NOB-IR 77-04.75
NOB County · est $0.5M
Bid dateThursday, September 29—
NOB County · est $0.5M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 15 more items below.
| Item | Quantity | R1I V S Hydro INC | R2Complete General Construction Company | R3Shelly & Sands INC | R4Bcc Ohio INC | % of bid |
|---|---|---|---|---|---|---|
| 622E41100 PORTABLE BARRIER, UNANCHORED | 2,568 FT | $33.00 | $20.00 | $13.00 | $22.53 | 20% |
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 662 SY | $75.00 | $95.00 | $125 | $160 | 12% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 662 SY | $70.00 | $85.00 | $90.00 | $69.79 | 11% |
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 451 SY | $75.00 | $95.00 | $125 | $195 | 8% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 451 SY | $70.00 | $85.00 | $105 | $102 | 7% |
| 442E22100 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 43 CY | $600 | $600 | $600 |
| Item | Quantity | R1I V S Hydro INC | R2Complete General Construction Company | R3Shelly & Sands INC | R4Bcc Ohio INC |
|---|---|---|---|---|---|
| 407E20000 NON-TRACKING TACK COAT | 93 GAL | $4.00 | $3.30 | $3.30 | $4.20 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 2.34 MILE | $1,600 | $1,575 | $1,700 | $1,654 |
| 642E00204 LANE LINE, 6", TYPE 1 | 1.17 MILE | $850 | $820 | $880 | $861 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, 1 WAY | 132 EACH | $20.00 | $16.00 | $12.00 | $16.80 |
| 614E13312 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $788 |
| 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $25,000 | $16,000 | $33,500 | $70,845 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $22,000 | $10,000 | $20,000 | $40,950 | 5% |
| 848E30100 LATEX MODIFIED CONCRETE OVERLAY (VARIABLE THICKNES | 18.3 CY | $890 | $800 | $800 | $1,103 | 4% |
| 848E50320 EXISTING CONCRETE OVERLAY REMOVED , 2 1/4" NOMIN | 662 SY | $20.00 | $15.00 | $20.00 | $12.05 | 3% |
| 848E30100 LATEX MODIFIED CONCRETE OVERLAY (VARIABLE THICKNES | 12.5 CY | $890 | $800 | $800 | $1,103 | 3% |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,500 | $2,320 | $2,400 | $2,072 | 2% |
| 618E40100 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 4,763 FT | $2.00 | $12.00 | $2.00 | $1.34 | 2% |
| 848E50320 EXISTING CONCRETE OVERLAY REMOVED, 2 1/4" NOMINAL | 451 SY | $20.00 | $15.00 | $20.00 | $17.69 | 2% |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 6 EACH | $1,500 | $30.00 | $20.00 | $15.75 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, ( T = 1 1/2" ) | 1,032 SY | $7.00 | $12.50 | $10.75 | $21.00 | 2% |
| 848E50200 FULL-DEPTH REPAIR | 10.5 CY | $605 | $800 | $750 | $1,425 | 1% |
| 848E50200 FULL-DEPTH REPAIR | 10.5 CY | $605 | $800 | $750 | $1,425 | 1% |
| 614E13350 OBJECT MARKER, ONE WAY, 1 WAY | 194 EACH | $28.00 | $28.00 | $30.00 | $29.40 | 1% |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 4.02 MILE | $1,350 | $1,350 | $1,448 | $1,418 | 1% |
| 62 EACH |
| $35.00 |
| $30.00 |
| $32.00 |
| $31.50 |
| 614E24000 WORK ZONE DOTTED LINE, CLASS I | 4,480 FT | $1.00 | $0.75 | $1.00 | $0.79 |
| 509E20001 CONCRETE REINFORCEMENT, REPLACEMENT OF EXISTING CO | 100 LB | $5.00 | $3.00 | $1.00 | $6.56 |
| 516E31250 SPECIAL - SAWING AND SEALING CONCRETE JOINTS | 80 FT | $22.00 | $35.00 | $50.00 | $15.53 |
| 848E50000 HAND CHIPPING | 100 SY | $35.00 | $50.00 | $50.00 | $155 |
| 848E50100 TEST SLAB | 1 LS | $1,000 | $500 | $3,500 | $5,085 |
| 509E20001 CONCRETE REINFORCEMENT, REPLACEMENT OF EXISTING CO | 100 LB | $5.00 | $6.00 | $1.00 | $6.56 |
| 516E31250 SPECIAL - SAWING AND SEALING CONCRETE JOINTS | 80 FT | $22.00 | $35.00 | $50.00 | $15.53 |
| 848E50000 HAND CHIPPING | 68 SY | $35.00 | $50.00 | $50.00 | $155 |
| 848E50100 TEST SLAB | 1 LS | $1,000 | $500 | $3,500 | $5,085 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,000 | $5,000 | $5,999 | $8,382 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 622E41100 PORTABLE BARRIER, UNANCHORED | 2,568 FT | $33 | $85k | 18% |
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 662 SY | $75 | $50k | 11% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 662 SY | $70 | $46k | 10% |
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 451 SY | $75 | $34k | 7% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 451 SY | $70 | $32k | 7% |
| 442E22100 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 43 CY | $600 | $26k | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $25,000 | $25k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $22,000 | $22k | 5% |
| 848E30100 LATEX MODIFIED CONCRETE OVERLAY (VARIABLE THICKNES | 18.3 CY | $890 | $16k | 4% |
| 848E50320 EXISTING CONCRETE OVERLAY REMOVED , 2 1/4" NOMIN | 662 SY | $20 | $13k | 3% |