WOO-SR 235-06.12/06.42 Bridge Repl.
WOO County · est $1.4M
Bid dateThursday, January 13—
WOO County · est $1.4M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 50 more items below.
| Item | Quantity | R1Vernon Nagel INC | R2Great Lakes Demolition Company | % of bid |
|---|---|---|---|---|
| 611E96461 20' X 10' CONDUIT, TYPE A, 706.05, AS PER PLAN, DE | 158 FT | $2,200 | $1,850 | 32% |
| 611E95500 10' X 8' CONDUIT, TYPE A, 706.05 | 72 FT | $1,250 | $1,150 | 8% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 61 CY | $1,000 | $650 | 6% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 396 CY | $150 | $175 | 5% |
| 611E24000 60" CONDUIT, TYPE C | 235 FT | $225 | $195 | 5% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 115 CY | $450 | $750 | 5% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 211 CY | $215 | $230 | 4% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 43 CY | $1,000 | $650 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $60,000 | 4% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 83 CY | $450 | $750 | 3% |
| 203E35120 GRANULAR MATERIAL, TYPE C | 714 CY | $50.00 | $50.00 | 3% |
| 253E02000 PAVEMENT REPAIR | 150 CY | $210 | $260 | 3% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 20,398 LB | $1.40 | $2.50 | 3% |
| 304E20000 AGGREGATE BASE | 387 CY | $70.00 | $50.00 | 2% |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 270 CY | $100 | $105 | 2% |
| 203E20000 EMBANKMENT | 2,227 CY | $12.00 | $20.00 | 2% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $25,000 | $12,500 | 2% |
| 602E20000 CONCRETE MASONRY | 20 CY | $1,200 | $800 | 2% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 13,924 LB | $1.40 | $2.50 | 2% |
| 203E10000 EXCAVATION | 840 CY | $20.00 | $15.00 | 2% |
| Item | Quantity | R1Vernon Nagel INC | R2Great Lakes Demolition Company |
|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,500 | $1,000 |
| 202E23000 PAVEMENT REMOVED | 1,569 SY | $10.00 | $9.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 135 FT | $15.00 | $10.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 119 FT | $10.00 | $20.00 |
| 202E38000 GUARDRAIL REMOVED | 558 FT | $4.00 | $2.00 |
| 204E10000 SUBGRADE COMPACTION | 2,317 SY | $1.00 | $2.00 |
| 623E38500 MONUMENT ASSEMBLY | 3 EACH | $800 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $1,150 |
| 659E00300 TOPSOIL | 369 CY | $25.00 | $50.00 |
| 659E10000 SEEDING AND MULCHING | 3,315 SY | $1.54 | $2.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 167 SY | $2.00 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.5 TON | $1,200 | $1,000 |
| 659E31000 LIME | 0.7 ACRE | $35.00 | $800 |
| 659E35000 WATER | 19 MGAL | $1.00 | $5.00 |
| 670E00500 SLOPE EROSION PROTECTION | 1,773 SY | $1.81 | $6.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,500 | $1,250 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $500 | $1,000 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $3,500 | $4,500 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 |
| 605E06000 4" BASE PIPE UNDERDRAINS | 1,250 FT | $12.00 | $8.00 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 160 FT | $20.00 | $10.00 |
| 611E01100 6" CONDUIT, TYPE C | 33 FT | $30.00 | $15.00 |
| 611E04600 12" CONDUIT, TYPE C | 15 FT | $50.00 | $45.00 |
| 611E04901 12" CONDUIT, TYPE D, AS PER PLAN | 161 FT | $55.00 | $45.00 |
| 611E05200 12" CONDUIT, TYPE F | 10 FT | $45.00 | $45.00 |
| 611E06101 15" CONDUIT, TYPE C, AS PER PLAN | 18 FT | $60.00 | $70.00 |
| 611E16901 36" CONDUIT, TYPE D, AS PER PLAN | 60 FT | $150 | $85.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 8 EACH | $285 | $200 |
| 407E20000 NON-TRACKING TACK COAT | 323 GAL | $2.00 | $5.00 |
| 616E10000 WATER | 7 MGAL | $10.00 | $5.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 4 EACH | $25.00 | $100 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 2 EACH | $50.00 | $100 |
| 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 2 EACH | $25.00 | $100 |
| 202E11000 STRUCTURE REMOVED | 1 LS | $15,000 | $16,500 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $15,000 | $6,500 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 4 CY | $2,000 | $950 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 110 SY | $25.00 | $15.00 |
| 512E33000 TYPE 2 WATERPROOFING | 830 SY | $20.00 | $50.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 81 SF | $6.00 | $20.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 55 CY | $75.00 | $65.00 |
| 202E11000 STRUCTURE REMOVED | 1 LS | $15,000 | $12,500 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $15,000 | $3,500 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $10,000 | $6,500 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 3 CY | $1,000 | $950 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 85 SY | $25.00 | $15.00 |
| 512E33000 TYPE 2 WATERPROOFING | 290 SY | $20.00 | $50.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 69 SF | $6.00 | $20.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 35 CY | $75.00 | $65.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $14,000 | $12,000 |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $3,650 | $8,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $8,680 | $6,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E96461 20' X 10' CONDUIT, TYPE A, 706.05, AS PER PLAN, DE | 158 FT | $2,200 | $348k | 26% |
| 611E95500 10' X 8' CONDUIT, TYPE A, 706.05 | 72 FT | $1,250 | $90k | 7% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 61 CY | $1,000 | $61k | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 396 CY | $150 | $59k | 4% |
| 611E24000 60" CONDUIT, TYPE C | 235 FT | $225 | $53k | 4% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 115 CY | $450 | $52k | 4% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 211 CY | $215 | $45k | 3% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 43 CY | $1,000 | $43k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 3% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 83 CY | $450 | $37k | 3% |