JAC-SR 327-12.95 Culvert
JAC County · est $0.3M
Bid dateThursday, April 14—
JAC County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 19 more items below.
| Item | Quantity | R1Alan Stone CO INC | R2R C Construction Company And Son INC | R3Allard Excavation LLC | R4D G M INC | % of bid |
|---|---|---|---|---|---|---|
| 611E23600 60" CONDUIT, TYPE A (CONCRETE 706.02 OR 706.03) | 128 FT | $674 | $595 | $737 | $810 | 35% |
| 253E02000 PAVEMENT REPAIR | 100 CY | $250 | $25.00 | $355 | $175 | 10% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 50 CY | $380 | $45.00 | $275 | $150 | 8% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 54 CY | $320 | $375 | $355 | $375 |
| Item | Quantity | R1Alan Stone CO INC | R2R C Construction Company And Son INC | R3Allard Excavation LLC | R4D G M INC |
|---|---|---|---|---|---|
| 202E35200 PIPE REMOVED, OVER 24" | 125 FT | $13.00 | $200 | $16.40 | $60.00 |
| 202E38000 GUARDRAIL REMOVED | 150 FT | $4.00 | $5.00 | $5.00 | $1.00 |
| 202E53100 MAILBOX REMOVED | 1 EACH | $260 | $150 | $47.00 | $20.00 |
| 202E75000 FENCE REMOVED | 135 FT | $2.50 | $10.00 | $3.50 | $3.00 |
| 203E20000 EMBANKMENT | 117 CY | $16.50 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 7% |
| 624E10000 MOBILIZATION | 1 LS | $16,000 | $19,500 | $20,000 | $10,000 | 6% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 31 CY | $372 | $450 | $505 | $525 | 5% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $9,700 | $15,000 | $4,000 | $3,000 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $8,500 | $12,500 | $8,450 | $27,000 | 3% |
| 203E10000 EXCAVATION | 291 CY | $27.50 | $25.00 | $16.50 | $20.00 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $6,000 | $2,500 | $4,100 | $12,000 | 2% |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $7,500 | $4,100 | $3,500 | 2% |
| 602E20000 CONCRETE MASONRY | 3.9 CY | $1,200 | $2,300 | $1,750 | $1,500 | 2% |
| 304E20000 AGGREGATE BASE | 48 CY | $96.00 | $125 | $126 | $90.00 | 2% |
| 659E10000 SEEDING AND MULCHING | 916 SY | $5.00 | $10.00 | $6.75 | $3.00 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1 1/2 INCH) | 217 SY | $21.00 | $20.00 | $31.00 | $31.00 | 2% |
| 202E20010 HEADWALL REMOVED | 2 EACH | $1,800 | $4,000 | $1,935 | $400 | 1% |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 31 CY | $110 | $125 | $115 | $110 | 1% |
| 621E00100 RPM | 3 EACH | $1,100 | $950 | $1,500 | $1,500 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,000 | $8,500 | $3,463 | $12,500 | 1% |
| $25.00 |
| $25.00 |
| $20.00 |
| 204E10000 SUBGRADE COMPACTION | 300 SY | $2.00 | $2.00 | $6.00 | $6.00 |
| 690E50000 SPECIAL - MAILBOX SUPPORT | 1 EACH | $139 | $250 | $150 | $250 |
| 601E32110 ROCK CHANNEL PROTECTION, TYPE B WITH AGGREGATE FIL | 11 CY | $95.50 | $125 | $141 | $120 |
| 659E14000 REPAIR SEEDING AND MULCHING | 46 SY | $1.50 | $0.20 | $0.05 | $0.05 |
| 659E20000 COMMERCIAL FERTILIZER | 0.12 TON | $2,100 | $1,200 | $1,000 | $1,000 |
| 659E31000 LIME | 0.19 ACRE | $278 | $800 | $85.00 | $100 |
| 659E35000 WATER | 5 MGAL | $0.01 | $1.00 | $1.00 | $1.00 |
| 407E10000 TACK COAT | 136 GAL | $8.00 | $10.00 | $1.85 | $1.85 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 3 EACH | $35.50 | $50.00 | $9.00 | $1.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.06 MILE | $30,000 | $45,000 | $12,975 | $14,000 |
| 642E00300 CENTER LINE, TYPE 1 | 0.03 MILE | $45,000 | $45,000 | $25,550 | $28,000 |
| 407E10000 TACK COAT | 200 GAL | $8.50 | $1.00 | $1.85 | $4.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 8 HOUR | $94.50 | $25.00 | $95.00 | $40.00 |
| 616E10000 WATER | 5 MGAL | $1.00 | $1.00 | $1.00 | $1.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E23600 60" CONDUIT, TYPE A (CONCRETE 706.02 OR 706.03) | 128 FT | $674 | $86k | 33% |
| 253E02000 PAVEMENT REPAIR | 100 CY | $250 | $25k | 10% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 50 CY | $380 | $19k | 7% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 54 CY | $320 | $17k | 7% |
| 624E10000 MOBILIZATION | 1 LS | $16,000 | $16k | 6% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 31 CY | $372 | $12k | 4% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $9,700 | $10k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $8,500 | $9k | 3% |
| 203E10000 EXCAVATION | 291 CY | $27.5 | $8k | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $6,000 | $6k | 2% |