Figure 0.1 · BRIEFING BID #230032 · ODOT RESULT · awarded Jan 12 D05-PM FY2023 (A) Fast Dry East D05 County · est $1.8M
Bid date Thursday, January 12 —
Project scope Bid form · ODOT
21 ITEMS Pavement Marking 48% Maintaining Traffic 19% Mobilization & General 10% Other 24% Top items by winning bid Item Qty Unit price Extended % 642E00104 EDGE LINE, 6", TYPE 1 1,343.88 MILE $847 $1.14M 57% 642E00300 CENTER LINE, TYPE 1 504.93 MILE $900 $454k 23%
Item Quantity R1 Dura Mark INC R2 Oglesby Construction INC % of bid 642E00104 EDGE LINE, 6", TYPE 1 1,343.88 MILE $847 $877 57% 642E00300 CENTER LINE, TYPE 1 504.93 MILE $900 $1,030 23% 642E00204 LANE LINE, 6", TYPE 1 205.74 MILE $449 $370 5% 614E11000 MAINTAINING TRAFFIC 1 LS $60,000 $20,000 3% 642E00404 CHANNELIZING LINE, 12", TYPE 1 69,343 FT $0.60 $0.75 2% 642E01510 DOTTED LINE, 6", TYPE 1 44,306 FT $0.80 $0.78 2% 642E01300 LANE ARROW, TYPE 1 372 EACH $76.00 $70.00 1% 642E40001 SPEED MEASUREMENT MARKING, AS PER PLAN 22 EACH $1,250 $855 1% 624E10000 MOBILIZATION 1 LS $20,000 $56,000 1% 642E00500 STOP LINE, TYPE 1 5,080 FT $3.65 $3.90 1% 642E00620 CROSSWALK LINE, 12", TYPE 1 3,962 FT $3.00 $2.50 1% 642E01000 RAILROAD SYMBOL MARKING, TYPE 1 32 EACH $365 $380 1% 642E01110 SCHOOL SYMBOL MARKING, 96", TYPE 1 30 EACH $365 $400 1% 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM 1 LS $10,044 $11,500 1% 642E01410 WORD ON PAVEMENT, 96", TYPE 1 107 EACH $86.00 $90.00 0% 642E01322 WRONG WAY ARROW, TYPE 1 31 EACH $295 $250 0% 642E00400 CHANNELIZING LINE, 8", TYPE 1 17,736 FT $0.50 $0.60 0% 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST 150 HOUR $50.00 $80.00 0% 642E01602 BIKE LANE SYMBOL MARKING, TYPE 1 22 EACH $125 $225 0% 642E20802 YIELD LINE, TYPE 1 100 FT $8.00 $20.00 0%
Show all 21 line items Project details
Description D05-PM FY2023 (A) Fast Dry East
Type of work Pavement How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →