Figure 0.1 · BRIEFING BID #220157 · ODOT RESULT · awarded Mar 10 D03-PM-FY2022 D03 County · est $3.5M
Bid date Thursday, March 10 —
Project scope Bid form · ODOT
37 ITEMS Pavement Marking 68% Maintaining Traffic 11% Mobilization & General 5% Erosion & Landscaping 3% Other 14% Top items by winning bid Item Qty Unit price Extended % 642E00104 EDGE LINE, 6", TYPE 1 2,965.84 MILE $718 $2.13M
Item Quantity R1 Oglesby Construction INC R2 The Aero-mark Company LLC % of bid 642E00104 EDGE LINE, 6", TYPE 1 2,965.84 MILE $718 $762 58% 642E00300 CENTER LINE, TYPE 1 1,135.89 MILE $670 $707 21% 642E00204 LANE LINE, 6", TYPE 1 470.97 MILE $345 $382 4% 643E00104 EDGE LINE, 6" 103.86 MILE $1,180 $1,276 3% 643E00700 TRANSVERSE/DIAGONAL LINE 34,144 FT $3.00 $3.76 3% 643E00300 CENTER LINE 53.57 MILE $1,250 $1,176 2% 643E01300 LANE ARROW 869 EACH $75.00 $76.00 2% 643E00500 STOP LINE 11,514 FT $4.20 $4.35 1% 614E11000 MAINTAINING TRAFFIC 1 LS $36,000 $20,000 1% 624E10000 MOBILIZATION 1 LS $31,000 $12,000 1% 643E40000 SPEED MEASUREMENT MARKING 24 EACH $1,100 $976 1% 618E43000 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE) 13.35 MILE $1,825 $2,405 1% 643E01000 RAILROAD SYMBOL MARKING 62 EACH $325 $375 1% 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM 1 LS $19,500 $19,918 1% 643E01110 SCHOOL SYMBOL MARKING, 96" 59 EACH $300 $375 0% 643E00400 CHANNELIZING LINE, 8" 26,707 FT $0.60 $0.60 0% 643E30030 REMOVAL OF PAVEMENT MARKING 4.28 MILE $3,000 $3,825 0% 643E00620 CROSSWALK LINE, 12" 4,266 FT $2.90 $2.75 0% 643E01410 WORD ON PAVEMENT, 96" 80 EACH $110 $97.00 0% 646E20300 LANE ARROW 40 EACH $200 $160 0%
Show all 37 line items Item Quantity R1 Oglesby Construction INC R2 The Aero-mark Company LLC 832E30000 EROSION CONTROL 1,000 EACH $1.00 $1.00 643E00404 CHANNELIZING LINE, 12" 6,735 FT $0.95 $1.00 643E00900 ISLAND MARKING 504 SF $2.15 $3.00 643E01310 WRONG WAY ARROW 30 EACH $200 $225 643E01510 DOTTED LINE, 6" 7,243 FT $0.90 $1.15 643E20802 YIELD LINE 112 FT $20.00 $37.00 643E30000 REMOVAL OF PAVEMENT MARKING 200 FT $2.00
Project details
Description D03-PM-FY2022
Type of work Pavement How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →