BUT-CULVERTS FY23
BUT County · est $0.5M
Bid dateThursday, November 3—
BUT County · est $0.5M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 35 more items below.
| Item | Quantity | R1Bcc Ohio INC | R2Rack & Ballauer Excavating CO INC | R3Eagle Bridge CO | R4Sunesis Construction CO | R5Axis Civil Construction LLC | R6Eclipse CO LLC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 611E94800 8' X 4' CONDUIT, TYPE A, 706.05 | — | $1,619 | $1,320 | $1,250 | $1,415 | $2,300 | $1,443 | 16% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 26 CY | $1,148 | $870 | $700 | $925 | $850 | $1,030 | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $28,645 | $25,000 | $55,000 | $45,350 |
| Item | Quantity | R1Bcc Ohio INC | R2Rack & Ballauer Excavating CO INC | R3Eagle Bridge CO | R4Sunesis Construction CO | R5Axis Civil Construction LLC | R6Eclipse CO LLC |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $6,975 | $5,000 | $100,000 | $56,000 | $25,000 | $15,000 |
| 202E11000 STRUCTURE REMOVED | 1 LS | $7,605 | $7,500 | $20,000 | $5,664 | $20,000 | $14,050 |
| 202E23000 PAVEMENT REMOVED | 65 SY | $20.54 | $30.00 | $23.00 | $30.80 | $20.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $40,000 |
| $25,100 |
| 8% |
| 611E96550 FIELD PAVING OF EXISTING PIPE, 60" CMP | 196 FT | $140 | $165 | $225 | $253 | $300 | $183 | 7% |
| 624E10000 MOBILIZATION | 1 LS | $26,217 | $24,000 | $20,000 | $81,588 | $40,000 | $85,000 | 7% |
| 611E96550 FIELD PAVING OF EXISTING PIPE, 65"x40" CMP ARCH | 132 FT | $175 | $380 | $190 | $267 | $600 | $208 | 6% |
| 601E11000 RIPRAP, TYPE D | 83 SY | $272 | $200 | $155 | $327 | $165 | $245 | 6% |
| 611E96550 FIELD PAVING OF EXISTING PIPE, 114"x78" CMP ARCH | 74 FT | $255 | $230 | $350 | $444 | $300 | $325 | 5% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 91 CY | $163 | $150 | $125 | $202 | $190 | $114 | 4% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 9.64 CY | $1,519 | $1,870 | $1,500 | $2,201 | $2,300 | $2,622 | 4% |
| 611E96550 FIELD PAVING OF EXISTING PIPE, 73"x55" CMP ARCH | 68 FT | $214 | $456 | $325 | $322 | $200 | $241 | 4% |
| 659E10000 SEEDING AND MULCHING | 6,486 SY | $2.05 | $2.85 | $3.00 | $1.62 | $3.25 | $2.25 | 4% |
| 611E96550 FIELD PAVING OF EXISTING PIPE, 73"x54" CMP ARCH | 60 FT | $217 | $450 | $250 | $361 | $200 | $254 | 3% |
| 614E12420 DETOUR SIGNING | 1 LS | $11,305 | $10,000 | $15,000 | $14,984 | $20,000 | $10,223 | 3% |
| 623E38500 MONUMENT ASSEMBLY, TYPE C | 4 EACH | $2,716 | $2,500 | $2,000 | $1,076 | $2,800 | $2,612 | 3% |
| 611E96550 FIELD PAVING OF EXISTING PIPE, 42" CMP | 84 FT | $116 | $262 | $155 | $211 | $600 | $189 | 3% |
| 659E00300 TOPSOIL | 720 CY | $13.53 | $65.00 | $10.00 | $10.21 | $30.00 | $50.00 | 3% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 11 CY | $851 | $500 | $600 | $810 | $800 | $820 | 2% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, NCHRP 350 OR MASH 201 | 3 EACH | $3,024 | $2,675 | $2,550 | $2,675 | $2,550 | $3,079 | 2% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $8,505 | $500 | $80,000 | $98,219 | $10,000 | $228,600 | 2% |
| $26.00 |
| 202E70120 SPECIAL - PIPE CLEANOUT, 27" TO 48" | 84 FT | $26.31 | $36.00 | $88.00 | $71.76 | $600 | $154 |
| 202E70130 SPECIAL - PIPE CLEANOUT OVER 48" | 196 FT | $21.35 | $40.00 | $140 | $47.44 | $350 | $240 |
| 203E10000 EXCAVATION | 7 CY | $22.50 | $42.00 | $35.00 | $30.35 | $50.00 | $80.00 |
| 203E20000 EMBANKMENT | 91 CY | $16.88 | $42.00 | $35.00 | $20.41 | $50.00 | $49.00 |
