SAN-SR 600-03.02
SAN County · est $0.4M
Bid dateThursday, November 17—
SAN County · est $0.4M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 33 more items below.
| Item | Quantity | R1Adena Corporation | R2Vernon Nagel INC | R3Great Lakes Demolition Company | R4Geo Gradel CO | R5Eclipse CO LLC | % of bid |
|---|---|---|---|---|---|---|---|
| 611E95800 12' X 6' CONDUIT, TYPE A, 706.05 | 81 FT | $1,519 | $1,700 | $1,267 | $1,725 | $1,656 | 36% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 125 CY | $259 | $227 | $216 | $245 | $232 | 9% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $27,210 | $20,000 | $18,500 | $30,000 | $16,000 | 8% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 61 CY | $285 | $250 | $290 | $350 | $255 | 5% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 31 CY | $547 | $650 | $500 | $592 | $976 | 5% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS |
| Item | Quantity | R1Adena Corporation | R2Vernon Nagel INC | R3Great Lakes Demolition Company | R4Geo Gradel CO | R5Eclipse CO LLC |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,599 | $1,500 | $5,000 | $2,500 | $5,000 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 122 FT | $18.67 | $20.00 | $15.00 | $40.00 | $41.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 8 FT | $109 | $25.00 | $30.00 | $60.00 | $64.00 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 4 EACH | $571 | $500 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $13,869 |
| $20,000 |
| $8,500 |
| $14,000 |
| $15,000 |
| 4% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 17 CY | $795 | $1,100 | $850 | $1,230 | $2,140 | 4% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $10,945 | $8,000 | $3,500 | $12,000 | $31,000 | 3% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 3 EACH | $3,310 | $2,900 | $2,900 | $2,960 | $3,202 | 3% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 4,005 LB | $2.24 | $2.50 | $2.50 | $2.65 | $3.00 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $8,903 | $10,000 | $82,500 | $20,000 | $21,406 | 3% |
| 304E20000 AGGREGATE BASE | 130 CY | $66.53 | $56.00 | $65.00 | $90.00 | $71.00 | 3% |
| 202E23000 PAVEMENT REMOVED | 647 SY | $11.86 | $15.00 | $15.00 | $15.00 | $9.00 | 2% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 47 CY | $151 | $100 | $125 | $175 | $121 | 2% |
| 606E15050 GUARDRAIL, TYPE MGS | 150 FT | $44.51 | $23.00 | $39.00 | $22.80 | $25.00 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $6,365 | $5,000 | $12,500 | $7,500 | $22,000 | 2% |
| 611E04400 12" CONDUIT, TYPE B | 70 FT | $85.25 | $85.00 | $55.00 | $100 | $105 | 2% |
| 611E07400 18" CONDUIT, TYPE B | 56 FT | $104 | $88.00 | $85.00 | $100 | $122 | 2% |
| 512E33000 TYPE 2 WATERPROOFING | 281 SY | $18.80 | $25.00 | $40.00 | $25.00 | $26.00 | 2% |
| 202E38000 GUARDRAIL REMOVED | 400 FT | $11.41 | $4.00 | $2.00 | $15.00 | $2.00 | 1% |
| $400 |
| $400 |
| $344 |
| 203E10000 EXCAVATION | 45 CY | $14.61 | $16.00 | $15.00 | $37.00 | $30.00 |
| 203E20000 EMBANKMENT | 65 CY | $10.11 | $16.00 | $20.00 | $42.00 | $35.00 |
| 204E10000 SUBGRADE COMPACTION | 785 SY | $2.07 | $1.00 | $2.00 | $3.00 | $1.00 |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 1 EACH | $3,310 | $2,900 | $2,900 | $2,240 | $2,405 |
| 659E00300 TOPSOIL | 30 CY | $134 | $25.00 | $40.00 | $80.00 | $70.00 |
| 659E10000 SEEDING AND MULCHING | 262 SY | $3.38 | $15.30 | $2.00 | $9.25 | $10.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 14 SY | $1.00 | $15.30 | $1.00 | $1.00 | $2.00 |
| 659E15000 INTER-SEEDING | 14 SY | $1.00 | $10.00 | $1.00 | $0.10 | $0.22 |
| 659E20000 COMMERCIAL FERTILIZER | 0.06 TON | $1,979 | $700 | $800 | $685 | $952 |
| 659E31000 LIME | 0.06 ACRE | $1,750 | $35.00 | $400 | $50.00 | $108 |
| 659E35000 WATER | 2 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 3,500 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 0.7 CY | $1,259 | $2,800 | $2,500 | $2,000 | $2,450 |
| 611E00406 4" CONDUIT, TYPE F | 20 FT | $5.70 | $10.00 | $15.00 | $15.00 | $53.00 |
| 611E01500 6" CONDUIT, TYPE F | 20 FT | $8.56 | $12.00 | $15.00 | $15.00 | $56.00 |
| 611E04400 12" CONDUIT, TYPE B, 706.02 | 8 FT | $134 | $132 | $250 | $350 | $132 |
| 611E16600 36" CONDUIT, TYPE C, 706.02 | 8 FT | $277 | $275 | $500 | $300 | $228 |
| 611E98470 CATCH BASIN, NO. 2-2B | 1 EACH | $2,091 | $2,000 | $1,120 | $2,500 | $4,090 |
| 407E20000 NON-TRACKING TACK COAT | 75 GAL | $2.85 | $2.50 | $4.00 | $3.67 | $2.55 |
| 617E10100 COMPACTED AGGREGATE | 16 CY | $53.50 | $62.00 | $70.00 | $200 | $167 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 1 EACH | $82.18 | $150 | $100 | $50.00 | $96.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 6 EACH | $85.60 | $75.00 | $75.00 | $75.00 | $156 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1 EACH | $28.53 | $25.00 | $25.00 | $25.00 | $70.00 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 3 CY | $600 | $900 | $900 | $1,400 | $1,138 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 57 SY | $8.89 | $25.00 | $45.00 | $75.00 | $40.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 51 SF | $4.96 | $12.00 | $25.00 | $5.70 | $10.00 |
| 518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 1 LS | $3,354 | $2,500 | $6,500 | $7,500 | $2,876 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,881 | $5,000 | $9,500 | $8,500 | $10,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,098 | $3,590 | $5,500 | $7,500 | $9,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E95800 12' X 6' CONDUIT, TYPE A, 706.05 | 81 FT | $1,519 | $123k | 32% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 125 CY | $259.1 | $32k | 8% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $27,210 | $27k | 7% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 61 CY | $285.35 | $17k | 4% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 31 CY | $547.18 | $17k | 4% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $13,869 | $14k | 4% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 17 CY | $794.71 | $14k | 3% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $10,945 | $11k | 3% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 3 EACH | $3,310 | $10k | 3% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 4,005 LB | $2.24 | $9k | 2% |