MAD-/PIC-IR 71-07.30/00.00 Part 1&2
MAD County · est $118M
Bid dateThursday, February 16—
MAD County · est $118M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 914 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Kokosing Construction Company INC | R3John R Jurgensen Company | % of bid |
|---|---|---|---|---|---|
| 302E56001 ASPHALT CONCRETE BASE, (449), AS PER PLAN (PG64-22 | 120,511 CY | $125 | $131 | $145 | 24% |
| 302E56001 ASPHALT CONCRETE BASE, (449), AS PER PLAN (PG64-22 | 44,429 CY | $125 | $131 | $149 | 9% |
| 304E20000 AGGREGATE BASE | 89,661 CY | $57.00 | $52.00 | $67.39 | 8% |
| 442E10300 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 22,376 CY | $194 | $270 | $257 | 7% |
| 442E10080 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 24,299 CY | $148 | $190 | $190 | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $3,000,000 | $2,989,150 | $5,405,812 | 5% |
| 203E10000 EXCAVATION | 211,637 CY | $14.00 |
| Item | Quantity | R1Shelly & Sands INC | R2Kokosing Construction Company INC | R3John R Jurgensen Company |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $400,000 | $200,000 | $179,641 |
| 202E11000 STRUCTURE REMOVED | 1 LS | $6,000 | $75,000 | $61,996 |
| 202E20010 HEADWALL REMOVED | 23 EACH | $450 | $3,100 | $1,578 |
| 202E30700 CONCRETE BARRIER REMOVED | 618 FT | $13.00 | $10.00 | $44.69 |
| 202E32000 CURB REMOVED | 256 FT | $5.00 | $5.00 | $22.79 |
| 202E35100 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $17.00 |
| $13.21 |
| 5% |
| 206E10500 CEMENT | 13,894 TON | $200 | $190 | $195 | 4% |
| 202E23000 PAVEMENT REMOVED | 369,326 SY | $6.00 | $6.50 | $11.87 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $2,000,000 | $2,000,000 | $2,000,000 | 3% |
| 615E20001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER | 44,333 SY | $43.00 | $60.00 | $53.82 | 3% |
| 304E20000 AGGREGATE BASE | 32,389 CY | $58.25 | $52.00 | $69.17 | 3% |
| 605E11100 6" SHALLOW PIPE UNDERDRAINS | 166,624 FT | $10.00 | $9.00 | $10.73 | 3% |
| 206E15010 CEMENT STABILIZED SUBGRADE, 12 INCHES DEEP | 536,926 SY | $3.00 | $3.55 | $4.90 | 3% |
| 452E16021 13" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 11,896 SY | $135 | $133 | $172 | 3% |
| 442E10300 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 8,233 CY | $194 | $270 | $253 | 3% |
| 606E55010 SPECIAL - CABLE BARRIER WITH CONCRETE LINE POST FO | 40,137 FT | $37.00 | $43.37 | $58.99 | 2% |
| 442E10080 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 8,953 CY | $148 | $190 | $185 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,325,000 | $900,000 | $1,493,738 | 2% |
| 622E41011 PORTABLE BARRIER, 50", AS PER PLAN | 132,382 FT | $10.00 | $10.00 | $19.89 | 2% |
| 8,346 FT |
| $13.00 |
| $18.50 |
| $20.12 |
| 202E35200 PIPE REMOVED, OVER 24" | 1,576 FT | $25.00 | $58.00 | $19.58 |
| 202E38000 GUARDRAIL REMOVED | 22,346 FT | $1.60 | $1.60 | $2.50 |
| 202E48001 CABLE BARRIER REMOVED, AS PER PLAN | 500 FT | $8.00 | $36.00 | $9.48 |
| 202E58100 CATCH BASIN REMOVED | 97 EACH | $340 | $320 | $414 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, 42" TYPE | 187 FT | $60.00 | $100 | $145 |
| 202E75000 FENCE REMOVED | 1,111 FT | $2.00 | $2.00 | $5.75 |
| 203E20000 EMBANKMENT | 119,223 CY | $8.00 | $3.00 | $12.45 |
| 203E20001 EMBANKMENT, AS PER PLAN | 1,518 CY | $18.00 | $5.00 | $19.92 |
| 204E10000 SUBGRADE COMPACTION | 4,625 SY | $3.50 | $8.00 | $6.92 |
| 204E45000 PROOF ROLLING | 271 HOUR | $400 | $200 | $223 |
| 206E11000 CURING COAT | 536,926 SY | $1.10 | $1.10 | $1.10 |
| 206E30000 MIXTURE DESIGN FOR CHEMICALLY STABILIZED SOILS | 1 LS | $85,000 | $86,000 | $100,000 |
| 209E10000 DITCH CLEANOUT | 600 FT | $13.50 | $10.00 | $27.41 |
| 606E15050 GUARDRAIL, TYPE MGS | 16,100 FT | $20.00 | $18.80 | $21.00 |
| 606E15550 GUARDRAIL, BARRIER DESIGN, TYPE MGS | 1,000 FT | $34.00 | $31.60 | $29.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 40 EACH | $2,700 | $2,585 | $2,350 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 26 EACH | $1,400 | $1,360 | $975 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 38 EACH | $2,600 | $2,450 | $2,250 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 4 EACH | $630 | $595 | $450 |
| 606E55150 SPECIAL - CABLE BARRIER, ANCHOR ASSEMBLY | 35 EACH | $4,200 | $3,950 | $3,400 |
| 606E60012 IMPACT ATTENUATOR, TYPE 1 (BIDIRECTIONAL) | 16 EACH | $6,500 | $6,125 | $6,100 |
| 607E15000 FENCE, TYPE 47 | 1,111 FT | $22.00 | $19.50 | $13.00 |
| 607E70000 FENCELINE SEEDING AND MULCHING | 1,111 FT | $1.25 | $1.50 | $0.68 |
| 622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D | 200 FT | $175 | $150 | $200 |
| 622E25000 CONCRETE BARRIER END SECTION, TYPE D | 10 EACH | $5,700 | $3,450 | $6,352 |
| 622E25050 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 10 EACH | $5,700 | $3,800 | $6,352 |
| 623E38500 MONUMENT ASSEMBLY, TYPE C | 45 EACH | $1,400 | $1,230 | $1,050 |
| 601E10000 RIPRAP | 44 SY | $270 | $535 | $383 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 53.2 SY | $127 | $100 | $185 |
| 601E21060 TIED CONCRETE BLOCK MAT WITH TYPE 2 UNDERLAYMENT | 767 SY | $62.00 | $75.00 | $78.30 |
| 601E32000 ROCK CHANNEL PROTECTION, TYPE A WITH FILTER | 171 CY | $110 | $160 | $180 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 94 CY | $138 | $130 | $216 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 55 CY | $269 | $132 | $356 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 11 CY | $277 | $123 | $448 |
| 659E00100 SOIL ANALYSIS TEST | 4 EACH | $50.00 | $50.00 | $75.00 |
| 659E00300 TOPSOIL | 34,545 CY | $8.00 | $5.50 | $6.45 |
| 659E10000 SEEDING AND MULCHING | 311,214 SY | $0.50 | $0.44 | $0.68 |
| 659E14000 REPAIR SEEDING AND MULCHING | 15,561 SY | $0.40 | $0.40 | $0.68 |
| 659E15000 INTER-SEEDING | 15,561 SY | $0.01 | $0.01 | $0.48 |
| 659E20000 COMMERCIAL FERTILIZER | 43.4 TON | $530 | $500 | $950 |
| 659E31000 LIME | 64.3 ACRE | $53.00 | $50.00 | $10.00 |
| 659E35000 WATER | 1,723 MGAL | $0.01 | $0.01 | $0.50 |
| 659E40000 MOWING | 701 MSF | $1.80 | $1.72 | $6.00 |
| 670E00500 SLOPE EROSION PROTECTION | 54,063 SY | $1.80 | $1.72 | $2.25 |
| 670E00700 DITCH EROSION PROTECTION | 11,156 SY | $1.80 | $1.72 | $1.95 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $4,000 | $3,750 | $3,750 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $24,000 | $43,000 | $32,340 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $20,000 | $17,000 | $13,478 |
| 832E30000 EROSION CONTROL | 1,236,024 EACH | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 52 CY | $2,600 | $3,500 | $3,487 |
