JEF-SR 7-19.21
JEF County · est $5.4M
Bid dateThursday, September 29—
JEF County · est $5.4M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 31 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Nls Paving, INC | % of bid |
|---|---|---|---|---|
| 442E10351 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE B ( | 14,168 CY | $202 | $260 | 64% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN (1 | 339,653 SY | $1.15 | $1.85 | 9% |
| 807E12010 WET REFLECTIVE EPOXY PAVEMENT MARKING, EDGE LINE, | 34.14 MILE | $4,485 | $4,485 | 3% |
| 255E10011 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 300 SY | $450 | $360 | 3% |
| 850E10010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $2,675 | $2,675 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $200,000 | 2% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $88,000 | $205,000 | 2% |
| 407E20000 |
| Item | Quantity | R1Shelly & Sands INC | R2Nls Paving, INC |
|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,500 | $15,000 |
| 202E30000 WALK REMOVED | 110 SF | $7.00 | $10.00 |
| 607E98000 FENCE, MISC.: TEMPORARY ORANGE PLASTIC CONSTRUCTIO | 121 FT | $5.00 | $1.00 |
| 608E52000 CURB RAMP | 110 SF | $65.00 | $50.00 |
| 659E98000 SEEDING, MISC.: CURB RAMP GRADING RESTORATION | 3 SY | $500 | $50.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 1,000 FT | $5.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 28,870 GAL |
| $3.00 |
| $3.00 |
| 2% |
| 614E22056 WORK ZONE EDGE LINE, CLASS I, 6", 807 PAINT | 34.14 MILE | $2,300 | $2,440 | 2% |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 9,255 CY | $8.00 | $10.00 | 2% |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 66 SNMT | $850 | $850 | 1% |
| 251E01010 PARTIAL DEPTH PAVEMENT REPAIR (441) | 100 CY | $553 | $500 | 1% |
| 254E01600 PATCHING PLANED SURFACE | 10,191 SY | $4.00 | $4.00 | 1% |
| 807E12110 WET REFLECTIVE EPOXY PAVEMENT MARKING, LANE LINE, | 15.4 MILE | $2,620 | $2,620 | 1% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 942 CY | $42.00 | $80.00 | 1% |
| 408E10001 PRIME COAT, AS PER PLAN | 8,960 GAL | $4.00 | $5.00 | 1% |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 34.14 MILE | $950 | $965 | 1% |
| 621E00100 RPM | 1,000 EACH | $32.00 | $32.00 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 250 HOUR | $85.00 | $90.00 | 0% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $19,251 | $30,087 | 0% |
| $6.00 |
| 617E20000 SHOULDER PREPARATION | 22,397 SY | $0.25 | $0.25 |
| 618E40100 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 73,550 FT | $0.16 | $0.31 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 1,000 EACH | $5.00 | $7.00 |
| 646E10200 CENTER LINE | 0.09 MILE | $25,000 | $25,000 |
| 646E10400 STOP LINE | 293 FT | $14.30 | $14.30 |
| 646E10800 ISLAND MARKING | 110 SF | $9.25 | $9.25 |
| 646E20300 LANE ARROW | 1 EACH | $210 | $210 |
| 646E20320 WRONG WAY ARROW | 16 EACH | $301 | $301 |
| 807E12310 WET REFLECTIVE EPOXY PAVEMENT MARKING, CHANNELIZIN | 6,686 FT | $2.85 | $2.85 |
| 807E12410 WET REFLECTIVE EPOXY PAVEMENT MARKING, DOTTED LINE | 11,465 FT | $1.55 | $1.55 |
| 850E10110 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $1.50 | $1.50 |
| 850E10130 GROOVING FOR 12" RECESSED PAVEMENT MARKING | — | $2.00 | $2.00 |
| 614E12460 WORK ZONE MARKING SIGN | 9 EACH | $90.00 | $90.00 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 24 EACH | $90.00 | $90.00 |
| 614E12500 REPLACEMENT SIGN | 5 EACH | $120 | $120 |
| 614E12600 REPLACEMENT DRUM | 10 EACH | $80.00 | $80.00 |
| 614E20056 WORK ZONE LANE LINE, CLASS I, 6", 807 PAINT | 15.4 MILE | $975 | $1,085 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 15.4 MILE | $625 | $665 |
| 614E23110 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 807 PAI | 6,686 FT | $0.96 | $1.05 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 6,686 FT | $0.65 | $0.75 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 293 FT | $6.00 | $6.00 |
| 519E11100 PATCHING CONCRETE STRUCTURE | 50 SF | $200 | $200 |
| 619E16010 FIELD OFFICE, TYPE B | 5 MNTH | $2,000 | $3,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $15,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10351 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE B ( | 14,168 CY | $202 | $2.86M | 61% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN (1 | 339,653 SY | $1.15 | $391k | 8% |
| 807E12010 WET REFLECTIVE EPOXY PAVEMENT MARKING, EDGE LINE, | 34.14 MILE | $4,485 | $153k | 3% |
| 255E10011 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 300 SY | $450 | $135k | 3% |
| 850E10010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $2,675 | $133k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 2% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $88,000 | $88k | 2% |
| 407E20000 NON-TRACKING TACK COAT | 28,870 GAL | $3 | $87k | 2% |
| 614E22056 WORK ZONE EDGE LINE, CLASS I, 6", 807 PAINT | 34.14 MILE | $2,300 | $79k | 2% |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 9,255 CY | $8 | $74k | 2% |