Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5.0%
5.0%DBE GoalDBE = Disadvantaged Business Enterprise. Federal-USDOT program targeting at least this much of the contract's value with certified small businesses majority-owned by socially / economically disadvantaged individuals (49 CFR Part 26).
Project scope
Bid form · ODOT
Structures / Bridge71%
Maintaining Traffic13%
Mobilization & General10%
Earthwork3%
Signs3%
Top items by winning bid
Item
Qty
Unit price
Extended
%
614E11001MAINTAINING TRAFFIC, AS PER PLAN
1 LS
$80,000
$80k
Per-bidder unit pricing
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 11 more items below.
512E74000REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE
124 SY
$18.00
$18.60
512E10400TREATING OF CONCRETE BRIDGE DECK WITH SRS
529 SY
$6.30
$6.11
519E11100PATCHING CONCRETE STRUCTURE
13 SF
$90.00
$159
512E10400TREATING OF CONCRETE BRIDGE DECK WITH SRS
1,055 SY
$6.30
$6.11
512E10101SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), AS
21 SY
$54.00
Project details
Description
BUT-BS FY2023
Type of work
Bridge
DBE goal
500%
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
2,270 SY
$6.30
$6.11
4%
512E10400TREATING OF CONCRETE BRIDGE DECK WITH SRS
2,177 SY
$6.30
$6.11
4%
512E10400TREATING OF CONCRETE BRIDGE DECK WITH SRS
2,159 SY
$6.30
$6.11
4%
512E10400TREATING OF CONCRETE BRIDGE DECK WITH SRS
2,083 SY
$6.30
$6.11
4%
624E10000MOBILIZATION
1 LS
$12,000
$52,879
3%
512E10400TREATING OF CONCRETE BRIDGE DECK WITH SRS
1,846 SY
$6.30
$6.11
3%
512E10400TREATING OF CONCRETE BRIDGE DECK WITH SRS
1,594 SY
$6.30
$6.11
3%
512E10400TREATING OF CONCRETE BRIDGE DECK WITH SRS
1,594 SY
$6.30
$6.11
3%
614E18601PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN
24 SNMT
$400
$940
3%
512E10400TREATING OF CONCRETE BRIDGE DECK WITH SRS
1,371 SY
$6.30
$6.11
2%
512E10400TREATING OF CONCRETE BRIDGE DECK WITH SRS
1,371 SY
$6.30
$6.11
2%
512E10101SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), AS
124 SY
$54.00
$38.10
2%
512E10400TREATING OF CONCRETE BRIDGE DECK WITH SRS
1,055 SY
$6.30
$6.11
2%
$38.10
512E74000REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE
21 SY
$18.00
$18.60
100E00300PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY
1 LS
$1,000
$5,000
103E05000PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM
1 LS
$5,000
$5,675
623E10001CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P
1 LS
$100
$6,548
21%
512E10400TREATING OF CONCRETE BRIDGE DECK WITH SRS
6,855 SY
$6.3
$43k
12%
512E10400TREATING OF CONCRETE BRIDGE DECK WITH SRS
4,152 SY
$6.3
$26k
7%
512E10400TREATING OF CONCRETE BRIDGE DECK WITH SRS
2,728 SY
$6.3
$17k
5%
614E11110LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST
400 HOUR
$40
$16k
4%
512E10400TREATING OF CONCRETE BRIDGE DECK WITH SRS
2,481 SY
$6.3
$16k
4%
512E10400TREATING OF CONCRETE BRIDGE DECK WITH SRS
2,298 SY
$6.3
$14k
4%
512E10400TREATING OF CONCRETE BRIDGE DECK WITH SRS
2,270 SY
$6.3
$14k
4%
512E10400TREATING OF CONCRETE BRIDGE DECK WITH SRS
2,177 SY
$6.3
$14k
4%
512E10400TREATING OF CONCRETE BRIDGE DECK WITH SRS