| 605E11000 6" CONSTRUCTION UNDERDRAINS | 20 FT | $23.00 | $23.00 | $60.86 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 1,930 FT | $17.00 | $17.00 | $24.94 |
| 605E14000 6" BASE PIPE UNDERDRAINS | 158,851 FT | $8.00 | $7.00 | $8.01 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 8,402 FT | $20.00 | $31.00 | $34.94 |
| 611E00900 6" CONDUIT, TYPE B | 50 FT | $38.00 | $25.00 | $40.01 |
| 611E01400 6" CONDUIT, TYPE E | 50 FT | $28.00 | $25.00 | $36.17 |
| 611E01500 6" CONDUIT, TYPE F | 100 FT | $36.00 | $25.00 | $36.16 |
| 611E01800 8" CONDUIT, TYPE B | 75 FT | $57.00 | $106 | $157 |
| 611E05900 15" CONDUIT, TYPE B | 767 FT | $100 | $121 | $114 |
| 611E06100 15" CONDUIT, TYPE C | 1,769 FT | $78.00 | $86.00 | $98.12 |
| 611E06700 15" CONDUIT, TYPE F | 121 FT | $103 | $99.00 | $118 |
| 611E07400 18" CONDUIT, TYPE B | 1,406 FT | $115 | $138 | $133 |
| 611E07600 18" CONDUIT, TYPE C | 4,200 FT | $112 | $97.00 | $109 |
| 611E08200 18" CONDUIT, TYPE F | 44 FT | $128 | $208 | $113 |
| 611E08900 21" CONDUIT, TYPE B | 656 FT | $136 | $184 | $175 |
| 611E09100 21" CONDUIT, TYPE C | 86 FT | $122 | $130 | $183 |
| 611E10400 24" CONDUIT, TYPE B | 1,326 FT | $129 | $149 | $134 |
| 611E10600 24" CONDUIT, TYPE C | 1,816 FT | $108 | $109 | $120 |
| 611E13400 30" CONDUIT, TYPE B | 384 FT | $163 | $167 | $172 |
| 611E16200 36" CONDUIT, TYPE A, 706.02 OR 707.33 | 120 FT | $310 | $400 | $180 |
| 611E16400 36" CONDUIT, TYPE B | 245 FT | $204 | $192 | $199 |
| 611E22200 54" CONDUIT, TYPE A, 706.02, 707.33, 707.65 OR 60" | 213 FT | $420 | $750 | $535 |
| 611E30000 96" CONDUIT, TYPE A, 707.04 | 20 FT | $950 | $3,000 | $1,434 |
| 611E52300 19" X 30" CONDUIT, TYPE A, 706.04 OR 706.03 | 210 FT | $230 | $500 | $353 |
| 611E52302 19" X 30" CONDUIT, TYPE B, 706.04 | 215 FT | $227 | $266 | $279 |
| 611E52702 29" X 45" CONDUIT, TYPE B, 706.04 | 411 FT | $340 | $390 | $462 |
| 611E53100 43" X 68" CONDUIT, TYPE A, 706.04 OR 706.03 | 280 FT | $880 | $700 | $898 |
| 611E53500 63" X 98" CONDUIT, TYPE A, 706.04 | 216 FT | $1,550 | $1,450 | $1,828 |
| 611E54300 106" X 166" CONDUIT, TYPE A, 706.04OR 706.03, OR 1 | 212 FT | $3,500 | $2,200 | $3,232 |
| 611E96550 FIELD PAVING OF EXISTING PIPE, 96" CMP | 286 FT | $195 | $165 | $175 |
| 611E96600 CONDUIT, BORED OR JACKED, 54", TYPE A | 200 FT | $1,200 | $1,150 | $1,027 |
| 611E98180 CATCH BASIN, NO. 3A | 2 EACH | $5,200 | $3,900 | $2,640 |
| 611E98300 CATCH BASIN, NO. 5 | 8 EACH | $6,600 | $4,120 | $4,587 |
| 611E98341 CATCH BASIN, NO. 5A | 4 EACH | $7,300 | $6,000 | $5,592 |
| 611E98410 CATCH BASIN, NO. 8 | 57 EACH | $6,600 | $4,375 | $4,814 |
| 611E98434 CATCH BASIN, NO. 8A | 5 EACH | $7,700 | $5,450 | $5,766 |
| 611E99574 MANHOLE, NO. 3 | 4 EACH | $5,300 | $3,800 | $3,102 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 30 EACH | $400 | $640 | $548 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING, STA. 575+18 | 1 LS | $26,000 | $38,250 | $122,112 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING, STA. 667+10 | 1 LS | $60,000 | $25,000 | $184,612 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING, STA. 733+00 | 1 LS | $26,000 | $1.00 | $122,112 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING, STA 471+00 | 1 LS | $25,000 | $1.00 | $126,327 |
| 251E01021 PARTIAL DEPTH PAVEMENT REPAIR (442), AS PER PLAN, | 400 SY | $54.00 | $35.00 | $75.25 |
| 251E01021 PARTIAL DEPTH PAVEMENT REPAIR (442), AS PER PLAN, | 1,600 SY | $40.00 | $60.00 | $80.25 |
| 251E01021 PARTIAL DEPTH PAVEMENT REPAIR (442), AS PER PLAN, | 12,000 SY | $68.00 | $50.00 | $85.65 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 40,675 SY | $4.00 | $3.00 | $1.66 |
| 407E20000 NON-TRACKING TACK COAT | 89,992 GAL | $3.50 | $3.00 | $4.00 |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 29,336 CY | $3.60 | $1.00 | $7.00 |
| 609E24510 CURB, TYPE 4-C | 737 FT | $65.00 | $44.00 | $43.13 |
| 618E40101 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE), AS PER | 4,275 FT | $7.50 | $3.50 | $13.24 |
| 618E40600 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 32.4 MILE | $650 | $948 | $625 |
| 442E22100 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 142 CY | $248 | $700 | $402 |
| 621E00100 RPM | 1,578 EACH | $36.00 | $33.75 | $33.55 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 904 EACH | $8.00 | $9.92 | $13.75 |
| 625E32000 GROUND ROD | 3 EACH | $335 | $315 | $435 |
| 626E00102 BARRIER REFLECTOR, TYPE 1 (ONE WAY) | 72 EACH | $10.00 | $10.00 | $9.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (ONE WAY) | 372 EACH | $12.00 | $11.50 | $9.00 |
| 626E00118 BARRIER REFLECTOR, TYPE 6 | 411 EACH | $13.00 | $12.70 | $15.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 308 FT | $13.00 | $13.00 | $11.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 486.5 FT | $15.00 | $14.00 | $12.50 |
| 630E04100 GROUND MOUNTED SUPPORT, NO. 4 POST | 322 FT | $16.00 | $15.50 | $15.00 |
| 630E06100 GROUND MOUNTED SUPPORT, NO. 6 POST | 68 FT | $18.00 | $17.00 | $20.00 |
| 630E07000 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W8X18 | 99.1 FT | $62.00 | $58.00 | $40.00 |
| 630E07500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X22 | 38.8 FT | $73.00 | $69.00 | $50.00 |
| 630E07600 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X12 | 42.5 FT | $52.00 | $49.00 | $28.50 |
| 630E08000 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W12X30 | 113.2 FT | $90.00 | $85.00 | $65.00 |
| 630E08600 SIGN POST REFLECTOR | 38 EACH | $48.00 | $45.00 | $42.00 |
| 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION | 12 EACH | $920 | $865 | $875 |
| 630E72340 OVERHEAD SIGN SUPPORT, TYPE TC-12.31, DESIGN 12 | 2 EACH | $48,000 | $44,550 | $40,000 |
| 630E80100 SIGN, FLAT SHEET | 505.8 SF | $16.00 | $15.00 | $20.00 |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 884.5 SF | $24.00 | $22.00 | $24.50 |
| 630E80224 SIGN, OVERHEAD EXTRUSHEET | 210 SF | $23.00 | $22.40 | $24.50 |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 12 EACH | $930 | $875 | $1,275 |
| 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION | 3 EACH | $8,300 | $7,825 | $8,500 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 79 EACH | $10.00 | $10.00 | $15.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 2 EACH | $69.00 | $65.00 | $50.00 |
| 630E85400 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND DISPOSAL | 9 EACH | $144 | $135 | $150 |
| 630E85600 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND REERECTIO | 2 EACH | $368 | $345 | $1,200 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 69 EACH | $16.00 | $15.00 | $15.00 |
| 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT | 18 EACH | $198 | $185 | $350 |
