HAM-IR 75-16.42
HAM County · est $4.1M
Bid dateThursday, November 3—
HAM County · est $4.1M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 16 more items below.
| Item | Quantity | R1Barrett Paving Materials INC | R2John R Jurgensen Company | % of bid |
|---|---|---|---|---|
| 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 6,156 CY | $205 | $238 | 28% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 5,277 CY | $220 | $288 | 26% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3.25" | 126,643 SY | $4.15 | $3.15 | 12% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $515,000 | $935,283 | 11% |
| 253E02000 PAVEMENT REPAIR | 400 CY | $660 | $743 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $200,000 | $200,000 | 4% |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 7,210 CY | $18.00 | $9.75 | 3% |
| 872E10000 VOID REDUCING ASPHALT MEMBRANE (VRAM) |
| Item | Quantity | R1Barrett Paving Materials INC | R2John R Jurgensen Company |
|---|---|---|---|
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 |
| 254E01600 PATCHING PLANED SURFACE | 1,270 SY | $8.00 | $4.21 |
| 617E20000 SHOULDER PREPARATION | 5,844 SY | $1.00 | $1.19 |
| 617E25000 WATER | 5 MGAL | $50.00 | $52.17 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 620 EACH | $10.00 | $23.35 |
| 642E00214 LANE LINE, 6", TYPE 1A | 4.66 MILE | $850 | $850 |
| 642E00414 CHANNELIZING LINE, 12", TYPE 1A |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 32,101 FT |
| $2.70 |
| $2.04 |
| 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 1,000 HOUR | $85.00 | $93.71 | 2% |
| 407E20000 NON-TRACKING TACK COAT | 18,997 GAL | $3.00 | $4.50 | 1% |
| 617E10100 COMPACTED AGGREGATE | 243 CY | $190 | $52.48 | 1% |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 9.74 MILE | $4,462 | $4,198 | 1% |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 9.74 MILE | $4,462 | $4,198 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $26,926 | $28,580 | 1% |
| 621E00100 RPM | 620 EACH | $36.95 | $33.50 | 1% |
| 618E40600 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 10.1 MILE | $1,745 | $1,235 | 0% |
| 642E00114 EDGE LINE, 6", TYPE 1A | 9.74 MILE | $1,394 | $1,394 | 0% |
| 614E23210 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 642 PAI | 7,254 FT | $1.63 | $1.53 | 0% |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 7,254 FT | $1.63 | $1.53 | 0% |
| 614E20110 WORK ZONE LANE LINE, CLASS I, 6", 642 PAINT | 4.66 MILE | $2,275 | $2,140 | 0% |
| 7,254 FT |
| $1.00 |
| $1.00 |
| 642E01516 DOTTED LINE, 6", TYPE 1A | 150 FT | $5.00 | $5.00 |
| 644E00720 CHEVRON MARKING | 697 FT | $8.22 | $8.00 |
| 644E01350 LANE REDUCTION ARROW | 3 EACH | $950 | $800 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 8 SNMT | $995 | $995 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 4.66 MILE | $2,275 | $2,140 |
| 614E24202 WORK ZONE DOTTED LINE, CLASS I, 6", 642 PAINT | 150 FT | $6.27 | $5.90 |
| 614E24612 WORK ZONE DOTTED LINE, CLASS III, 6", 642 PAINT | 150 FT | $6.27 | $5.90 |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 8 SNMT | $1,050 | $1,050 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $8,000 | $16,493 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 6,156 CY | $205 | $1.26M | 27% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 5,277 CY | $220 | $1.16M | 25% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3.25" | 126,643 SY | $4.15 | $526k | 11% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $515,000 | $515k | 11% |
| 253E02000 PAVEMENT REPAIR | 400 CY | $660 | $264k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $200,000 | $200k | 4% |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 7,210 CY | $18 | $130k | 3% |
| 872E10000 VOID REDUCING ASPHALT MEMBRANE (VRAM) | 32,101 FT | $2.7 | $87k | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 1,000 HOUR | $85 | $85k | 2% |
| 407E20000 NON-TRACKING TACK COAT | 18,997 GAL | $3 | $57k | 1% |