| 204E10000 SUBGRADE COMPACTION | 72 SY | $7.88 | $14.50 | $10.00 | $3.07 | $5.00 | $3.00 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $1,114 | $8,000 | $30,000 | $1,492 | $30,000 | $11,426 |
| 606E15050 GUARDRAIL, TYPE MGS | 212.5 FT | $24.78 | $24.00 | $23.00 | $24.00 | $23.00 | $26.00 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $1,444 | $1,360 | $1,300 | $1,360 | $1,300 | $1,434 |
| 623E40500 REFERENCE MONUMENT, TYPE A | 4 EACH | $1,028 | $700 | $1,200 | $883 | $800 | $882 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $6,795 | $3,000 | $3,000 | $742 | $10,000 | $1,956 |
| 654E11000 COMMERCIAL FERTILIZER | 0.88 TON | $683 | $1,200 | $1,500 | $1,200 | $1,500 | $791 |
| 659E31000 LIME | 1.34 ACRE | $73.50 | $200 | $10.00 | $250 | $200 | $105 |
| 659E35000 WATER | 35 MGAL | $0.95 | $10.00 | $15.00 | $10.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 7,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E97700 CONDUIT, MISC.: ZINC RICH PAINT | 45 SF | $32.83 | $25.00 | $100 | $39.05 | $100 | $32.00 |
| 304E20000 AGGREGATE BASE | 12 CY | $227 | $175 | $180 | $105 | $200 | $131 |
| 407E10000 TACK COAT | 10 GAL | $10.50 | $4.00 | $1.00 | $10.00 | $5.00 | $10.00 |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (5 CY | $1,643 | $1,150 | $1,100 | $1,565 | $800 | $1,570 |
| 621E00100 RPM | 1 EACH | $1,674 | $3,245 | $1,594 | $3,245 | $1,594 | $1,681 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 1 EACH | $18.00 | $35.00 | $20.00 | $1.00 | $60.00 | $105 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BI-DIRECTIONAL) | 6 EACH | $13.13 | $15.00 | $9.50 | $15.00 | $9.50 | $13.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.02 MILE | $47,513 | $75,800 | $45,250 | $75,800 | $45,250 | $47,714 |
| 642E00300 CENTER LINE, TYPE 1 | 0.01 MILE | $95,025 | $101,325 | $90,500 | $101,325 | $90,500 | $95,428 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 3,114 LB | $2.67 | $1.25 | $2.50 | $3.16 | $4.00 | $6.00 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 1 CY | $1,518 | $1,870 | $3,000 | $2,397 | $3,000 | $3,701 |
| 512E10000 SEALING OF CONCRETE SURFACES | 40 SY | $38.10 | $32.00 | $70.00 | $66.43 | $65.00 | $34.00 |
| 512E33000 TYPE 2 WATERPROOFING | 90 SY | $30.61 | $31.50 | $29.00 | $28.72 | $23.00 | $21.00 |
| 512E33010 TYPE 3 WATERPROOFING | 91 SY | $55.05 | $43.00 | $44.00 | $46.98 | $60.00 | $51.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 26 SF | $15.17 | $3.25 | $7.00 | $4.64 | $10.00 | $10.00 |
| 518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 1 LS | $2,102 | $2,450 | $2,000 | $1,687 | $3,500 | $2,354 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,876 | $5,000 | $10,000 | $4,927 | $8,000 | $10,986 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,960 | $6,000 | $15,000 | $13,000 | $10,000 | $14,645 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E94800 8' X 4' CONDUIT, TYPE A, 706.05 | — | $1,619 | $62k | 13% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 26 CY | $1,148 | $30k | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $28,645 | $29k | 6% |
| 611E96550 FIELD PAVING OF EXISTING PIPE, 60" CMP | 196 FT | $140.27 | $27k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $26,217 | $26k | 6% |
| 611E96550 FIELD PAVING OF EXISTING PIPE, 65"x40" CMP ARCH | 132 FT | $175.17 | $23k | 5% |
| 601E11000 RIPRAP, TYPE D | 83 SY | $272.3 | $23k | 5% |
| 611E96550 FIELD PAVING OF EXISTING PIPE, 114"x78" CMP ARCH | 74 FT | $255.43 | $19k | 4% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 91 CY | $163.39 | $15k | 3% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 9.64 CY | $1,519 | $15k | 3% |