| 630E87100 REMOVAL OF OVERHEAD MOUNTED SIGN AND REERECTION | 3 EACH | $500 | $475 | $575 |
| 630E89100 REMOVAL OF OVERHEAD SIGN SUPPORT AND REERECTION, T | 3 EACH | $7,000 | $6,550 | $5,000 |
| 642E00100 EDGE LINE, 4", TYPE 1 | 1.28 MILE | $4,000 | $3,762 | $3,100 |
| 642E00300 CENTER LINE, TYPE 1 | 0.64 MILE | $7,000 | $6,500 | $4,370 |
| 644E00104 EDGE LINE, 6" | 2.48 MILE | $6,500 | $6,090 | $5,451 |
| 644E00204 LANE LINE, 6" | 2.48 MILE | $2,800 | $2,651 | $2,368 |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 1,800 FT | $1.60 | $1.55 | $3.10 |
| 646E10400 STOP LINE | 135 FT | $24.00 | $22.50 | $36.85 |
| 646E20320 WRONG WAY ARROW | 4 EACH | $420 | $400 | $700 |
| 648E00104 EDGE LINE, 6" | 49.2 MILE | $2,100 | $1,990 | $2,230 |
| 648E00204 LANE LINE, 6" | 49.2 MILE | $1,300 | $1,250 | $670 |
| 648E00404 CHANNELIZING LINE, 12" | 4,710 FT | $1.60 | $1.50 | $1.50 |
| 648E01510 DOTTED LINE, 6" | 4,838 FT | $1.30 | $1.20 | $1.40 |
| 807E10010 WET REFLECTIVE TRAFFIC PAINT, EDGE LINE, 6" | 31.84 MILE | $2,600 | $2,520 | $3,365 |
| 807E10110 WET REFLECTIVE TRAFFIC PAINT, LANE LINE, 6" | 30.25 MILE | $1,300 | $1,280 | $1,055 |
| 807E10310 WET REFLECTIVE TRAFFIC PAINT, CHANNELIZING LINE, 1 | 3,140 FT | $1.90 | $1.80 | $1.75 |
| 807E10410 WET REFLECTIVE TRAFFIC PAINT, DOTTED LINE, 6" | 3,216 FT | $1.00 | $1.00 | $1.50 |
| 850E10010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $2,800 | $2,651 | $2,500 |
| 850E10130 GROOVING FOR 12" RECESSED PAVEMENT MARKING | — | $1.30 | $1.25 | $1.75 |
| 850E20010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $5,700 | $5,400 | $6,000 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $300,000 | $250,000 | $285,000 |
| 202E22900 APPROACH SLAB REMOVED | 216 SY | $25.00 | $25.00 | $55.00 |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $300,000 | $500,000 | $750,000 |
| 503E21100 UNCLASSIFIED EXCAVATION | 963 CY | $120 | $113 | $50.00 |
| 504E11101 STEEL SHEET PILING LEFT IN PLACE, AS PER PLAN (ELA | 1,293 SF | $28.00 | $18.00 | $30.00 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $25,000 | $25,000 | $55,000 |
| 507E00200 STEEL PILES HP12X53, FURNISHED | 3,790 FT | $40.00 | $44.00 | $55.00 |
| 507E00250 STEEL PILES HP12X53, DRIVEN | 3,330 FT | $25.00 | $14.00 | $5.00 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 169,735 LB | $1.73 | $1.75 | $1.55 |
| 509E10001 EPOXY COATED STEEL REINFORCEMENT, AS PER PLAN | 57,210 LB | $1.50 | $1.60 | $1.55 |
| 509E30020 NO. 4 DEFORMED GFRP REINFORCEMENT | 8,702 FT | $1.30 | $1.50 | $1.20 |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 447 CY | $1,000 | $1,050 | $1,150 |
| 511E34451 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 86 CY | $575 | $700 | $825 |
| 511E40513 CLASS QC1 CONCRETE WITH QC/QA, PIER ABOVE FOOTINGS | 260 CY | $1,000 | $1,000 | $925 |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 147 CY | $1,000 | $900 | $755 |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 192 CY | $625 | $450 | $500 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 1,331 SY | $24.00 | $21.00 | $21.00 |
| 512E33000 TYPE 2 WATERPROOFING | 28 SY | $25.00 | $43.00 | $50.00 |
| 513E10241 STRUCTURAL STEEL MEMBERS, LEVEL 2, AS PER PLAN | 441,500 LB | $1.99 | $1.80 | $2.20 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 7,872 EACH | $5.25 | $6.00 | $5.00 |
| 514E00061 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 1,432 SF | $17.00 | $15.00 | $15.00 |
| 514E00067 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, AS P | 1,432 SF | $16.00 | $15.00 | $15.00 |
| 516E10010 ARMORLESS PREFORMED JOINT SEAL | 114 FT | $80.00 | $52.00 | $70.00 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 100 SF | $6.00 | $4.60 | $6.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 120 SF | $8.00 | $9.00 | $7.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 49 SF | $9.00 | $18.00 | $15.00 |
| 516E14014 INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 139 FT | $30.00 | $28.50 | $35.00 |
| 516E44100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 16 EACH | $1,200 | $1,430 | $1,500 |
| 516E44201 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 16 EACH | $1,500 | $2,010 | $2,000 |
| 518E12301 SCUPPERS, INCLUDING SUPPORTS, AS PER PLAN | 10 EACH | $3,900 | $4,000 | $7,000 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 123 CY | $100 | $110 | $150 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 168 FT | $3.00 | $9.50 | $15.00 |
| 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 80 FT | $15.00 | $31.25 | $40.00 |
| 523E20000 DYNAMIC LOAD TESTING | 2 EACH | $4,000 | $3,750 | $4,000 |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 330 SY | $400 | $367 | $350 |
| 526E90031 TYPE C INSTALLATION, AS PER PLAN | 114 FT | $350 | $252 | $350 |
| 530E00200 SPECIAL - STRUCTURES (TEMPORARY SUPPORT SYSTEM) | 1 LS | $20,000 | $75,000 | $215,000 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 295 CY | $129 | $148 | $95.00 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $250,000 | $125,000 | $260,000 |
| 202E22900 APPROACH SLAB REMOVED | 216 SY | $25.00 | $25.00 | $50.00 |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $300,000 | $215,000 | $625,000 |
| 503E21100 UNCLASSIFIED EXCAVATION | 830 CY | $100 | $122 | $50.00 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $25,000 | $15,000 | $35,000 |
| 507E00200 STEEL PILES HP12X53, FURNISHED | 3,790 FT | $40.00 | $43.60 | $55.00 |
| 507E00250 STEEL PILES HP12X53, DRIVEN | 3,330 FT | $25.00 | $14.00 | $5.00 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 209,967 LB | $1.40 | $1.50 | $1.50 |
| 509E10001 EPOXY COATED STEEL REINFORCEMENT, AS PER PLAN | 16,014 LB | $1.40 | $1.60 | $1.50 |
| 509E30020 NO. 4 DEFORMED GFRP REINFORCEMENT | 8,702 FT | $1.30 | $1.50 | $1.20 |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 447 CY | $900 | $950 | $1,100 |
| 511E34451 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 86 CY | $750 | $700 | $800 |
| 511E40513 CLASS QC1 CONCRETE WITH QC/QA, PIER ABOVE FOOTINGS | 260 CY | $850 | $1,000 | $900 |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 147 CY | $880 | $850 | $725 |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 192 CY | $500 | $450 | $450 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 1,331 SY | $24.00 | $21.00 | $21.00 |
| 512E33000 TYPE 2 WATERPROOFING | 18 SY | $25.00 | $45.00 | $40.00 |
| 513E10241 STRUCTURAL STEEL MEMBERS, LEVEL 2, AS PER PLAN | 441,500 LB | $1.92 | $1.80 | $2.10 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 7,872 EACH | $5.00 | $6.00 | $5.00 |
| 514E00061 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 1,432 SF | $17.00 | $15.00 | $15.00 |
