CUY-US 422-18.74/VAR Slide
CUY County · est $1.1M
Bid dateThursday, September 29—
CUY County · est $1.1M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 57 more items below.
| Item | Quantity | R1Great Lakes Construction CO | R2Tucson INC | R3Rudzik Excavating INC | R4Shelly & Sands INC | R5Eclipse CO LLC | R6Tri-mor CORP | R7Marucci & Gaffney Excavating CO | R8Mark Schaffer Excavating & Trucking INC | R9Mike Pusateri Excavating INC | R10Anthony Allega Cement Contractor INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 203E20000 EMBANKMENT | 13,922 CY | $11.00 | $11.00 | $10.50 | $18.00 | $17.00 | $22.00 | $26.00 | $13.50 | $24.00 | $25.95 | 22% |
| Item | Quantity | R1Great Lakes Construction CO | R2Tucson INC | R3Rudzik Excavating INC | R4Shelly & Sands INC | R5Eclipse CO LLC | R6Tri-mor CORP | R7Marucci & Gaffney Excavating CO | R8Mark Schaffer Excavating & Trucking INC | R9Mike Pusateri Excavating INC | R10Anthony Allega Cement Contractor INC |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 202E20010 HEADWALL REMOVED | 3 EACH | $350 | $330 | $370 | $520 | $250 | $608 | $706 | $1,000 | $250 | $859 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 203E10000 EXCAVATION |
| 12,252 CY |
| $9.50 |
| $10.00 |
| $8.00 |
| $9.00 |
| $14.00 |
| $13.50 |
| $22.00 |
| $20.00 |
| $16.05 |
| $20.68 |
| 17% |
| 305E13010 9" CONCRETE BASE, CLASS QC 1P | 643 SY | $95.00 | $88.75 | $96.00 | $75.00 | $82.76 | $110 | $105 | $100 | $125 | $95.54 | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $45,400 | $35,500 | $38,025 | $20,000 | $36,000 | $38,000 | $60,000 | $100,000 | $35,600 | $78,227 | 7% |
| 624E10000 MOBILIZATION | 1 LS | $45,200 | $28,000 | $55,895 | $20,000 | $15,328 | $30,000 | $40,000 | $40,000 | $48,620 | $40,000 | 7% |
| 832E30000 EROSION CONTROL | 30,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 4% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (72 CY | $365 | $395 | $400 | $225 | $378 | $405 | $365 | $400 | $535 | $420 | 4% |
| 611E06701 15" CONDUIT, TYPE F, AS PER PLAN, 707.05 TYPE C OR | 242 FT | $105 | $148 | $135 | $117 | $81.00 | $150 | $121 | $175 | $129 | $171 | 4% |
| 618E40101 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE), AS PER | 1,210 FT | $21.00 | $19.00 | $22.00 | $23.00 | $10.00 | $20.00 | $22.00 | $20.00 | $20.70 | $25.05 | 4% |
| 659E00300 TOPSOIL | 735 CY | $33.00 | $33.00 | $28.00 | $40.00 | $89.00 | $35.00 | $35.34 | $20.00 | $36.00 | $22.25 | 4% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $20,000 | $11,500 | $8,102 | $22,700 | $8,000 | $11,000 | $9,700 | $15,000 | $17,640 | $47,104 | 3% |
| 622E41110 PORTABLE BARRIER, ANCHORED | 524 FT | $28.00 | $48.00 | $97.50 | $46.00 | $69.00 | $45.00 | $28.00 | $75.00 | $57.50 | $62.54 | 2% |
| 441E70101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), AS | 31 CY | $445 | $480 | $490 | $396 | $378 | $500 | $445 | $500 | $1,038 | $512 | 2% |
