BRO-US 52-15.71 Culvert
BRO County · est $0.2M
Bid dateThursday, March 17—
BRO County · est $0.2M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 28 more items below.
| Item | Quantity | R1Allard Excavation LLC | R2Coopers Excavating LLC | R3D G M INC | % of bid |
|---|---|---|---|---|---|
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 81 CY | $309 | $309 | $320 | 15% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $24,000 | $25,000 | $30,000 | 14% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 77 CY | $291 | $327 | $305 | 13% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $15,000 | $10,000 | 12% |
| 611E10400 24" CONDUIT, TYPE B, (706.02, 707.33, 707.04) | 65 FT | $284 | $275 | $650 | 11% |
| Item | Quantity | R1Allard Excavation LLC | R2Coopers Excavating LLC | R3D G M INC |
|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 261 SY | $7.35 | $30.00 | $20.00 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $420 | $5,000 | $1,000 |
| 203E10000 EXCAVATION | 104 CY | $19.00 | $55.00 | $35.00 |
| 204E10000 SUBGRADE COMPACTION | 392 SY | $2.75 | $2.00 | $12.00 |
| 659E10000 SEEDING AND MULCHING | 826 SY | $2.25 | $4.50 | $5.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 41 SY |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $1,900 | $2,100 | $2,500 | 4% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 260 FT | $28.00 | $28.00 | $25.00 | 4% |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, 18" | 80 FT | $70.00 | $75.00 | $30.00 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,510 | $2,000 | $5,000 | 3% |
| 611E98410 CATCH BASIN, NO. 8 | 1 EACH | $5,206 | $5,000 | $10,000 | 3% |
| 304E20000 AGGREGATE BASE | 59 CY | $82.40 | $125 | $120 | 3% |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 0.35 MILE | $9,495 | $9,290 | $10,000 | 2% |
| 602E20000 CONCRETE MASONRY | 0.5 CY | $6,437 | $3,000 | $2,000 | 2% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $2,831 | $500 | $15,000 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,751 | $25,000 | $11,000 | 2% |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I | 0.19 MILE | $13,400 | $12,100 | $14,000 | 2% |
| 619E16000 FIELD OFFICE, TYPE A | 2 MNTH | $1,200 | $100 | $1,000 | 1% |
| 203E20000 EMBANKMENT | 276 CY | $8.50 | $50.00 | $35.00 | 1% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,200 | $10,000 | $17,500 | 1% |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 36 SY | $57.00 | $95.00 | $120 | 1% |
| $0.05 |
| $4.00 |
| $0.05 |
| 659E20000 COMMERCIAL FERTILIZER | 0.11 TON | $500 | $800 | $1,000 |
| 659E31000 LIME | 0.17 ACRE | $500 | $80.00 | $100 |
| 659E35000 WATER | 4.5 MGAL | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 2,000 EACH | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 65 FT | $15.00 | $30.00 | $30.00 |
| 670E00710 DITCH EROSION PROTECTION MAT, TYPE A | 250 SY | $3.40 | $10.00 | $6.00 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 63 FT | $3.55 | $15.00 | $15.00 |
| 407E10000 TACK COAT | 158 GAL | $9.00 | $9.00 | $9.00 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 10 CY | $71.45 | $100 | $120 |
| 621E00100 RPM | 6 EACH | $324 | $420 | $495 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 6 EACH | $6.75 | $5.00 | $1.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.2 MILE | $6,733 | $6,248 | $6,500 |
| 642E00300 CENTER LINE, TYPE 1 | 0.1 MILE | $6,733 | $12,495 | $12,000 |
| 304E20000 AGGREGATE BASE | 5 CY | $83.65 | $100 | $100 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 16 HOUR | $95.00 | $50.00 | $50.00 |
| 614E11630 INCREASED BARRIER DELINEATION | 300 FT | $2.25 | $3.25 | $3.00 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, (BIDIRECTIONAL) | 7 EACH | $12.00 | $15.00 | $110 |
| 614E13314 BARRIER REFLECTOR, TYPE 3, (BIDIRECTIONAL) | 9 EACH | $12.00 | $15.00 | $100 |
| 614E13360 OBJECT MARKER, TWO WAY | 15 EACH | $12.00 | $22.00 | $65.00 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 24 FT | $14.00 | $11.00 | $15.00 |
| 616E10000 WATER | 1 MGAL | $1.00 | $1.00 | $1.00 |
| 622E41110 PORTABLE BARRIER, ANCHORED | 40 FT | $32.00 | $32.00 | $35.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 81 CY | $309 | $25k | 13% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $24,000 | $24k | 13% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 77 CY | $291 | $22k | 12% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 10% |
| 611E10400 24" CONDUIT, TYPE B, (706.02, 707.33, 707.04) | 65 FT | $284 | $18k | 10% |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $1,900 | $8k | 4% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 260 FT | $28 | $7k | 4% |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, 18" | 80 FT | $70 | $6k | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,510 | $6k | 3% |
| 611E98410 CATCH BASIN, NO. 8 | 1 EACH | $5,206 | $5k | 3% |