| 514E00067 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, AS P | 1,432 SF | $17.00 | $15.00 | $15.00 |
| 516E10010 ARMORLESS PREFORMED JOINT SEAL | 114 FT | $80.00 | $52.00 | $55.00 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 100 SF | $8.00 | $4.60 | $6.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 120 SF | $10.00 | $9.00 | $7.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 49 SF | $12.00 | $18.00 | $14.00 |
| 516E14014 INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 139 FT | $35.00 | $28.50 | $35.00 |
| 516E44100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 16 EACH | $1,200 | $1,450 | $1,500 |
| 516E44201 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 16 EACH | $1,550 | $2,025 | $2,000 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 123 CY | $100 | $112 | $140 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 168 FT | $3.00 | $9.50 | $15.00 |
| 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 50 FT | $20.00 | $29.00 | $45.00 |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 330 SY | $350 | $340 | $325 |
| 526E90031 TYPE C INSTALLATION, AS PER PLAN | 114 FT | $250 | $250 | $310 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 295 CY | $129 | $150 | $90.00 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $175,000 | $85,000 | $135,000 |
| 202E22900 APPROACH SLAB REMOVED | 222 SY | $25.00 | $25.00 | $46.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $100,000 | $45,000 | $55,000 |
| 503E21100 UNCLASSIFIED EXCAVATION | 273 CY | $257 | $120 | $130 |
| 504E11101 STEEL SHEET PILING LEFT IN PLACE, AS PER PLAN (SEC | 576 SF | $35.00 | $25.00 | $15.00 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $25,000 | $25,000 | $28,000 |
| 507E00600 14" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE | 1,620 FT | $33.00 | $31.00 | $5.00 |
| 507E00650 14" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 1,740 FT | $45.00 | $50.00 | $68.00 |
| 507E93300 STEEL POINTS OR SHOES | 24 EACH | $150 | $397 | $350 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 82,143 LB | $1.80 | $1.80 | $1.40 |
| 509E30020 NO. 4 DEFORMED GFRP REINFORCEMENT | 4,966 FT | $1.50 | $1.50 | $1.40 |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 392 CY | $900 | $900 | $820 |
| 511E34451 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 48 CY | $900 | $950 | $980 |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 193 CY | $750 | $800 | $625 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 512 SY | $24.00 | $21.00 | $21.00 |
| 512E33000 TYPE 2 WATERPROOFING | 25 SY | $26.00 | $35.00 | $40.00 |
| 515E15100 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 8 EACH | $69,000 | $80,000 | $65,000 |
| 515E20000 INTERMEDIATE DIAPHRAGMS | 21 EACH | $3,500 | $1,925 | $2,500 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 137 SF | $9.00 | $3.80 | $12.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 137 SF | $10.00 | $9.00 | $13.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 150 SF | $12.00 | $18.00 | $14.00 |
| 516E14014 INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 156 FT | $38.00 | $30.00 | $30.00 |
| 516E44001 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 16 EACH | $2,000 | $2,500 | $2,200 |
| 518E12301 SCUPPERS, INCLUDING SUPPORTS, AS PER PLAN | 7 EACH | $3,500 | $4,400 | $5,000 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 137 CY | $100 | $115 | $125 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 190 FT | $3.00 | $9.50 | $12.00 |
| 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 60 FT | $15.00 | $26.25 | $18.00 |
| 523E20000 DYNAMIC LOAD TESTING | 2 EACH | $4,000 | $3,800 | $3,200 |
| 526E25001 REINFORCED CONCRETE APPROACH SLABS (T=15"), AS PER | 330 SY | $400 | $375 | $310 |
| 526E90010 TYPE A INSTALLATION | 129 FT | $200 | $200 | $190 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 313 CY | $100 | $150 | $85.00 |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 54 CF | $600 | $450 | $465 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $100,000 | $45,000 | $125,000 |
| 202E22900 APPROACH SLAB REMOVED | 222 SY | $25.00 | $25.00 | $46.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $100,000 | $15,000 | $45,000 |
| 503E21100 UNCLASSIFIED EXCAVATION | 273 CY | $200 | $120 | $160 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $25,000 | $15,000 | $24,000 |
| 507E00600 14" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE | 1,620 FT | $33.00 | $27.00 | $5.00 |
| 507E00650 14" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 1,740 FT | $45.00 | $50.00 | $68.00 |
| 507E93300 STEEL POINTS OR SHOES | 24 EACH | $150 | $397 | $350 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 82,509 LB | $1.50 | $1.60 | $1.30 |
| 509E30020 NO. 4 DEFORMED GFRP REINFORCEMENT | 4,966 FT | $1.50 | $1.50 | $1.40 |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 388 CY | $850 | $800 | $770 |
| 511E34451 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 48 CY | $550 | $790 | $970 |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 193 CY | $750 | $760 | $620 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 509 SY | $24.00 | $21.00 | $21.00 |
| 512E33000 TYPE 2 WATERPROOFING | 17 SY | $25.00 | $39.00 | $40.00 |
| 515E15100 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 8 EACH | $69,000 | $75,000 | $64,000 |
| 515E20000 INTERMEDIATE DIAPHRAGMS | 21 EACH | $3,500 | $1,925 | $2,500 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 137 SF | $9.00 | $3.80 | $12.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 137 SF | $10.00 | $9.00 | $13.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 150 SF | $12.00 | $18.00 | $14.00 |
| 516E14014 INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 156 FT | $38.00 | $30.00 | $30.00 |
| 516E44001 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 16 EACH | $2,100 | $2,500 | $2,200 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 135 CY | $100 | $108 | $120 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 190 FT | $3.00 | $9.50 | $12.00 |
| 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 60 FT | $15.00 | $27.00 | $18.00 |
| 526E25001 REINFORCED CONCRETE APPROACH SLABS (T=15"), AS PER | 330 SY | $375 | $325 | $300 |
| 526E90010 TYPE A INSTALLATION | 129 FT | $165 | $180 | $180 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 314 CY | $90.00 | $150 | $85.00 |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 54 CF | $600 | $450 | $465 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $250,000 | $200,000 | $360,000 |