| 203E35000 GRANULAR EMBANKMENT | 100 CY | $130 | $95.00 | $75.00 | $65.00 | $52.00 | $180 | $73.87 | $100 | $42.00 | $126 | 2% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 486 FT | $26.00 | $46.00 | $73.00 | $31.00 | $57.00 | $35.00 | $25.00 | $70.00 | $52.90 | $56.54 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $12,500 | $10,500 | $20,000 | $50,000 | $29,419 | $30,000 | $12,500 | $50,000 | $68,550 | $35,798 | 2% |
| 619E16010 FIELD OFFICE, TYPE B | 5 MNTH | $2,500 | $2,050 | $1,400 | $2,900 | $684 | $2,800 | $1,707 | $1,400 | $2,800 | $5,230 | 2% |
| 304E20000 AGGREGATE BASE | 98 CY | $122 | $105 | $75.00 | $103 | $85.00 | $140 | $89.21 | $125 | $108 | $94.85 | 2% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 525 FT | $22.20 | $24.00 | $25.00 | $24.00 | $23.78 | $25.00 | $22.20 | $25.00 | $25.53 | $26.32 | 2% |
| 202E23000 PAVEMENT REMOVED | 883 SY | $11.20 | $28.00 | $15.00 | $9.00 | $18.00 | $30.00 | $10.26 | $50.00 | $9.00 | $38.21 | 1% |
| 202E32000 CURB REMOVED | 138 FT | $3.20 | $5.50 | $3.00 | $4.00 | $9.00 | $14.00 | $10.99 | $15.00 | $10.00 | $4.50 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 179 FT | $16.00 | $7.00 | $10.00 | $11.00 | $20.00 | $16.00 | $16.95 | $30.00 | $14.00 | $33.21 |
| 202E35200 PIPE REMOVED, OVER 24" | 15 FT | $85.00 | $11.00 | $15.00 | $26.00 | $37.00 | $145 | $50.57 | $50.00 | $18.00 | $57.24 |
| 202E38000 GUARDRAIL REMOVED | 887.5 FT | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 | $1.80 | $3.00 | $2.05 | $2.13 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 2 EACH | $55.00 | $60.00 | $61.00 | $60.00 | $71.00 | $65.00 | $55.00 | $100 | $63.25 | $65.20 |
| 202E47801 IMPACT ATTENUATOR REMOVED, AS PER PLAN | 1 EACH | $860 | $865 | $385 | $376 | $349 | $400 | $350 | $500 | $403 | $1,012 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $350 | $325 | $400 | $394 | $474 | $400 | $321 | $1,000 | $300 | $859 |
| 202E75000 FENCE REMOVED | 251 FT | $2.60 | $5.00 | $3.00 | $11.00 | $3.00 | $5.00 | $2.60 | $15.00 | $3.00 | $3.35 |
| 202E98200 REMOVAL MISC.: PORTABLE CONCRETE BARRIER | 270 FT | $7.90 | $24.00 | $16.00 | $10.00 | $16.00 | $40.00 | $25.16 | $20.00 | $19.85 | $16.03 |
| 204E10000 SUBGRADE COMPACTION | 662 SY | $2.30 | $2.00 | $2.00 | $6.00 | $2.00 | $4.00 | $3.77 | $5.00 | $2.00 | $2.76 |
| 209E60201 LINEAR GRADING, AS PER PLAN | 10 STA | $40.00 | $43.00 | $300 | $195 | $47.34 | $380 | $506 | $1,500 | $46.00 | $451 |
| 606E15050 GUARDRAIL, TYPE MGS | 362.5 FT | $21.00 | $22.00 | $23.00 | $23.00 | $22.52 | $25.00 | $20.60 | $23.00 | $23.69 | $24.42 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 1 EACH | $2,960 | $3,200 | $3,300 | $3,200 | $3,249 | $3,300 | $2,960 | $3,500 | $3,404 | $3,509 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 1 EACH | $520 | $1,050 | $572 | $560 | $60.00 | $600 | $520 | $600 | $598 | $616 |
| 607E23000 FENCE, TYPE CLT | 251 FT | $27.40 | $31.50 | $35.00 | $44.00 | $30.73 | $35.00 | $27.40 | $30.00 | $31.51 | $35.28 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 14 SY | $200 | $330 | $290 | $202 | $194 | $200 | $226 | $150 | $399 | $141 |
