ALL-/HAN/WYA-SR 103/SR 117/SR 53-VAR.
ALL County · est $0.7M
Bid dateThursday, October 13—
ALL County · est $0.7M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 23 more items below.
| Item | Quantity | R1Helms And Sons Excavating | R2Bluffton Paving INC | R3Shelly Company | % of bid |
|---|---|---|---|---|---|
| 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS | 1,267 CY | $191 | $223 | $245 | 38% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1 1/4" THICKNE | 36,473 SY | $2.00 | $1.75 | $1.30 | 11% |
| 253E02000 PAVEMENT REPAIR | 225 CY | $257 | $276 | $379 | 9% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 114 CY | $310 | $223 | $450 | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $34,000 | $24,600 | $85,000 | 5% |
| 202E23500 WEARING COURSE REMOVED | 3,273 SY | $10.00 | $10.00 | $7.50 | 5% |
| 423E00100 CRACK SEALING, TYPE I | 14,724 LB | $2.00 |
| Item | Quantity | R1Helms And Sons Excavating | R2Bluffton Paving INC | R3Shelly Company |
|---|---|---|---|---|
| 202E32000 CURB REMOVED | 88 FT | $13.00 | $10.00 | $10.50 |
| 202E32500 CURB AND GUTTER REMOVED | 38 FT | $30.00 | $10.00 | $11.00 |
| 608E10000 4" CONCRETE WALK | 32 SF | $42.00 | $17.00 | $20.00 |
| 608E53020 DETECTABLE WARNING | 10 SF | $64.00 | $25.00 | $35.00 |
| 609E26000 CURB, TYPE 6 | 27 FT | $80.00 | $35.00 | $30.00 |
| 609E31000 COMBINATION CURB AND GUTTER, TYPE 9 | 24 FT |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $5.20 |
| $2.15 |
| 5% |
| 642E00300 CENTER LINE, TYPE 1 | 16.62 MILE | $1,200 | $1,000 | $1,200 | 3% |
| 618E43000 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE) | 14.6 MILE | $1,350 | $1,350 | $1,300 | 3% |
| 608E52000 CURB RAMP | 700 SF | $24.00 | $17.00 | $20.00 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $15,000 | $20,000 | $20,000 | 2% |
| 643E50200 PAVEMENT MARKING, MISC.: NO PARKING ZONE MARKING | 910 FT | $11.00 | $4.00 | $2.56 | 2% |
| 643E01200 PARKING LOT STALL MARKING | 3,288 FT | $3.00 | $2.50 | $2.56 | 2% |
| 407E20000 NON-TRACKING TACK COAT | 3,378 GAL | $2.50 | $1.75 | $2.95 | 1% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 139 CY | $56.00 | $55.00 | $95.00 | 1% |
| 614E21400 WORK ZONE CENTER LINE, CLASS II | 4.04 MILE | $1,500 | $1,500 | $1,500 | 1% |
| 643E00630 CROSSWALK LINE, 24" | 742 FT | $7.00 | $10.00 | $8.55 | 1% |
| 202E30000 WALK REMOVED | 1,031 SF | $5.00 | $3.00 | $4.45 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,001 | $6,000 | $5,000 | 1% |
| 643E00500 STOP LINE | 483 FT | $8.50 | $9.00 | $8.55 | 1% |
| $100 |
| $35.00 |
| $35.00 |
| 659E00300 TOPSOIL | 3 CY | $450 | $150 | $150 |
| 659E10000 SEEDING AND MULCHING | 49 SY | $12.00 | $20.00 | $8.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.18 TON | $400 | $1,000 | $500 |
| 659E35000 WATER | 0.26 MGAL | $0.96 | $1.00 | $50.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 |
| 254E01600 PATCHING PLANED SURFACE | 725 SY | $4.00 | $4.00 | $7.75 |
| 304E20000 AGGREGATE BASE | 15 CY | $100 | $10.00 | $200 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 1,943 LB | $2.00 | $1.50 | $1.95 |
| 621E00100 RPM | 53 EACH | $65.00 | $65.00 | $93.50 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 53 EACH | $6.00 | $6.00 | $15.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 2.48 MILE | $1,050 | $900 | $1,000 |
| 643E00620 CROSSWALK LINE, 12" | 291 FT | $3.50 | $5.00 | $4.26 |
| 643E01100 SCHOOL SYMBOL MARKING, 72" | 2 EACH | $840 | $1,000 | $855 |
| 643E01600 HANDICAP SYMBOL MARKING | 1 EACH | $740 | $500 | $214 |
| 643E20802 YIELD LINE | 66 FT | $21.00 | $15.00 | $18.00 |
| 614E12460 WORK ZONE MARKING SIGN | 30 EACH | $100 | $100 | $100 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 2.02 MILE | $1,500 | $1,500 | $1,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS | 1,267 CY | $191 | $242k | 36% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1 1/4" THICKNE | 36,473 SY | $2 | $73k | 11% |
| 253E02000 PAVEMENT REPAIR | 225 CY | $257 | $58k | 9% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 114 CY | $310 | $35k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $34,000 | $34k | 5% |
| 202E23500 WEARING COURSE REMOVED | 3,273 SY | $10 | $33k | 5% |
| 423E00100 CRACK SEALING, TYPE I | 14,724 LB | $2 | $29k | 4% |
| 642E00300 CENTER LINE, TYPE 1 | 16.62 MILE | $1,200 | $20k | 3% |
| 618E43000 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE) | 14.6 MILE | $1,350 | $20k | 3% |
| 608E52000 CURB RAMP | 700 SF | $24 | $17k | 2% |