CLE-US 50/SR 131-02.21/08.51
CLE County · est $1.3M
Bid dateThursday, May 26—
CLE County · est $1.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 41 more items below.
| Item | Quantity | R1John R Jurgensen Company | R2Barrett Paving Materials INC | % of bid |
|---|---|---|---|---|
| 424E14000 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 448 (2703 CY | $285 | $350 | 53% |
| 253E02000 PAVEMENT REPAIR, (A) | 225 CY | $581 | $525 | 9% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A, 1" | 97,295 SY | $1.24 | $2.50 | 8% |
| 644E00104 EDGE LINE, 6" | 11.72 MILE | $4,385 | $4,385 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $55,000 | 3% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 400 HOUR | $93.90 | $85.00 | 3% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 4 EACH | $8,250 | $8,250 | 2% |
| 407E20000 NON-TRACKING TACK COAT | 5,838 GAL | $5.00 | $4.00 | 2% |
| 644E00300 CENTER LINE | 6.16 MILE | $4,465 | $4,465 | 2% |
| 617E10100 COMPACTED AGGREGATE | 286 CY | $94.52 | $165 | 2% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | — | $3,075 | $3,075 | 2% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 3 EACH | $7,950 | $7,950 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $23,083 | $255,000 | 2% |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 41.76 CF | $475 | $475 | 1% |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 41.76 CF | $475 | $475 | 1% |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 37.58 CF | $475 | $475 | 1% |
| 621E00100 RPM | 587 EACH | $27.15 | $27.15 | 1% |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 30.06 CF | $475 | $475 | 1% |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 587 EACH | $22.33 | $8.50 | 1% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 325 FT | $38.50 | $38.50 | 1% |
| Item | Quantity | R1John R Jurgensen Company | R2Barrett Paving Materials INC |
|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 2 SY | $520 | $75.00 |
| 202E30000 WALK REMOVED | 474 SF | $10.00 | $10.00 |
| 202E32000 CURB REMOVED | 4 FT | $100 | $100 |
| 202E38000 GUARDRAIL REMOVED | 525 FT | $5.00 | $5.00 |
| 202E42001 ANCHOR ASSEMBLY REMOVED, TYPE A, AS PER PLAN | 8 EACH | $400 | $400 |
| 203E10000 EXCAVATION | 1 CY | $396 | $650 |
| 608E10000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 86 SF |
| $20.85 |
| $20.00 |
| 608E52000 CURB RAMP | 450 SF | $25.85 | $25.00 |
| 623E39500 MONUMENT ASSEMBLY ADJUSTED TO GRADE | 2 EACH | $809 | $1,450 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 2 EACH | $751 | $1,600 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 5 EACH | $751 | $1,200 |
| 253E02000 PAVEMENT REPAIR, (B) | 10 CY | $345 | $650 |
| 617E20000 SHOULDER PREPARATION | 6,876 SY | $0.98 | $1.00 |
| 617E25000 WATER | 6 MGAL | $87.53 | $45.00 |
| 897E02000 PATCHING PLANED SURFACE | 979 SY | $4.18 | $8.00 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 5 EACH | $576 | $750 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BI-DIRECTIONAL | 14 EACH | $11.00 | $11.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 39 FT | $15.50 | $20.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2 EACH | $10.00 | $25.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 4 EACH | $35.00 | $80.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $15.00 | $30.00 |
| 644E00404 CHANNELIZING LINE, 12" | 1,480 FT | $1.50 | $1.50 |
| 644E00500 STOP LINE | 202 FT | $5.95 | $5.95 |
| 644E00620 CROSSWALK LINE, 12" | 315 FT | $4.95 | $4.95 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 410 FT | $5.45 | $5.45 |
| 644E00720 CHEVRON MARKING | 46 FT | $5.45 | $5.45 |
| 644E00900 ISLAND MARKING | 236 SF | $4.95 | $4.95 |
| 644E01300 LANE ARROW | 44 EACH | $125 | $125 |
| 644E01510 DOTTED LINE, 6" | 160 FT | $1.25 | $1.25 |
| 646E10010 EDGE LINE, 6" | 0.12 MILE | $23,630 | $23,630 |
| 646E10200 CENTER LINE | 0.06 MILE | $24,565 | $24,565 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 6.16 MILE | $640 | $640 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 11.72 MILE | $620 | $620 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 1,480 FT | $0.75 | $0.75 |
| 614E24612 WORK ZONE DOTTED LINE, CLASS III, 6", 642 PAINT | 160 FT | $0.70 | $0.70 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 202 FT | $3.50 | $3.50 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 46 EACH | $75.00 | $75.00 |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 56 FT | $134 | $134 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $8,233 | $5,942 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $733 | $7,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 424E14000 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 448 (2703 CY | $284.74 | $770k | 49% |
| 253E02000 PAVEMENT REPAIR, (A) | 225 CY | $580.77 | $131k | 8% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A, 1" | 97,295 SY | $1.24 | $121k | 8% |
| 644E00104 EDGE LINE, 6" | 11.72 MILE | $4,385 | $51k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 3% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 400 HOUR | $93.9 | $38k | 2% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 4 EACH | $8,250 | $33k | 2% |
| 407E20000 NON-TRACKING TACK COAT | 5,838 GAL | $5 | $29k | 2% |
| 644E00300 CENTER LINE | 6.16 MILE | $4,465 | $28k | 2% |
| 617E10100 COMPACTED AGGREGATE | 286 CY | $94.52 | $27k | 2% |