| 601E32205 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 3 CY | $360 | $500 | $284 | $382 | $496 | $180 | $329 | $400 | $415 | $1,262 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $25.00 | $290 | $125 | $105 | $26.00 | $300 | $68.32 | $50.00 | $500 | $345 |
| 659E00530 SEEDING AND MULCHING, CLASS 3B | 6,624 SY | $1.30 | $2.00 | $1.85 | $1.30 | $1.00 | $2.15 | $1.95 | $2.00 | $2.25 | $1.44 |
| 659E14000 REPAIR SEEDING AND MULCHING | 331 SY | $1.30 | $1.50 | $2.00 | $1.00 | $1.00 | $1.00 | $0.80 | $1.00 | $0.92 | $1.15 |
| 659E15000 INTER-SEEDING | 331 SY | $0.10 | $1.50 | $0.50 | $1.00 | $0.10 | $1.00 | $0.10 | $0.20 | $0.12 | $0.29 |
| 659E20000 COMMERCIAL FERTILIZER | 0.92 TON | $300 | $1,975 | $1,000 | $990 | $313 | $1,010 | $910 | $1,000 | $1,047 | $1,380 |
| 659E31000 LIME | 1.37 ACRE | $25.00 | $125 | $50.00 | $170 | $26.00 | $33.50 | $30.00 | $30.00 | $34.50 | $11.50 |
| 659E35000 WATER | 37 MGAL | $0.10 | $11.00 | $0.50 | $2.00 | $0.10 | $25.00 | $1.00 | $1.00 | $2.00 | $2.30 |
| 602E20000 CONCRETE MASONRY | 1.5 CY | $2,890 | $2,125 | $2,630 | $3,300 | $1,452 | $2,200 | $2,627 | $5,000 | $2,240 | $1,759 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 725 FT | $11.00 | $15.00 | $32.00 | $20.00 | $23.00 | $20.00 | $20.00 | $20.00 | $26.00 | $27.23 |
| 605E14000 6" BASE PIPE UNDERDRAINS | 365 FT | $17.00 | $15.50 | $31.00 | $20.00 | $22.00 | $20.00 | $14.79 | $20.00 | $27.85 | $17.49 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 112 FT | $32.00 | $30.00 | $40.00 | $32.00 | $33.00 | $16.00 | $15.61 | $40.00 | $30.25 | $48.52 |
| 611E01500 6" CONDUIT, TYPE F | 100 FT | $16.00 | $30.00 | $40.00 | $18.00 | $22.00 | $42.00 | $14.70 | $40.00 | $30.25 | $34.29 |
| 611E05900 15" CONDUIT, TYPE B, 707.12 | 5 FT | $300 | $310 | $340 | $514 | $400 | $150 | $192 | $900 | $200 | $896 |
| 611E13200 30" CONDUIT, TYPE A, 706.02 | 29 FT | $340 | $363 | $350 | $328 | $287 | $650 | $300 | $250 | $281 | $424 |
| 611E98180 CATCH BASIN, NO. 3A | 2 EACH | $4,150 | $4,150 | $3,575 | $3,700 | $3,862 | $4,215 | $3,500 | $4,000 | $4,760 | $6,314 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 7 EACH | $125 | $365 | $460 | $420 | $254 | $400 | $150 | $500 | $375 | $380 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (VARIES 4" TO 6 | 112 SY | $40.00 | $43.00 | $44.00 | $88.00 | $65.53 | $45.00 | $40.00 | $50.00 | $52.90 | $46.00 |
| 407E10000 TACK COAT | 132 GAL | $4.00 | $4.25 | $5.00 | $3.00 | $8.07 | $5.00 | $4.00 | $5.00 | $5.75 | $4.60 |
| 441E70801 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 449 (21 CY | $450 | $486 | $495 | $455 | $554 | $500 | $450 | $500 | $1,283 | $518 |
| 609E10000 ASPHALT CONCRETE CURB, TYPE 1 | 452 FT | $20.00 | $22.00 | $22.00 | $20.00 | $18.15 | $22.50 | $20.00 | $25.00 | $25.30 | $23.00 |
| 625E31510 PULL BOX REMOVED | 2 EACH | $500 | $303 | $500 | $518 | $52.00 | $1,220 | $414 | $600 | $1,200 | $859 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, 1WAY | 10 EACH | $11.00 | $12.00 | $13.00 | $13.00 | $13.00 | $12.00 | $11.00 | $15.00 | $12.65 | $13.80 |
