HAM-US 42-03.29
HAM County · est $1.4M
Bid dateThursday, August 25—
HAM County · est $1.4M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 27 more items below.
| Item | Quantity | R1Prus Construction Company | R2Complete General Construction Company | R3Great Lakes Construction CO | % of bid |
|---|---|---|---|---|---|
| 511E71100 CONCRETE, MISC.: DECORATIVE PYLON CONCRETE | 180 CY | $2,860 | $3,000 | $3,520 | 34% |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 LS | $285,000 | $460,000 | $750,000 | 19% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $110,000 | $92,000 | $100,000 | 7% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 1,257 SY | $72.00 | $95.00 | $150 | 6% |
| 848E10201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 1,061 SY | $74.00 | $112 | $125 | 5% |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $56,250 | $60,000 | $75,000 | 4% |
| 514E00051 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL, |
| Item | Quantity | R1Prus Construction Company | R2Complete General Construction Company | R3Great Lakes Construction CO |
|---|---|---|---|---|
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $9,000 | $10,000 | $20,000 |
| 251E01011 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 4 CY | $1,050 | $4,800 | $3,500 |
| 625E00450 CONNECTION, FUSED PULL APART | 8 EACH | $102 | $450 | $125 |
| 625E23308 DISTRIBUTION CABLE, MISC.: NO. 8 AWG DISTRIBUTION | 396 FT | $2.00 | $13.00 | $3.14 |
| 625E25100 CONDUIT, 1", 725.04 | 92 FT | $28.17 | $125 | $28.17 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 4,313 SF |
| $11.60 |
| $40.00 |
| $11.59 |
| 3% |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 184 SF | $240 | $170 | $225 | 3% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 19,792 LB | $2.05 | $2.50 | $2.80 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $100,000 | $266,725 | 3% |
| 514E00067 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, AS P | 4,313 SF | $7.00 | $4.00 | $6.96 | 2% |
| 512E10051 SEALING OF CONCRETE SURFACES (NON-EPOXY), AS PER P | 2,316 SY | $12.50 | $12.75 | $12.50 | 2% |
| 514E00061 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 4,313 SF | $5.80 | $10.00 | $5.80 | 2% |
| 848E50320 EXISTING CONCRETE OVERLAY REMOVED (2" THICK) | 1,061 SY | $22.75 | $20.00 | $20.00 | 2% |
| 514E00057 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 4,313 SF | $4.64 | $10.00 | $4.64 | 1% |
| 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 8 EACH | $2,175 | $2,500 | $5,000 | 1% |
| 845E62000 FIELD METALLIZING OF EXISTING STRUCTURAL STEEL | 116 SF | $135 | $125 | $146 | 1% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 900 FT | $17.00 | $17.00 | $40.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $15,000 | $18,000 | $32,000 | 1% |
| 848E10201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 196 SY | $75.00 | $110 | $105 | 1% |
| 625E27521 REMOVAL OF LUMINAIRE AND REERECTION, AS PER PLAN | 4 EACH | $250 | $2,500 | $250 |
| 625E29920 STRUCTURE JUNCTION BOX | 4 EACH | $2,500 | $3,000 | $2,500 |
| 625E75800 DISCONNECT CIRCUIT | 4 EACH | $100 | $1,000 | $100 |
| 642E00200 LANE LINE, 4", TYPE 1 | 0.67 MILE | $4,670 | $4,670 | $4,670 |
| 642E00400 CHANNELIZING LINE, 8", TYPE 1 | 100 FT | $1.00 | $1.00 | $1.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 114 HOUR | $100 | $85.00 | $80.00 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,300 | $2,300 | $2,300 |
| 614E12420 DETOUR SIGNING | 1 LS | $8,510 | $10,000 | $10,000 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, 1WAY | 18 EACH | $15.00 | $15.00 | $15.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 18 EACH | $16.00 | $16.00 | $16.00 |
| 614E20200 WORK ZONE LANE LINE, CLASS I, 4", 740.06, TYPE I | 0.78 MILE | $3,500 | $3,500 | $3,500 |
| 614E22200 WORK ZONE EDGE LINE, CLASS I, 4", 740.06, TYPE I | 0.95 MILE | $6,900 | $6,900 | $6,900 |
| 614E23400 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 740.06, | 200 FT | $2.80 | $2.80 | $2.80 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 72 EACH | $90.00 | $40.00 | $40.00 |
| 516E10001 PREFORMED ELASTOMERIC COMPRESSION JOINT SEAL, AS P | 116 FT | $40.00 | $90.00 | $100 |
| 516E31001 JOINT SEALER, AS PER PLAN | 121 FT | $37.00 | $25.00 | $75.00 |
| 845E60000 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 116 SF | $29.00 | $15.00 | $129 |
| 845E61000 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 8 MNHR | $250 | $175 | $125 |
| 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE | 22 CY | $385 | $400 | $400 |
| 848E50000 HAND CHIPPING | 38 SY | $350 | $80.00 | $200 |
| 848E50100 TEST SLAB | 1 LS | $2,000 | $3,000 | $5,000 |
| 848E50340 REMOVAL OF DEBONDED OR DETERIORATED EXISTING VARIA | 319 SY | $18.50 | $39.00 | $10.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 511E71100 CONCRETE, MISC.: DECORATIVE PYLON CONCRETE | 180 CY | $2,860 | $515k | 32% |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 LS | $285,000 | $285k | 17% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $110,000 | $110k | 7% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 1,257 SY | $72 | $91k | 6% |
| 848E10201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 1,061 SY | $74 | $79k | 5% |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $56,250 | $56k | 3% |
| 514E00051 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL, | 4,313 SF | $11.6 | $50k | 3% |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 184 SF | $240 | $44k | 3% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 19,792 LB | $2.05 | $41k | 2% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 2% |