) | 93 EACH | $18.00 | $10.00 | $17.00 | $17.00 |
| 614E13312 BARRIER REFLECTOR, TYPE 2 (BI-DIRECTIONAL) | 42 EACH | $17.35 | $10.00 | $16.50 | $16.50 |
| 614E13360 OBJECT MARKER, TWO WAY | 137 EACH | $23.00 | $15.00 | $22.00 | $22.00 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 0.51 MILE | $4,000 | $3,815 | $3,815 | $3,815 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 1.01 MILE | $3,750 | $3,565 | $3,565 | $3,565 |
| 614E22308 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE II | 0.03 MILE | $23,000 | $22,000 | $22,000 | $22,000 |
| 614E24602 WORK ZONE DOTTED LINE, CLASS I, 6", 740.06, TYPE I | 0.03 FT | $2,100 | $2,000 | $2,000 | $2,000 |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 700 FT | $21.50 | $20.50 | $20.50 | $20.50 |
| 509E20000 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 100 LB | $2.00 | $1.50 | $1.70 | $4.00 |
| 510E10001 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, AS | 10 EACH | $20.00 | $20.00 | $90.00 | $125 |
| 511E34410 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 8 CY | $3,000 | $1,750 | $3,400 | $4,500 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 743 SY | $27.00 | $21.50 | $33.50 | $21.50 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 682 SY | $29.00 | $25.50 | $30.00 | $30.00 |
| 607E39994 TEMPORARY VANDAL FENCE, TYPE B | 360 FT | $42.00 | $40.00 | $40.00 | $40.00 |
| 607E98200 FENCE, MISC.:VANDAL PROTECTION FENCE REMOVED AND R | 1 LS | $7,650 | $2,500 | $7,250 | $25,000 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $3,000 | $3,500 | $8,400 | $15,000 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 9,123 LB | $2.15 | $1.50 | $2.00 | $2.00 |
| 509E20000 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 100 LB | $2.00 | $2.00 | $1.70 | $3.00 |
| 509E30020 NO. 4 GFRP DEFORMED BARS | 13,015 FT | $0.90 | $2.00 | $1.80 | $2.00 |
| 509E40000 REINFORCING STEEL, MISC.: GALVANIZED REINFORCING | 7,413 LB | $2.75 | $2.50 | $2.75 | $3.50 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 101 SY | $35.00 | $25.50 | $99.00 | $30.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 17 SF | $12.00 | $12.00 | $16.50 | $10.00 |
| 516E31010 2" DEEP JOINT SEALER | 16 FT | $30.00 | $25.00 | $66.00 | $45.00 |
| 526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15") | 43 SY | $450 | $550 | $475 | $550 |
| 530E13000 SPECIAL - FORM LINER | 2,466 SF | $8.00 | $20.00 | $8.00 | $12.50 |
| 625E29940 BARRIER JUNCTION BOX | 6 EACH | $2,300 | $1,592 | $2,200 | $2,200 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $500 | $35,000 | $7,800 | $175,000 |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $15,000 | $150,000 | $192,000 | $215,000 |
| 842E10000 CORRECTING ELEVATION OF CONCRETE APPROACH SLABS WI | 4,000 LB | $5.00 | $4.65 | $4.65 | $6.50 |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 LS | $5,000 | $12,500 | $7,200 | $15,000 |
| 518E43300 6" PIPE DOWNSPOUT, INCLUDING SPECIALS | 100 FT | $210 | $475 | $200 | $350 |
| 518E62100 STRUCTURE DRAINAGE, MISC.: CLEANING BRIDGE DRAINAG | 200 FT | $13.00 | $30.00 | $41.00 | $110 |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 LS | $25,000 | $35,000 | $11,750 | $15,000 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 239 LB | $4.35 | $1.50 | $1.68 | $3.25 |
| 509E20000 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 100 LB | $2.00 | $1.50 | $1.78 | $6.00 |
| 510E10001 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, AS | 10 EACH | $20.00 | $20.00 | $72.00 | $35.00 |
| 511E34410 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 5 CY | $1,000 | $3,500 | $5,025 | $8,500 |
| 513E20001 WELDED STUD SHEAR CONNECTORS, AS PER PLAN | 22 EACH | $20.00 | $35.00 | $20.00 | $50.00 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,000 | $7,500 | $10,000 | $7,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| AA2 607E40000 SPECIAL - VANDAL PROTECTION FENCE(AESTHETIC VANDAL | 721 FT | $370 | $267k | 14% |
| 511E34460 CLASS QC SCC CONCRETE, BRIDGE DECK (PARAPET) | 124 CY | $1,650 | $205k | 10% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $200,000 | $200k | 10% |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 LS | $140,000 | $140k | 7% |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 537 SF | $235 | $126k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $85,000 | $85k | 4% |
| 519E00100 SPECIAL - COMPOSITE FIBER WRAP SYSTEM | 2,180 SF | $25 | $55k | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $50,000 | $50k | 3% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 134 CY | $370 | $50k | 3% |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 2,648 SY | $18 | $48k | 2% |