| 630E08000 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W12X30 | 60.6 FT | $96.00 | $105 | $106 | $103 | $135 | $135 | $96.00 | $100 | $132 | $132 |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 2 EACH | $1,150 | $1,245 | $1,265 | $1,240 | $1,622 | $1,475 | $1,150 | $1,200 | $1,466 | $1,466 |
| 630E85600 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND REERECTIO | 1 EACH | $650 | $700 | $715 | $700 | $917 | $400 | $650 | $675 | $386 | $386 |
| 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT | 2 EACH | $350 | $380 | $385 | $376 | $494 | $400 | $350 | $375 | $339 | $339 |
| 646E10010 EDGE LINE, 6" | 0.46 MILE | $16,755 | $18,000 | $18,500 | $18,000 | $22,801 | $16,600 | $16,755 | $17,000 | $19,268 | $19,268 |
| 646E10110 LANE LINE, 6" | 0.34 MILE | $7,860 | $8,500 | $8,700 | $8,500 | $10,696 | $16,600 | $7,860 | $8,000 | $9,039 | $9,039 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 48 HOUR | $75.00 | $85.00 | $80.00 | $81.00 | $68.00 | $150 | $80.00 | $150 | $175 | $93.15 |
| 614E11630 INCREASED BARRIER DELINEATION | 1,010 FT | $3.25 | $3.50 | $3.60 | $4.00 | $5.00 | $2.50 | $3.25 | $3.50 | $3.75 | $3.74 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,800 | $2,375 | $2,920 | $2,400 | $3,103 | $2,800 | $2,200 | $2,500 | $2,860 | $2,940 |
| 614E12800 WORK ZONE RAISED PAVEMENT MARKER | 42 EACH | $6.00 | $6.50 | $7.00 | $7.00 | $8.00 | $75.00 | $37.50 | $6.50 | $6.90 | $6.90 |
| 614E12801 WORK ZONE RAISED PAVEMENT MARKER, AS PER PLAN | 231 EACH | $6.00 | $6.50 | $7.00 | $7.00 | $8.00 | $75.00 | $37.50 | $6.50 | $54.45 | $54.45 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, ONE-WAY | 21 EACH | $16.00 | $17.00 | $18.00 | $24.00 | $23.00 | $35.00 | $16.00 | $20.00 | $18.40 | $18.40 |
| 614E13350 OBJECT MARKER, ONE WAY | 21 EACH | $17.00 | $18.00 | $19.00 | $29.00 | $24.00 | $45.00 | $17.00 | $20.00 | $19.55 | $19.55 |
| 614E22056 WORK ZONE EDGE LINE, CLASS I, 6", 807 PAINT | 0.46 MILE | $4,595 | $5,000 | $5,100 | $5,000 | $6,481 | $6,800 | $4,595 | $5,000 | $5,284 | $5,284 |
| 614E23110 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 807 PAI | 1,810 FT | $1.60 | $1.75 | $2.00 | $2.00 | $2.00 | $5.00 | $1.60 | $1.75 | $1.84 | $1.84 |
| 616E10000 WATER | 48 MGAL | $20.00 | $11.50 | $1.00 | $55.00 | $28.00 | $200 | $14.23 | $1.00 | $2.00 | $177 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,500 | $12,075 | $9,450 | $5,400 | $15,000 | $12,000 | $10,000 | $15,000 | $15,625 | $16,763 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 203E20000 EMBANKMENT | 13,922 CY | $11 | $153k | 18% |
| 203E10000 EXCAVATION | 12,252 CY | $9.5 | $116k | 14% |
| 305E13010 9" CONCRETE BASE, CLASS QC 1P | 643 SY | $95 | $61k | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $45,400 | $45k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $45,200 | $45k | 5% |
| 832E30000 EROSION CONTROL | 30,000 EACH | $1 | $30k | 4% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (72 CY | $365 | $26k | 3% |
| 611E06701 15" CONDUIT, TYPE F, AS PER PLAN, 707.05 TYPE C OR | 242 FT | $105 | $25k | 3% |
| 618E40101 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE), AS PER | 1,210 FT | $21 | $25k | 3% |
| 659E00300 TOPSOIL | 735 CY | $33 | $24k | 3% |