LOR-SR 83-15.31
LOR County · est $1.2M
Bid dateThursday, June 30—
LOR County · est $1.2M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 70 more items below.
| Item | Quantity | R1Kokosing Construction Company INC | R2Karvo Companies INC | R3Shelly Company | % of bid |
|---|---|---|---|---|---|
| 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 1,710 CY | $290 | $295 | $290 | 42% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 336 CY | $376 | $305 | $400 | 11% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 84 CY | $1,115 | $800 | $800 | 8% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.5") | 39,230 SY | $1.85 | $2.00 | $3.50 | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $63,305 | $123,388 | $360,000 | 5% |
| 253E02000 PAVEMENT REPAIR (LONGITUDINAL) | 101 CY | $473 | $368 | $450 | 4% |
| 624E10000 MOBILIZATION |
| Item | Quantity | R1Kokosing Construction Company INC | R2Karvo Companies INC | R3Shelly Company |
|---|---|---|---|---|
| 202E30000 WALK REMOVED | 1,909 SF | $4.25 | $10.00 | $3.50 |
| 202E32000 CURB REMOVED | 178 FT | $15.50 | $10.00 | $20.50 |
| 202E38000 GUARDRAIL REMOVED | 125 FT | $2.00 | $2.00 | $2.00 |
| 202E38201 GUARDRAIL REMOVED FOR REUSE, AS PER PLAN | 12.5 FT | $2.40 | $2.40 | $2.40 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 3 EACH | $115 | $115 | $115 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $40,000 |
| $100,000 |
| $60,000 |
| 3% |
| 617E10100 COMPACTED AGGREGATE | 449 CY | $87.00 | $80.00 | $100 | 3% |
| 846E00111 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM, A | 59 CF | $600 | $600 | $600 | 3% |
| 253E02000 PAVEMENT REPAIR (TRANSVERSE) | 25 CY | $917 | $800 | $800 | 2% |
| 209E60501 LINEAR GRADING, AS PER PLAN | 4.82 MILE | $4,435 | $1,860 | $2,140 | 2% |
| AA2 644E00100 EDGE LINE, 4" (ALTERNATE 2) | 4.98 MILE | $3,950 | $3,950 | $3,682 | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 200 HOUR | $82.00 | $75.00 | $65.00 | 1% |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 112.5 FT | $136 | $138 | $136 | 1% |
| AA2 644E00300 CENTER LINE (ALTERNATE 2) | 2.81 MILE | $5,250 | $5,250 | $6,921 | 1% |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 10 EACH | $1,400 | $1,450 | $1,400 | 1% |
| AA2 646E10510 CROSSWALK LINE, 12" (ALTERNATE 2) | 691 FT | $20.00 | $20.00 | $11.75 | 1% |
| 408E10001 PRIME COAT, AS PER PLAN | 2,269 GAL | $6.00 | $5.00 | $4.75 | 1% |
| 255E10160 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 50 SY | $225 | $225 | $175 | 1% |
| 255E10161 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 50 SY | $225 | $230 | $275 | 1% |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 4 EACH | $55.00 | $55.00 | $55.00 |
| 203E20001 EMBANKMENT, AS PER PLAN (CURB RAMP) | 15 CY | $42.00 | $178 | $300 |
| 203E20001 EMBANKMENT, AS PER PLAN (GUARDRAIL) | 13 CY | $95.00 | $95.00 | $95.00 |
| 209E15000 RESHAPING UNDER GUARDRAIL | 2.25 STA | $60.00 | $60.00 | $60.00 |
| 209E80000 GRADING MAILBOX APPROACHES | 86 EACH | $55.00 | $100 | $185 |
| 606E13000 GUARDRAIL, TYPE 5 | 125 FT | $26.40 | $26.40 | $26.40 |
| 606E16501 GUARDRAIL REBUILT, TYPE 5, AS PER PLAN | 12.5 FT | $18.00 | $18.00 | $18.00 |
| 606E17000 RAISING TYPE 5 GUARDRAIL | 75 FT | $6.40 | $6.40 | $6.40 |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 1 EACH | $1,430 | $1,430 | $1,430 |
| 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4 | 2 EACH | $1,180 | $1,180 | $1,180 |
| 606E35141 BRIDGE TERMINAL ASSEMBLY, TYPE 4, AS PER PLAN | 2 EACH | $1,720 | $1,720 | $1,720 |
| 608E10000 4" CONCRETE WALK | 711 SF | $14.00 | $12.00 | $10.00 |
| 608E52000 CURB RAMP | 800 SF | $14.00 | $18.00 | $31.00 |
| 609E20000 CURB, TYPE 3-A | 86 FT | $37.00 | $20.00 | $34.00 |
| 623E39500 MONUMENT ASSEMBLY ADJUSTED TO GRADE | 2 EACH | $960 | $900 | $1,125 |
| 623E39601 MONUMENT ASSEMBLY RECONSTRUCTED TO GRADE, AS PER P | 1 EACH | $880 | $1,200 | $1,550 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 1 EACH | $185 | $185 | $185 |
| 690E50300 SPECIAL - MAILBOX SUPPORT SYSTEM, MULTIPLE | 1 EACH | $295 | $295 | $295 |
| 832E30000 EROSION CONTROL | 2,000 EACH | $1.00 | $1.00 | $1.00 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 2 EACH | $1,100 | $1,375 | $1,225 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 4 EACH | $1,020 | $1,350 | $1,225 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 1,000 LB | $2.45 | $3.00 | $3.00 |