| 202E22900 APPROACH SLAB REMOVED | 192 SY | $26.00 | $30.00 | $65.00 |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $55,000 | $50,000 | $40,000 |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 206 CY | $250 | $180 | $50.00 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $25,000 | $25,000 | $60,000 |
| 507E00500 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE | 4,270 FT | $25.00 | $28.00 | $6.00 |
| 507E00550 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 4,620 FT | $40.00 | $47.00 | $80.00 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 165,845 LB | $2.00 | $1.80 | $1.80 |
| 509E30020 NO. 4 DEFORMED GFRP REINFORCEMENT | 10,389 FT | $1.50 | $1.50 | $1.20 |
| 511E33415 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, AS | 47 CY | $1,500 | $825 | $830 |
| 511E33500 SEMI-INTEGRAL DIAPHRAGM GUIDE | 2 EACH | $2,750 | $3,850 | $5,000 |
| 511E34447 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK, AS PER | 380 CY | $1,100 | $1,380 | $1,200 |
| 511E34451 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 102 CY | $525 | $665 | $825 |
| 511E40512 CLASS QC1 CONCRETE WITH QC/QA, PIER ABOVE FOOTINGS | 117 CY | $1,750 | $1,265 | $1,350 |
| 511E44112 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT NOT INCLUD | 58 CY | $900 | $1,415 | $1,150 |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 188 CY | $900 | $600 | $650 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 2,034 SY | $24.00 | $20.00 | $20.00 |
| 512E33000 TYPE 2 WATERPROOFING | 16 SY | $25.00 | $30.00 | $40.00 |
| 515E15010 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 12 EACH | $32,500 | $33,000 | $32,500 |
| 515E15010 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 12 EACH | $32,500 | $33,750 | $32,500 |
| 515E20000 INTERMEDIATE DIAPHRAGMS | 40 EACH | $3,400 | $1,175 | $2,500 |
| 516E10010 ARMORLESS PREFORMED JOINT SEAL | 67 FT | $85.00 | $58.00 | $55.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 9 SF | $4.00 | $20.00 | $9.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 207 SF | $12.00 | $12.00 | $14.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 80 FT | $40.00 | $34.00 | $35.00 |
| 516E44201 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 12 EACH | $2,500 | $2,885 | $3,250 |
| 516E44201 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 36 EACH | $1,600 | $1,885 | $2,000 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 46 CY | $100 | $160 | $150 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 90 FT | $3.00 | $11.00 | $15.00 |
| 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 24 FT | $25.00 | $98.00 | $50.00 |
| 523E20000 DYNAMIC LOAD TESTING | 2 EACH | $4,000 | $3,750 | $4,000 |
| 526E25001 REINFORCED CONCRETE APPROACH SLABS (T=15"), AS PER | 197 SY | $500 | $370 | $360 |
| 526E90031 TYPE C INSTALLATION, AS PER PLAN | 68 FT | $325 | $250 | $350 |
| 601E20001 CRUSHED AGGREGATE SLOPE PROTECTION, AS PER PLAN | 100 SY | $60.00 | $83.50 | $40.00 |
| 607E39900 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI | 582 FT | $100 | $97.00 | $107 |
| 625E33000 STRUCTURE GROUNDING SYSTEM | 1 EACH | $17,000 | $5,250 | $9,100 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $177,500 | $200,000 | $235,000 |
| 202E22900 APPROACH SLAB REMOVED | 156 SY | $45.00 | $25.00 | $50.00 |
| 204E30010 GRANULAR MATERIAL, TYPE B | 20 CY | $126 | $80.00 | $80.00 |
| 204E50000 GEOTEXTILE FABRIC | 313 SY | $5.00 | $2.80 | $3.50 |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 535 CY | $40.00 | $47.50 | $60.00 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 103,072 LB | $1.75 | $1.55 | $1.50 |
| 509E25000 UNCOATED STEEL REINFORCEMENT | 642 LB | $1.60 | $1.10 | $1.25 |
| 509E30020 NO. 4 DEFORMED GFRP REINFORCEMENT | 10,588 FT | $1.50 | $1.50 | $1.20 |
| 510E10001 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, AS | 164 EACH | $15.00 | $21.80 | $25.00 |
| 511E33501 SEMI-INTEGRAL DIAPHRAGM GUIDE, AS PER PLAN | 2 EACH | $4,400 | $3,450 | $5,000 |
| 511E34413 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, AS | 31 CY | $1,000 | $750 | $950 |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 267 CY | $1,200 | $1,030 | $1,225 |
| 511E34451 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 103 CY | $850 | $625 | $750 |
| 511E46210 CLASS QC1 CONCRETE, RETAINING/WINGWALL INCLUDING F | 31 CY | $1,150 | $1,450 | $1,500 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 1,001 SY | $22.50 | $21.00 | $21.00 |
| 512E33000 TYPE 2 WATERPROOFING | 8 SY | $50.00 | $47.00 | $50.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 2,904 EACH | $4.60 | $6.00 | $5.00 |
| 513E95030 STRUCTURAL STEEL, MISC.: 2'' DIA. FIELD DRILLED HO | 24 EACH | $75.00 | $72.58 | $75.00 |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 11,900 SF | $10.70 | $11.00 | $10.00 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 11,900 SF | $3.25 | $3.00 | $3.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 11,800 SF | $3.25 | $3.00 | $3.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 11,800 SF | $3.25 | $3.00 | $3.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 19 MNHR | $100 | $100 | $100 |
| 514E10000 FINAL INSPECTION REPAIR | 12 EACH | $400 | $400 | $400 |
| 516E10010 ARMORLESS PREFORMED JOINT SEAL | 70 FT | $80.00 | $57.00 | $50.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 20 SF | $10.00 | $23.00 | $9.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 140 SF | $12.00 | $14.00 | $14.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 65 FT | $60.00 | $29.00 | $35.00 |
| 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 8 EACH | $1,300 | $1,800 | $1,750 |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $7,000 | $5,950 | $15,000 |
| 518E21201 POROUS BACKFILL WITH GEOTEXTILE FABRIC, AS PER PLA | 32 CY | $115 | $200 | $150 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 65 FT | $10.00 | $12.00 | $15.00 |
| 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 48 FT | $20.00 | $50.00 | $45.00 |
| 519E00100 SPECIAL - COMPOSITE FIBER WRAP SYSTEM | 1,248 SF | $34.50 | $35.00 | $34.50 |
| 526E25010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 175 SY | $375 | $325 | $325 |
| 526E90031 TYPE C INSTALLATION, AS PER PLAN | 66 FT | $360 | $215 | $350 |
| 601E20001 CRUSHED AGGREGATE SLOPE PROTECTION, AS PER PLAN | 100 SY | $62.00 | $72.50 | $35.00 |
| 607E39900 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI | 570 FT | $86.00 | $97.00 | $107 |
| 625E33000 STRUCTURE GROUNDING SYSTEM | 1 EACH | $12,000 | $5,140 | $9,100 |
| 840E23000 SELECT GRANULAR BACKFILL | 227 CY | $53.00 | $58.50 | $80.00 |
