HAR-SR 31/SR 53/SR 67-10.16/Var
HAR County · est $0.7M
Bid dateThursday, March 10—
HAR County · est $0.7M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 6.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 21 more items below.
| Item | Quantity | R1Helms And Sons Excavating | R2Shelly Company | R3Bluffton Paving INC | % of bid |
|---|---|---|---|---|---|
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 1,149 CY | $210 | $215 | $227 | 43% |
| 253E02000 PAVEMENT REPAIR | 450 CY | $220 | $230 | $288 | 18% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE,1.50" THICKNESS | 27,570 SY | $1.79 | $2.45 | $2.80 | 9% |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 157 CY | $268 | $215 | $227 | 7% |
| 608E52000 CURB RAMP | 1,242 SF | $22.50 | $18.00 | $16.00 |
| Item | Quantity | R1Helms And Sons Excavating | R2Shelly Company | R3Bluffton Paving INC |
|---|---|---|---|---|
| 202E30000 WALK REMOVED | 1,881 SF | $1.50 | $4.50 | $5.00 |
| 202E32000 CURB REMOVED | 146 FT | $8.50 | $18.00 | $19.00 |
| 202E32500 CURB AND GUTTER REMOVED | 14 FT | $47.00 | $20.00 | $25.00 |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 6 FT | $162 | $65.00 | $125 |
| 623E39500 MONUMENT BOX ADJUSTED TO GRADE | 3 EACH | $448 | $100 | $750 |
| 659E00300 TOPSOIL | 6 CY |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $19,000 | $27,000 | $34,500 | 3% |
| 202E23500 WEARING COURSE REMOVED | 3,746 SY | $4.00 | $13.00 | $14.00 | 3% |
| 608E53020 DETECTABLE WARNING | 136 SF | $59.00 | $30.00 | $35.00 | 1% |
| 609E26000 CURB, TYPE 6 | 71 FT | $109 | $45.00 | $45.00 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 2,664 GAL | $2.50 | $2.00 | $1.60 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,500 | $7,000 | $6,000 | 1% |
| 624E10000 MOBILIZATION | 1 LS | $5,500 | $20,000 | $24,000 | 1% |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $5,000 | $2,500 | $5,000 | 1% |
| 608E10000 4" CONCRETE WALK | 415 SF | $12.00 | $18.00 | $9.00 | 1% |
| 254E01600 PATCHING PLANED SURFACE | 550 SY | $9.00 | $5.00 | $5.00 | 1% |
| 614E12460 WORK ZONE MARKING SIGN | 40 EACH | $111 | $100 | $100 | 1% |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 2,177 LB | $2.00 | $1.00 | $3.00 | 1% |
| 642E00300 CENTER LINE, TYPE 1 | 1.7 MILE | $2,355 | $2,122 | $2,122 | 1% |
| 643E00700 TRANSVERSE/DIAGONAL LINE | 437 FT | $8.50 | $7.50 | $7.50 | 1% |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 1.51 MILE | $2,220 | $2,000 | $2,500 | 1% |
| $224 |
| $150 |
| $150 |
| 659E10000 SEEDING AND MULCHING | 94 SY | $8.50 | $7.00 | $10.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.35 TON | $665 | $800 | $1,200 |
| 659E35000 WATER | 0.51 MGAL | $1.00 | $50.00 | $100 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 44 CY | $68.00 | $100 | $145 |
| 621E00100 RPM | 32 EACH | $72.00 | $65.00 | $65.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 32 EACH | $43.00 | $6.00 | $6.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.92 MILE | $1,986 | $1,790 | $1,790 |
| 643E00400 CHANNELIZING LINE, 8" | 290 FT | $2.50 | $2.50 | $2.50 |
| 643E00500 STOP LINE | 146 FT | $9.00 | $8.00 | $8.00 |
| 643E00620 CROSSWALK LINE, 12" | 791 FT | $3.50 | $3.00 | $3.00 |
| 643E00900 ISLAND MARKING | 165 SF | $6.10 | $5.50 | $5.50 |
| 643E01000 RAILROAD SYMBOL MARKING | 2 EACH | $883 | $796 | $796 |
| 643E01300 LANE ARROW | 5 EACH | $150 | $135 | $135 |
| 614E21400 WORK ZONE CENTER LINE, CLASS II | 3.02 MILE | $777 | $200 | $2,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 1,149 CY | $210 | $241k | 41% |
| 253E02000 PAVEMENT REPAIR | 450 CY | $220 | $99k | 17% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE,1.50" THICKNESS | 27,570 SY | $1.79 | $49k | 8% |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 157 CY | $268 | $42k | 7% |
| 608E52000 CURB RAMP | 1,242 SF | $22.5 | $28k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $19,000 | $19k | 3% |
| 202E23500 WEARING COURSE REMOVED | 3,746 SY | $4 | $15k | 3% |
| 608E53020 DETECTABLE WARNING | 136 SF | $59 | $8k | 1% |
| 609E26000 CURB, TYPE 6 | 71 FT | $109 | $8k | 1% |
| 407E20000 NON-TRACKING TACK COAT | 2,664 GAL | $2.5 | $7k | 1% |