| 254E01600 PATCHING PLANED SURFACE | 204 SY | $1.25 | $0.50 | $2.50 |
| 255E20000 FULL DEPTH PAVEMENT SAWING (LONGITUDINAL) | 425 FT | $9.95 | $5.00 | $5.25 |
| 255E20000 FULL DEPTH PAVEMENT SAWING (TRANSVERSE) | 300 FT | $10.95 | $5.00 | $5.25 |
| 407E20000 NON-TRACKING TACK COAT | 3,279 GAL | $2.50 | $3.00 | $3.00 |
| 617E20000 SHOULDER PREPARATION | 5,659 SY | $0.65 | $1.75 | $1.25 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 10 EACH | $560 | $800 | $1,050 |
| 621E00100 RPM | 206 EACH | $41.07 | $42.50 | $41.25 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 116 EACH | $11.30 | $2.00 | $10.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 9 EACH | $10.00 | $10.00 | $10.00 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 4 EACH | $175 | $435 | $175 |
| 630E80100 SIGN, FLAT SHEET | 47 SF | $21.00 | $25.00 | $21.00 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 4 EACH | $45.00 | $20.00 | $45.00 |
| 630E87520 REMOVAL OF POLE MOUNTED SIGN AND REERECTION | 3 EACH | $125 | $165 | $125 |
| AA2 644E00400 CHANNELIZING LINE, 8" (ALTERNATE 2) | 1,210 FT | $3.00 | $3.00 | $2.00 |
| AA2 644E00500 STOP LINE (ALTERNATE 2) | 260 FT | $6.00 | $6.00 | $8.00 |
| AA2 644E00620 CROSSWALK LINE, 12" (ALTERNATE 2) | 320 FT | $3.75 | $3.75 | $2.00 |
| AA2 644E00700 TRANSVERSE/DIAGONAL LINE (ALTERNATE 2) | 1,740 FT | $6.00 | $6.00 | $6.00 |
| AA2 644E00900 ISLAND MARKING (ALTERNATE 2) | 100 SF | $4.00 | $4.00 | $6.00 |
| AA2 644E01300 LANE ARROW (ALTERNATE 2) | 30 EACH | $115 | $115 | $100 |
| AA2 644E50300 PAVEMENT MARKING, MISC.: CROSSWALK LINE, 18", AS P | 64 FT | $15.00 | $15.00 | $15.00 |
| AA2 646E10517 CROSSWALK LINE, 18", AS PER PLAN (ALTERNATE 2) | 30 FT | $25.00 | $25.00 | $25.60 |
| 625E31600 PULL BOX, MISC.: PULL BOX ADJUSTED TO GRADE | 1 EACH | $350 | $350 | $350 |
| 625E32000 GROUND ROD | 2 EACH | $300 | $350 | $300 |
| 632E64021 PEDESTAL FOUNDATION, AS PER PLAN | 2 EACH | $1,500 | $1,750 | $1,500 |
| 632E90010 PEDESTAL, MISC.: REUSE OF PEDESTRIAN PEDESTAL | 2 EACH | $750 | $1,400 | $750 |
| 632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM (PEDE | 2 EACH | $500 | $350 | $500 |
| 632E90203 REUSE OF PEDESTRIAN SIGNAL HEAD, AS PER PLAN | 3 EACH | $500 | $675 | $500 |
| 632E90211 REUSE OF PEDESTRIAN PUSHBUTTON, AS PER PLAN | 7 EACH | $300 | $300 | $300 |
| 614E12460 WORK ZONE MARKING SIGN | 36 EACH | $60.00 | $60.00 | $60.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 25 CY | $100 | $275 | $125 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 4 SNMT | $930 | $930 | $930 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 6.68 MILE | $1,000 | $1,000 | $950 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 2,420 FT | $0.75 | $0.75 | $1.00 |
| 614E25620 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS III, 642 | 3,480 FT | $3.00 | $3.00 | $2.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 520 FT | $3.00 | $3.00 | $3.00 |
| 614E27250 WORK ZONE CROSSWALK LINE, CLASS III, 12", 642 PAIN | 2,022 FT | $3.00 | $3.00 | $1.00 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 60 EACH | $45.00 | $45.00 | $75.00 |
| 202E38603 BRIDGE RAILING REMOVED FOR REUSE, AS PER PLAN | 112.5 FT | $24.00 | $24.00 | $24.00 |
| 202E98200 REMOVAL MISC.: POLYMER MODIFIED ASPHALT EXPANSION | 80 FT | $50.00 | $50.00 | $50.00 |
| 517E76300 RAILING, MISC.: DEEP BEAM RAILING PANELS | 112.5 FT | $18.40 | $19.60 | $18.40 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,500 | $15,000 | $8,000 |
| 619E16010 FIELD OFFICE, TYPE B | 2 MNTH | $1,850 | $2,000 | $2,200 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,250 | $2,200 | $5,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 1,710 CY | $290 | $496k | 36% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 336 CY | $376 | $126k | 9% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 84 CY | $1,115 | $94k | 7% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.5") | 39,230 SY | $1.85 | $73k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $63,305 | $63k | 5% |
| 253E02000 PAVEMENT REPAIR (LONGITUDINAL) | 101 CY | $473 | $48k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 3% |
| 617E10100 COMPACTED AGGREGATE | 449 CY | $87 | $39k | 3% |
| 846E00111 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM, A | 59 CF | $600 | $35k | 3% |
| 253E02000 PAVEMENT REPAIR (TRANSVERSE) | 25 CY | $917 | $23k | 2% |