| 863E00100 GEOGRID, TYPE P1 | 971 SY | $7.00 | $3.60 | $3.50 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $175,000 | $200,000 | $105,000 |
| 202E22900 APPROACH SLAB REMOVED | 148 SY | $45.00 | $30.00 | $45.00 |
| 204E30010 GRANULAR MATERIAL, TYPE B | 29 CY | $129 | $84.00 | $100 |
| 204E50000 GEOTEXTILE FABRIC | 370 SY | $5.00 | $2.80 | $4.00 |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 509 CY | $40.00 | $60.00 | $40.00 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 104,753 LB | $1.70 | $1.60 | $1.35 |
| 509E20001 CONCRETE REINFORCEMENT, REPLACEMENT OF EXISTING CO | 15 LB | $5.00 | $16.50 | $10.00 |
| 509E25000 UNCOATED STEEL REINFORCEMENT | 564 LB | $1.65 | $1.10 | $1.65 |
| 509E30020 NO. 4 DEFORMED GFRP REINFORCEMENT | 10,078 FT | $1.36 | $1.50 | $1.40 |
| 510E10001 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, AS | 216 EACH | $14.00 | $21.00 | $25.00 |
| 511E33501 SEMI-INTEGRAL DIAPHRAGM GUIDE, AS PER PLAN | 2 EACH | $4,400 | $4,700 | $3,500 |
| 511E34413 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, AS | 28 CY | $950 | $800 | $870 |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 271 CY | $1,150 | $1,000 | $1,100 |
| 511E34451 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 100 CY | $900 | $640 | $860 |
| 511E46210 CLASS QC1 CONCRETE, RETAINING/WINGWALL INCLUDING F | 41 CY | $1,400 | $1,350 | $1,100 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 967 SY | $24.00 | $21.00 | $21.00 |
| 512E33000 TYPE 2 WATERPROOFING | 32 SY | $45.00 | $48.00 | $40.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 3,336 EACH | $4.60 | $6.00 | $5.00 |
| 513E95030 STRUCTURAL STEEL, MISC.: 2" DIA. FIELD DRILLED HO | 32 EACH | $75.00 | $75.00 | $80.00 |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 12,036 SF | $10.70 | $11.00 | $10.00 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 12,036 SF | $3.25 | $3.00 | $3.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 11,885 SF | $3.25 | $3.00 | $3.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 11,885 SF | $3.25 | $3.00 | $3.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 19 MNHR | $100 | $100 | $100 |
| 514E10000 FINAL INSPECTION REPAIR | 12 EACH | $425 | $400 | $400 |
| 516E10010 ARMORLESS PREFORMED JOINT SEAL | 58 FT | $80.00 | $60.00 | $45.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 17 SF | $10.00 | $23.00 | $13.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 131 SF | $12.00 | $15.00 | $14.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 125 FT | $60.00 | $26.00 | $30.00 |
| 516E44201 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 8 EACH | $1,500 | $2,000 | $1,700 |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $8,500 | $6,075 | $10,000 |
| 518E21201 POROUS BACKFILL WITH GEOTEXTILE FABRIC, AS PER PLA | 23 CY | $125 | $190 | $175 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 66 FT | $12.00 | $16.75 | $12.00 |
| 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 100 FT | $14.00 | $36.00 | $18.00 |
| 519E00100 SPECIAL - COMPOSITE FIBER WRAP SYSTEM (SEE PROPOSA | 1,236 SF | $34.50 | $35.00 | $34.50 |
| 526E25010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 175 SY | $375 | $320 | $320 |
| 526E90031 TYPE C INSTALLATION, AS PER PLAN | 63 FT | $360 | $225 | $250 |
| 601E20001 CRUSHED AGGREGATE SLOPE PROTECTION, AS PER PLAN | 35 SY | $66.00 | $83.00 | $75.00 |
| 607E39900 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI | 550 FT | $96.00 | $97.00 | $107 |
| 625E33000 STRUCTURE GROUNDING SYSTEM | 1 EACH | $12,750 | $5,225 | $9,100 |
| 840E23000 SELECT GRANULAR BACKFILL | 223 CY | $67.00 | $59.50 | $100 |
| 863E00100 GEOGRID, TYPE P1 | 1,130 SY | $7.00 | $3.60 | $5.00 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $87,000 | $200,000 | $105,000 |
| 202E22900 APPROACH SLAB REMOVED | 148 SY | $19.00 | $30.00 | $45.00 |
| 204E30010 GRANULAR MATERIAL, TYPE B | 26 CY | $114 | $88.00 | $100 |
| 204E50000 GEOTEXTILE FABRIC | 382 SY | $3.00 | $2.80 | $4.00 |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 553 CY | $26.00 | $50.00 | $40.00 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 106,584 LB | $1.30 | $1.60 | $1.35 |
| 509E20001 CONCRETE REINFORCEMENT, REPLACEMENT OF EXISTING CO | 15 LB | $1.75 | $16.50 | $10.00 |
| 509E25000 UNCOATED STEEL REINFORCEMENT | 770 LB | $1.30 | $1.05 | $1.65 |
| 509E30020 NO. 4 DEFORMED GFRP REINFORCEMENT | 10,310 FT | $1.25 | $1.50 | $1.40 |
| 510E10001 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, AS | 216 EACH | $26.00 | $21.00 | $30.00 |
| 511E33501 SEMI-INTEGRAL DIAPHRAGM GUIDE, AS PER PLAN | 2 EACH | $2,250 | $3,475 | $3,500 |
| 511E34413 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, AS | 28 CY | $823 | $825 | $870 |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 278 CY | $775 | $1,000 | $1,100 |
| 511E34451 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 101 CY | $412 | $640 | $800 |
| 511E46210 CLASS QC1 CONCRETE, RETAINING/WINGWALL INCLUDING F | 41 CY | $1,000 | $1,350 | $1,100 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 992 SY | $22.50 | $21.00 | $21.00 |
| 512E33000 TYPE 2 WATERPROOFING | 32 SY | $25.00 | $48.00 | $40.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 3,408 EACH | $5.00 | $6.00 | $5.00 |
| 513E95030 STRUCTURAL STEEL, MISC.:2'' DIA. FIELD DRILLED HOL | 32 EACH | $50.00 | $75.00 | $80.00 |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 12,296 SF | $10.70 | $11.00 | $10.00 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 12,296 SF | $3.25 | $3.00 | $3.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 12,145 SF | $3.25 | $3.00 | $3.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 12,145 SF | $3.25 | $3.00 | $3.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 19 MNHR | $100 | $100 | $100 |
| 514E10000 FINAL INSPECTION REPAIR | 13 EACH | $400 | $400 | $400 |
| 516E10010 ARMORLESS PREFORMED JOINT SEAL | 59 FT | $80.00 | $60.00 | $45.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 17 SF | $9.00 | $23.00 | $13.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 133 SF | $9.00 | $15.00 | $14.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 127 FT | $34.00 | $25.00 | $30.00 |
| 516E44201 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 8 EACH | $1,600 | $1,990 | $1,700 |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $7,500 | $6,075 | $10,000 |
| 518E21201 POROUS BACKFILL WITH GEOTEXTILE FABRIC, AS PER PLA | 23 CY | $105 | $190 | $175 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 70 FT | $3.00 | $16.00 | $12.00 |
| 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 100 FT | $13.00 | $36.00 | $18.00 |
