| Item | Quantity | R1Bcc Ohio INC | R2Shelly & Sands INC | R3Complete General Construction Company | % of bid |
|---|---|---|---|---|---|
| 517E75601 DEEP BEAM BRIDGE RETROFIT RAILING, AS PER PLAN | 800 FT | $135 | $120 | $129 | 13% |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 750 FT | $135 | $125 | $129 | 12% |
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 1,551 SY | $62.70 | $67.00 | $60.00 | 12% |
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 1,389 SY | $62.82 | $80.00 | $60.00 | 11% |
| 848E20001 SURFACE PREPARATION USING HYDRODEMOLITION, AS PER | 1,551 SY | $49.23 | $110 | $80.00 | 9% |
| 848E20001 SURFACE PREPARATION USING HYDRODEMOLITION, AS PER | 1,389 SY | $50.96 | $120 | $80.00 | 9% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG |
| Item | Quantity | R1Bcc Ohio INC | R2Shelly & Sands INC | R3Complete General Construction Company |
|---|---|---|---|---|
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 4 EACH | $68.25 | $80.00 | $475 |
| 606E35141 BRIDGE TERMINAL ASSEMBLY, TYPE 4, AS PER PLAN | 4 EACH | $1,407 | $1,176 | $1,340 |
| 621E00100 RPM | 4 EACH | $257 | $225 | $275 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 4 EACH | $18.00 | $13.00 | $50.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 12 EACH | $12.08 | $10.00 | $11.50 |
| 646E10010 EDGE LINE, 6" |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 100 CY |
| $420 |
| $325 |
| $325 |
| 5% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 100 CY | $420 | $325 | $325 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $38,469 | $40,000 | $40,000 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $20,910 | $12,000 | $30,000 | 3% |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 977 FT | $16.45 | $14.00 | $19.00 | 2% |
| 617E10100 COMPACTED AGGREGATE | 100 CY | $158 | $100 | $140 | 2% |
| 617E10100 COMPACTED AGGREGATE | 100 CY | $158 | $110 | $140 | 2% |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 909 FT | $16.49 | $15.00 | $13.50 | 2% |
| 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE | 30 CY | $450 | $245 | $248 | 2% |
| 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE | 28 CY | $450 | $250 | $248 | 2% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 25 CY | $488 | $365 | $365 | 1% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 25 CY | $488 | $390 | $365 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $12,078 | $7,500 | $9,000 | 1% |
| 516E10011 ARMORLESS PREFORMED JOINT SEAL, AS PER PLAN | 74 FT | $160 | $147 | $145 | 1% |
| 0.16 MILE |
| $11,025 |
| $11,000 |
| $10,500 |
| 646E10200 CENTER LINE | 0.08 MILE | $18,848 | $20,000 | $17,950 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $6,930 | $10,000 | $60,000 |
| 202E23000 PAVEMENT REMOVED | 58 SY | $19.74 | $31.00 | $40.00 |
| 516E10011 ARMORLESS PREFORMED JOINT SEAL, AS PER PLAN | 56 FT | $159 | $150 | $145 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 25 SF | $138 | $150 | $180 |
| 530E00200 SPECIAL - STRUCTURES CLEAN ABUTMENT BRIDGE SEATS | 1 LS | $2,115 | $2,500 | $2,800 |
| 848E50000 HAND CHIPPING | 53 SY | $133 | $50.00 | $86.00 |
| 848E50100 TEST SLAB | 1 LS | $1,575 | $2,053 | $1,000 |
| 848E50200 FULL-DEPTH REPAIR | 2 CY | $1,575 | $1,083 | $1,600 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE DEPTH | 50 SY | $94.50 | $150 | $150 |
| 407E10000 TACK COAT | 50 GAL | $3.68 | $2.25 | $2.25 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 16 HOUR | $89.25 | $80.00 | $85.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $8,190 | $8,000 | $7,505 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 25 CY | $341 | $250 | $275 |
