CLE-East Fork WLF Resurfacing
CLE County · est $0.3M
Bid dateThursday, July 14—
CLE County · est $0.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 13 more items below.
| Item | Quantity | R1Fillmore Construction | R2Barrett Paving Materials INC | R3John R Jurgensen Company | % of bid |
|---|---|---|---|---|---|
| 302E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 330 CY | $240 | $250 | $190 | 26% |
| 823E40000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | 120 CY | $260 | $315 | $290 | 10% |
| 304E20000 AGGREGATE BASE | 234 CY | $100 | $110 | $74.00 | 8% |
| 659E00300 TOPSOIL | 286 CY | $80.00 | $75.00 | $90.00 | 7% |
| 203E10000 EXCAVATION | 734 CY | $30.00 | $45.00 | $80.00 | 7% |
| 823E41000 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 449 (88 CY | $240 | $275 | $285 | 7% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1" DEPTH | 1,623 SY | $10.00 | $10.00 |
| Item | Quantity | R1Fillmore Construction | R2Barrett Paving Materials INC | R3John R Jurgensen Company |
|---|---|---|---|---|
| 202E53010 SPECIAL - PARKING BLOCK REMOVED AND RESET | 9 EACH | $200 | $85.00 | $60.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.35 TON | $1,000 | $875 | $950 |
| 659E31000 LIME | 0.53 ACRE | $1,000 | $100 | $100 |
| 659E35000 WATER | 13.9 MGAL | $1.00 | $1.00 | $5.00 |
| 204E45000 PROOF ROLLING | 4 HOUR | $150 | $825 | $200 |
| 253E02000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $5.50 |
| 5% |
| 202E23000 PAVEMENT REMOVED | 1,849 SY | $7.00 | $9.00 | $5.50 | 4% |
| 660E25000 SODDING STAKED | 2,064 SY | $5.00 | $19.00 | $22.00 | 3% |
| 605E31100 AGGREGATE DRAINS | 460 FT | $20.00 | $20.00 | $20.00 | 3% |
| 659E10000 SEEDING AND MULCHING | 2,580 SY | $3.00 | $2.50 | $4.00 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,500 | $1,000 | $3,500 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $7,500 | $4,250 | $3,500 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $7,500 | $4,000 | $7,500 | 2% |
| 204E10000 SUBGRADE COMPACTION | 2,067 SY | $3.00 | $3.50 | $5.50 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $6,000 | $6,000 | $8,500 | 2% |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | 2% |
| 897E02000 PATCHING PLANED SURFACE | 17 SY | $200 | $9.00 | $50.00 | 1% |
| 203E20000 EMBANKMENT | 61 CY | $50.00 | $22.50 | $110 | 1% |
| 644E01200 PARKING LOT STALL MARKING | 1,385 FT | $2.00 | $1.75 | $1.00 | 1% |
| 2 CY |
| $500 |
| $600 |
| $475 |
| 407E10000 TACK COAT | 480 GAL | $5.00 | $4.00 | $4.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 2 EACH | $300 | $350 | $150 |
| 644E00100 EDGE LINE, 4" | 0.42 MILE | $4,500 | $4,214 | $8,000 |
| 644E00500 STOP LINE | 6 FT | $12.00 | $12.00 | $35.00 |
| 644E01300 LANE ARROW | 4 EACH | $125 | $125 | $310 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 0.42 MILE | $5,000 | $4,950 | $4,650 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 6 FT | $10.00 | $10.00 | $5.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 302E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 330 CY | $240 | $79k | 25% |
| 823E40000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | 120 CY | $260 | $31k | 10% |
| 304E20000 AGGREGATE BASE | 234 CY | $100 | $23k | 7% |
| 659E00300 TOPSOIL | 286 CY | $80 | $23k | 7% |
| 203E10000 EXCAVATION | 734 CY | $30 | $22k | 7% |
| 823E41000 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 449 (88 CY | $240 | $21k | 7% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1" DEPTH | 1,623 SY | $10 | $16k | 5% |
| 202E23000 PAVEMENT REMOVED | 1,849 SY | $7 | $13k | 4% |
| 660E25000 SODDING STAKED | 2,064 SY | $5 | $10k | 3% |
| 605E31100 AGGREGATE DRAINS | 460 FT | $20 | $9k | 3% |