| 519E00100 SPECIAL - COMPOSITE FIBER WRAP SYSTEM (SEE PROPOSA | 1,239 SF | $34.50 | $35.00 | $34.50 |
| 526E25010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 175 SY | $325 | $320 | $320 |
| 526E90031 TYPE C INSTALLATION, AS PER PLAN | 64 FT | $225 | $220 | $250 |
| 601E20001 CRUSHED AGGREGATE SLOPE PROTECTION, AS PER PLAN | 40 SY | $25.00 | $76.00 | $75.00 |
| 607E39900 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI | 565 FT | $96.00 | $97.00 | $107 |
| 625E33000 STRUCTURE GROUNDING SYSTEM | 1 EACH | $13,000 | $5,225 | $9,100 |
| 840E23000 SELECT GRANULAR BACKFILL | 236 CY | $140 | $58.00 | $100 |
| 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA | 25 SF | $80.00 | $149 | $115 |
| 863E00100 GEOGRID, TYPE P1 | 1,197 SY | $3.00 | $3.60 | $5.00 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $125,000 | $250,000 | $140,000 |
| 202E22900 APPROACH SLAB REMOVED | 148 SY | $25.00 | $30.00 | $45.00 |
| 204E30010 GRANULAR MATERIAL, TYPE B | 42 CY | $90.00 | $89.00 | $100 |
| 204E50000 GEOTEXTILE FABRIC | 500 SY | $3.00 | $2.80 | $4.00 |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 573 CY | $30.00 | $50.00 | $40.00 |
| 509E20001 CONCRETE REINFORCEMENT, REPLACEMENT OF EXISTING CO | 14 LB | $3.00 | $17.00 | $10.00 |
| 509E25000 UNCOATED STEEL REINFORCEMENT | 856 LB | $2.00 | $1.05 | $1.65 |
| 510E10001 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, AS | 240 EACH | $25.00 | $22.00 | $30.00 |
| 511E33501 SEMI-INTEGRAL DIAPHRAGM GUIDE, AS PER PLAN | 2 EACH | $2,225 | $3,450 | $3,500 |
| 511E34413 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, AS | 40 CY | $750 | $740 | $870 |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 312 CY | $900 | $985 | $1,100 |
| 511E34451 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 113 CY | $400 | $600 | $800 |
| 511E46210 CLASS QC1 CONCRETE, RETAINING/WINGWALL INCLUDING F | 45 CY | $1,300 | $1,350 | $1,100 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 1,095 SY | $24.00 | $21.00 | $21.00 |
| 512E33000 TYPE 2 WATERPROOFING | 37 SY | $26.00 | $42.00 | $45.00 |
| 513E10201 STRUCTURAL STEEL MEMBERS, LEVEL UF, AS PER PLAN | 1,558 LB | $10.00 | $13.00 | $9.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 2,868 EACH | $5.00 | $6.00 | $5.00 |
| 513E95030 STRUCTURAL STEEL, MISC.: 2'' DIA. FIELD DRILLED HO | 40 EACH | $50.00 | $72.50 | $80.00 |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 20,103 SF | $12.75 | $12.00 | $12.00 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 20,103 SF | $4.00 | $3.50 | $3.75 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 19,959 SF | $4.00 | $3.50 | $3.75 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 19,959 SF | $4.00 | $3.50 | $3.75 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 22 MNHR | $100 | $100 | $100 |
| 514E10000 FINAL INSPECTION REPAIR | 15 EACH | $425 | $400 | $400 |
| 516E10010 ARMORLESS PREFORMED JOINT SEAL | 66 FT | $80.00 | $57.50 | $45.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 17 SF | $9.00 | $23.00 | $13.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 220 SF | $12.00 | $13.00 | $14.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 140 FT | $33.00 | $25.00 | $30.00 |
| 516E44201 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 8 EACH | $1,750 | $2,000 | $1,700 |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $8,000 | $9,900 | $10,000 |
| 518E21201 POROUS BACKFILL WITH GEOTEXTILE FABRIC, AS PER PLA | 11 CY | $130 | $305 | $175 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 76 FT | $3.00 | $13.50 | $12.00 |
| 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 100 FT | $15.00 | $35.50 | $18.00 |
| 519E00100 SPECIAL - COMPOSITE FIBER WRAP SYSTEM (SEE PROPOSA | 1,288 SF | $34.50 | $35.00 | $34.50 |
| 526E25010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 175 SY | $350 | $320 | $320 |
| 526E90031 TYPE C INSTALLATION, AS PER PLAN | 67 FT | $250 | $220 | $250 |
| 601E20001 CRUSHED AGGREGATE SLOPE PROTECTION, AS PER PLAN | 55 SY | $32.00 | $75.00 | $75.00 |
| 607E39900 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI | 642 FT | $101 | $97.00 | $107 |
| 625E33000 STRUCTURE GROUNDING SYSTEM | 1 EACH | $13,000 | $5,100 | $9,100 |
| 840E23000 SELECT GRANULAR BACKFILL | 320 CY | $125 | $56.00 | $100 |
| 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA | 14 SF | $80.00 | $177 | $115 |
| 863E00100 GEOGRID, TYPE P1 | 1,568 SY | $3.00 | $3.60 | $5.00 |
| AA2 509E10000 EPOXY COATED STEEL REINFORCEMENT (ALTERNATE 2) | 29,781 LB | $1.50 | $1.60 | $1.30 |
| AA2 509E30020 NO. 4 DEFORMED GFRP REINFORCEMENT (ALTERNATE 2) | 33,180 FT | $1.40 | $1.50 | $1.26 |
| AA2 509E30030 NO. 5 DEFORMED GFRP REINFORCEMENT (ALTERNATE 2) | 54,085 FT | $1.90 | $2.50 | $1.77 |
| AA2 509E30040 NO. 6 DEFORMED GFRP REINFORCEMENT (ALTERNATE 2) | 26,855 FT | $3.00 | $3.30 | $2.80 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 3,390 CY | $75.00 | $105 | $117 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 1,500 HOUR | $90.00 | $100 | $105 |
| 614E11300 SPECIAL - WORK ZONE TRAFFIC SIGNAL | 2 EACH | $65,000 | $40,000 | $57,000 |
| 614E11630 INCREASED BARRIER DELINEATION | 10,378 FT | $0.70 | $0.30 | $2.73 |
| 614E12200 SPECIAL - WORK ZONE GUARDRAIL | 412.5 FT | $32.00 | $30.00 | $31.00 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,300 | $2,140 | $2,388 |
| 614E12420 DETOUR SIGNING | 1 LS | $27,000 | $30,000 | $21,110 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 39 EACH | $660 | $650 | $250 |
| 614E12500 REPLACEMENT SIGN | 10 EACH | $480 | $370 | $237 |
| 614E12600 REPLACEMENT DRUM | 300 EACH | $69.00 | $60.00 | $84.92 |
| 614E12756 WORK ZONE CROSSOVER LIGHTING SYSTEM | 3 EACH | $84,000 | $70,000 | $48,150 |
| 614E12801 WORK ZONE RAISED PAVEMENT MARKER, AS PER PLAN | 4,233 EACH | $25.00 | $39.80 | $39.62 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (ONE-WAY) | 3,288 EACH | $9.00 | $6.00 | $21.28 |
| 614E13312 BARRIER REFLECTOR, TYPE 2 (ONE-WAY) | 97 EACH | $9.00 | $18.00 | $21.27 |
| 614E13350 OBJECT MARKER, ONE WAY | 1,933 EACH | $16.00 | $17.00 | $21.28 |
| 614E13360 OBJECT MARKER, TWO WAY | 860 EACH | $17.00 | $18.75 | $21.28 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 72 SNMT | $900 | $600 | $550 |
| 614E20056 WORK ZONE LANE LINE, CLASS I, 6", 807 PAINT | 30.91 MILE | $1,200 | $1,106 | $600 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 0.44 MILE | $2,600 | $2,950 | $1,380 |
| 614E22056 WORK ZONE EDGE LINE, CLASS I, 6", 807 PAINT | 89.13 MILE | $3,200 | $2,130 | $2,320 |
| 614E22100 WORK ZONE EDGE LINE, CLASS I, 4", 642 PAINT | 1.63 MILE | $1,600 | $2,000 | $735 |