| 617E25000 WATER | 5 MGAL | $2.25 | $62.00 | $175 |
| 642E00300 CENTER LINE, TYPE 1 | 0.25 MILE | $945 | $950 | $900 |
| 202E38000 GUARDRAIL REMOVED | 397 FT | $2.10 | $2.50 | $2.00 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 2 EACH | $278 | $295 | $675 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 4 EACH | $68.25 | $80.00 | $475 |
| 203E20000 EMBANKMENT | 35 CY | $79.80 | $70.00 | $76.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 275 FT | $21.21 | $21.00 | $20.20 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (NCHRP 350 OR MASH 201 | 2 EACH | $2,961 | $2,600 | $2,820 |
| 606E35141 BRIDGE TERMINAL ASSEMBLY, TYPE 4, AS PER PLAN | 4 EACH | $1,407 | $1,180 | $1,340 |
| 659E00300 TOPSOIL | 44 CY | $76.50 | $65.00 | $45.00 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 399 SY | $3.88 | $10.00 | $9.25 |
| 659E14000 REPAIR SEEDING AND MULCHING | 20 SY | $1.42 | $1.00 | $9.25 |
| 659E15000 INTER-SEEDING | 20 SY | $0.16 | $1.00 | $9.25 |
| 659E20000 COMMERCIAL FERTILIZER | 0.05 TON | $1,313 | $80.00 | $1,400 |
| 659E31000 LIME | 0.08 ACRE | $105 | $17.00 | $80.00 |
| 659E35000 WATER | 2 MGAL | $1.05 | $2.00 | $1.00 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 |
| 621E00100 RPM | 20 EACH | $205 | $208 | $200 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 26 EACH | $18.00 | $16.00 | $35.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 18 EACH | $11.55 | $10.00 | $11.00 |
| 646E10010 EDGE LINE, 6" | 0.16 MILE | $11,025 | $10,500 | $10,500 |
| 646E10200 CENTER LINE | 0.08 MILE | $18,848 | $17,950 | $17,950 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE DEPTH | 50 SY | $94.50 | $150 | $150 |
| 407E10000 TACK COAT | 50 GAL | $3.68 | $2.50 | $2.25 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 16 HOUR | $89.25 | $80.00 | $85.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $8,190 | $8,000 | $7,605 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 25 CY | $341 | $267 | $275 |
| 617E25000 WATER | 5 MGAL | $2.25 | $60.00 | $195 |
| 642E00300 CENTER LINE, TYPE 1 | 0.25 MILE | $945 | $900 | $900 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $7,100 | $10,000 | $65,000 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 33 SF | $138 | $150 | $175 |
| 530E00200 SPECIAL - STRUCTURES CLEAN BRIDGE ABUTMENT SEATS | 1 LS | $2,325 | $3,000 | $2,800 |
| 848E50000 HAND CHIPPING | 51 SY | $133 | $75.00 | $86.00 |
| 848E50100 TEST SLAB | 1 LS | $1,575 | $2,000 | $1,000 |
| 848E50201 FULL DEPTH REPAIR, AS PER PLAN | 2 CY | $1,575 | $1,000 | $1,600 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 517E75601 DEEP BEAM BRIDGE RETROFIT RAILING, AS PER PLAN | 800 FT | $135.24 | $108k | 11% |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 750 FT | $135.24 | $101k | 10% |
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 1,551 SY | $62.7 | $97k | 10% |
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 1,389 SY | $62.82 | $87k | 9% |
| 848E20001 SURFACE PREPARATION USING HYDRODEMOLITION, AS PER | 1,551 SY | $49.23 | $76k | 8% |
| 848E20001 SURFACE PREPARATION USING HYDRODEMOLITION, AS PER | 1,389 SY | $50.96 | $71k | 7% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 100 CY | $420 | $42k | 4% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 100 CY | $420 | $42k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $38,469 | $38k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $20,910 | $21k | 2% |