FRA-US 33-22.93
FRA County · est $2.9M
Bid dateThursday, May 26—
FRA County · est $2.9M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 32 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Kokosing Construction Company INC | % of bid |
|---|---|---|---|---|
| 255E10161 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 2,856 SY | $255 | $235 | 25% |
| 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 2,412 CY | $185 | $275 | 16% |
| 442E10080 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 2,296 CY | $185 | $242 | 15% |
| 255E10501 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 548 SY | $600 | $720 | 11% |
| 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 637 CY | $215 | $340 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $127,000 | $175,191 | 4% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN1.7 | 42,649 SY | $2.40 | $1.75 | 4% |
| 624E10000 |
| Item | Quantity | R1Shelly & Sands INC | R2Kokosing Construction Company INC |
|---|---|---|---|
| 202E30701 CONCRETE BARRIER REMOVED, AS PER PLAN | 30 FT | $105 | $100 |
| 202E38001 GUARDRAIL REMOVED, AS PER PLAN | 125 FT | $5.25 | $5.00 |
| 202E42011 ANCHOR ASSEMBLY REMOVED, TYPE E, AS PER PLAN | 1 EACH | $264 | $250 |
| 653E10000 TOPSOIL FURNISHED AND PLACED | 2 CY | $317 | $200 |
| 659E10000 SEEDING AND MULCHING | 7 SY | $248 | $400 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 |
| 617E25000 WATER |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $100,000 |
| $100,000 |
| 3% |
| 872E10000 VOID REDUCING ASPHALT MEMBRANE (VRAM) | 20,438 FT | $4.15 | $1.93 | 3% |
| 251E01041 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 961 SY | $81.50 | $106 | 3% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 800 HOUR | $90.00 | $100 | 3% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN1.5 | 15,750 SY | $3.70 | $5.45 | 2% |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 4,244 CY | $9.75 | $0.50 | 1% |
| 257E10001 DIAMOND GRINDING PORTLAND CEMENT CONCRETE PAVEMENT | 2,313 SY | $13.00 | $12.24 | 1% |
| 644E00104 EDGE LINE, 6" | 6.72 MILE | $4,075 | $3,860 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 8,823 GAL | $3.00 | $2.25 | 1% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN3.2 | 4,605 SY | $5.25 | $7.40 | 1% |
| 617E10100 COMPACTED AGGREGATE | 147 CY | $120 | $100 | 1% |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 11.84 MILE | $892 | $865 | 0% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,000 | $12,000 | 0% |
| 5 MGAL |
| $160 |
| $6.50 |
| 618E40600 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 4.76 MILE | $1,320 | $1,250 |
| 620E00500 DELINEATOR, POST GROUND MOUNTED | 12 EACH | $74.00 | $70.00 |
| 621E00100 RPM | 242 EACH | $35.00 | $34.25 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 242 EACH | $5.80 | $2.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 84 FT | $10.60 | $10.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 120 FT | $19.60 | $18.50 |
| 630E08600 SIGN POST REFLECTOR | 12 EACH | $47.50 | $45.00 |
| 630E80100 SIGN, FLAT SHEET | 140 SF | $21.00 | $20.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 8 EACH | $27.00 | $25.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 1.62 MILE | $945 | $895 |
| 642E00204 LANE LINE, 6", TYPE 1 | 0.51 MILE | $802 | $760 |
| 642E00404 CHANNELIZING LINE, 12", TYPE 1 | 490 FT | $1.05 | $1.00 |
| 644E00204 LANE LINE, 6" | 2.58 MILE | $2,320 | $2,195 |
| 644E00404 CHANNELIZING LINE, 12" | 2,171 FT | $2.00 | $1.90 |
| 644E00500 STOP LINE | 30 FT | $9.30 | $8.80 |
| 644E00720 CHEVRON MARKING | 256 FT | $8.00 | $7.50 |
| 644E01300 LANE ARROW | 1 EACH | $143 | $135 |
| 644E01360 WRONG WAY ARROW | 2 EACH | $220 | $210 |
| 644E01520 DOTTED LINE, 12" | 1,852 FT | $1.05 | $1.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $7,500 | $6,850 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 8 SNMT | $850 | $750 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 5.14 MILE | $892 | $560 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 2,311 FT | $1.00 | $0.60 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 18 FT | $5.30 | $4.10 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $4,500 | $2,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 255E10161 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 2,856 SY | $255 | $728k | 25% |
| 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 2,412 CY | $185 | $446k | 15% |
| 442E10080 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 2,296 CY | $185 | $425k | 14% |
| 255E10501 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 548 SY | $600 | $329k | 11% |
| 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 637 CY | $215 | $137k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $127,000 | $127k | 4% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN1.7 | 42,649 SY | $2.4 | $102k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 3% |
| 872E10000 VOID REDUCING ASPHALT MEMBRANE (VRAM) | 20,438 FT | $4.15 | $85k | 3% |
| 251E01041 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 961 SY | $81.5 | $78k | 3% |