CLE-SR 125-15.11
CLE County · est $1.1M
Bid dateThursday, July 14—
CLE County · est $1.1M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 20 more items below.
| Item | Quantity | R1John R Jurgensen Company | R2Barrett Paving Materials INC | % of bid |
|---|---|---|---|---|
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 2,258 CY | $209 | $235 | 44% |
| 253E02000 PAVEMENT REPAIR | 550 CY | $528 | $400 | 27% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 54,185 SY | $2.18 | $3.50 | 11% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $8,500 | 4% |
| 407E20000 NON-TRACKING TACK COAT | 3,252 GAL | $10.00 | $4.00 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $21,055 | $40,000 | 2% |
| 644E00104 EDGE LINE, 6" | 5.04 MILE | $3,900 | $3,935 | 2% |
| 617E10100 COMPACTED AGGREGATE | 87 CY | $166 |
| Item | Quantity | R1John R Jurgensen Company | R2Barrett Paving Materials INC |
|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 2.6 SY | $166 | $135 |
| 202E30000 WALK REMOVED | 108 SF | $12.52 | $25.00 |
| 202E32000 CURB REMOVED | 9 FT | $108 | $70.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 6 EACH | $553 | $1,150 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 6 EACH | $524 | $800 |
| 617E20000 SHOULDER PREPARATION | 2,089 SY | $1.57 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $160 |
| 1% |
| 644E00300 CENTER LINE | 3.57 MILE | $3,468 | $5,500 | 1% |
| 618E43000 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE) | 0.72 MILE | $13,280 | $10,500 | 1% |
| 621E00100 RPM | 194 EACH | $38.15 | $40.00 | 1% |
| 608E52000 CURB RAMP | 132 SF | $51.77 | $55.00 | 1% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 3.57 MILE | $1,560 | $1,661 | 1% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $4,448 | $3,000 | 0% |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 223 EACH | $19.49 | $8.50 | 0% |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 5.04 MILE | $819 | $800 | 0% |
| 644E00631 CROSSWALK LINE, 24", AS PER PLAN | 560 FT | $6.65 | $6.00 | 0% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,415 | $3,275 | 0% |
| 254E01600 PATCHING PLANED SURFACE | 543 SY | $6.26 | $8.00 | 0% |
| 609E26000 CURB, TYPE 6 | 9 FT | $374 | $135 | 0% |
| $1.00 |
| 617E25000 WATER | 2 MGAL | $1,403 | $40.00 |
| 874E21000 LONGITUDINAL JOINT PREPARATION | 0.72 MILE | $3,038 | $5,200 |
| 644E00500 STOP LINE | 112 FT | $7.40 | $7.00 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 502 FT | $6.28 | $5.00 |
| 644E00900 ISLAND MARKING | 140 SF | $5.53 | $2.00 |
| 644E01110 SCHOOL SYMBOL MARKING, 96" | 2 EACH | $740 | $650 |
| 644E01200 PARKING LOT STALL MARKING | 575 FT | $2.95 | $2.00 |
| 644E01300 LANE ARROW | 6 EACH | $125 | $100 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 112 FT | $3.99 | $4.00 |
| 614E27261 WORK ZONE CROSSWALK LINE, CLASS III, 24", 642 PAIN | 560 FT | $4.00 | $2.00 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 6 EACH | $60.00 | $50.00 |
| 614E31750 WORK ZONE SCHOOL SYMBOL MARKING, 96", CLASS III, 6 | 2 EACH | $349 | $350 |
| 614E32800 WORK ZONE ISLAND MARKING, CLASS III, 642 PAINT | 140 SF | $2.80 | $1.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 2,258 CY | $209.47 | $473k | 43% |
| 253E02000 PAVEMENT REPAIR | 550 CY | $527.83 | $290k | 26% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 54,185 SY | $2.18 | $118k | 11% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 4% |
| 407E20000 NON-TRACKING TACK COAT | 3,252 GAL | $10 | $33k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $21,055 | $21k | 2% |
| 644E00104 EDGE LINE, 6" | 5.04 MILE | $3,900 | $20k | 2% |
| 617E10100 COMPACTED AGGREGATE | 87 CY | $166.45 | $14k | 1% |
| 644E00300 CENTER LINE | 3.57 MILE | $3,468 | $12k | 1% |
| 618E43000 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE) | 0.72 MILE | $13,280 | $10k | 1% |