| 614E23110 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 807 PAI | 6,573 FT | $2.60 | $1.35 | $1.55 |
| 614E24102 WORK ZONE DOTTED LINE, CLASS I, 6", 807 PAINT | 10,016 FT | $2.20 | $0.85 | $1.25 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 40 FT | $3.70 | $4.00 | $4.50 |
| 614E32658 WORK ZONE SPEED MEASUREMENT MARKING, CLASS I, 642 | 45 EACH | $160 | $360 | $75.00 |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 15,308 SY | $55.00 | $68.00 | $59.27 |
| 616E10000 WATER | 1,320 MGAL | $64.00 | $80.00 | $17.85 |
| 618E41000 RUMBLE STRIPES, EDGE LINE (ASPHALT CONCRETE) | 35.44 MILE | $650 | $976 | $685 |
| 622E41050 PORTABLE BARRIER, "Y" CONNECTOR | 1 EACH | $3,100 | $1,500 | $4,515 |
| 622E41110 PORTABLE BARRIER, ANCHORED | 1,992 FT | $28.00 | $35.00 | $31.61 |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 392 SNMT | $460 | $480 | $475 |
| 829E00100 WORK ZONE EGRESS WARNING SYSTEM | 60 SNMT | $1,600 | $1,250 | $3,515 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $200,000 | $180,000 | $278,488 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 32.54 MILE | $800 | $685 | $865 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 32.54 MILE | $1,500 | $895 | $2,270 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 3,140 FT | $2.00 | $1.50 | $1.00 |
| 614E24612 WORK ZONE DOTTED LINE, CLASS III, 6", 642 PAINT | 3,216 FT | $1.30 | $1.00 | $0.85 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $124,000 | $50,000 | $61,727 |
| 202E11000 STRUCTURE REMOVED | 1 LS | $7,500 | $80,000 | $39,597 |
| 202E20010 HEADWALL REMOVED | 21 EACH | $225 | $800 | $972 |
| 202E23000 PAVEMENT REMOVED | 139,660 SY | $6.00 | $5.50 | $9.80 |
| 202E30700 CONCRETE BARRIER REMOVED | 77 FT | $17.00 | $12.00 | $40.96 |
| 202E32000 CURB REMOVED | 734 FT | $5.00 | $5.00 | $11.44 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 4,004 FT | $16.00 | $18.50 | $48.57 |
| 202E35200 PIPE REMOVED, OVER 24" | 20 FT | $59.00 | $110 | $156 |
| 202E38000 GUARDRAIL REMOVED | 7,080 FT | $2.00 | $1.60 | $2.50 |
| 202E58100 CATCH BASIN REMOVED | 41 EACH | $350 | $425 | $597 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, 36" TYP | 184 FT | $63.00 | $80.00 | $78.28 |
| 202E75000 FENCE REMOVED | 680 FT | $2.00 | $2.30 | $5.75 |
| 203E10000 EXCAVATION | 27,916 CY | $12.50 | $20.00 | $16.25 |
| 203E20000 EMBANKMENT | 9,830 CY | $12.50 | $5.00 | $12.23 |
| 203E20001 EMBANKMENT, AS PER PLAN | 1,025 CY | $20.00 | $5.00 | $20.16 |
| 204E10000 SUBGRADE COMPACTION | 918 SY | $3.00 | $8.00 | $5.81 |
| 204E45000 PROOF ROLLING | 98 HOUR | $400 | $200 | $223 |
| 206E10500 CEMENT | 5,035 TON | $208 | $190 | $195 |
| 206E11000 CURING COAT | 194,573 SY | $1.10 | $1.10 | $1.10 |
| 206E15010 CEMENT STABILIZED SUBGRADE, 12 INCHES DEEP | 194,573 SY | $3.20 | $3.53 | $4.95 |
| 206E30000 MIXTURE DESIGN FOR CHEMICALLY STABILIZED SOILS | 1 LS | $31,500 | $34,000 | $30,000 |
| 209E10000 DITCH CLEANOUT | 200 FT | $33.00 | $10.00 | $30.35 |
| 606E15050 GUARDRAIL, TYPE MGS | 5,950 FT | $20.00 | $18.80 | $21.00 |
| 606E15550 GUARDRAIL, BARRIER DESIGN, TYPE MGS | 1,000 FT | $33.00 | $31.60 | $29.00 |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A | 1 EACH | $1,700 | $1,635 | $1,300 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 18 EACH | $2,750 | $2,585 | $2,350 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 11 EACH | $1,360 | $1,360 | $975 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 29 EACH | $2,450 | $2,450 | $2,250 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 4 EACH | $635 | $595 | $450 |
| 606E55010 SPECIAL - CABLE BARRIER WITH CONCRETE LINE POST FO | 14,394 FT | $42.00 | $42.50 | $59.50 |
| 606E55150 SPECIAL - CABLE BARRIER, ANCHOR ASSEMBLY | 14 EACH | $4,200 | $3,950 | $3,400 |
| 606E60012 IMPACT ATTENUATOR, TYPE 1 (BIDIRECTIONAL) | 8 EACH | $6,100 | $6,125 | $6,100 |
| 607E15000 FENCE, TYPE 47 | 994 FT | $22.00 | $19.50 | $13.00 |
| 607E70000 FENCELINE SEEDING AND MULCHING | 994 FT | $1.75 | $1.75 | $0.68 |
| 622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D | 108 FT | $175 | $175 | $200 |
| 622E25000 CONCRETE BARRIER END SECTION, TYPE D | 7 EACH | $5,000 | $3,400 | $6,352 |
| 622E25050 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 1 EACH | $5,000 | $3,800 | $6,351 |
| 623E38500 MONUMENT ASSEMBLY, TYPE C | 18 EACH | $1,500 | $1,230 | $1,050 |
| 601E10000 RIPRAP | 8 SY | $325 | $500 | $779 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 16.2 SY | $130 | $100 | $283 |
| 601E21060 TIED CONCRETE BLOCK MAT WITH TYPE 2 UNDERLAYMENT | 402 SY | $78.00 | $75.00 | $81.58 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 44 CY | $110 | $175 | $249 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 9 CY | $133 | $133 | $488 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 20 CY | $270 | $130 | $724 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $50.00 | $50.00 | $75.00 |
| 659E00300 TOPSOIL | 10,486 CY | $8.00 | $5.50 | $7.45 |
| 659E10000 SEEDING AND MULCHING | 94,473 SY | $0.50 | $0.44 | $0.68 |
| 659E14000 REPAIR SEEDING AND MULCHING | 4,724 SY | $0.50 | $0.40 | $0.68 |
| 659E15000 INTER-SEEDING | 4,724 SY | $0.01 | $0.01 | $0.48 |
| 659E20000 COMMERCIAL FERTILIZER | 13.18 TON | $535 | $500 | $950 |
| 659E31000 LIME | 19.52 ACRE | $50.00 | $50.00 | $10.00 |
| 659E35000 WATER | 523 MGAL | $0.01 | $0.01 | $0.50 |
| 659E40000 MOWING | 213 MSF | $2.00 | $1.72 | $6.00 |
| 670E00500 SLOPE EROSION PROTECTION | 15,838 SY | $2.00 | $1.72 | $2.25 |
| 670E00700 DITCH EROSION PROTECTION | 3,178 SY | $2.00 | $1.72 | $1.95 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $3,500 | $3,200 | $3,255 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $30,000 | $43,000 | $32,340 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $10,000 | $17,000 | $13,478 |
| 832E30000 EROSION CONTROL | 608,725 EACH | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 24.4 CY | $2,000 | $3,500 | $2,269 |
| 605E11100 6" SHALLOW PIPE UNDERDRAINS | 58,428 FT | $10.00 | $9.00 | $11.34 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 513 FT | $17.00 | $17.00 | $24.94 |
| 605E14000 6" BASE PIPE UNDERDRAINS | 59,367 FT | $8.00 | $7.00 | $8.58 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 2,643 FT | $18.00 | $30.00 | $34.94 |
| 611E00900 6" CONDUIT, TYPE B | 25 FT | $50.00 | $48.00 | $34.62 |
| 611E01400 6" CONDUIT, TYPE E | 25 FT | $50.00 | $48.00 | $34.62 |
| 611E01500 6" CONDUIT, TYPE F | 50 FT | $40.00 | $51.00 | $34.62 |
| 611E04600 12" CONDUIT, TYPE C | 16 FT | $97.00 | $160 | $179 |
| 611E05900 15" CONDUIT, TYPE B | 431 FT | $97.00 | $120 | $162 |
| 611E06100 15" CONDUIT, TYPE C | 758 FT | $78.00 | $83.00 | $103 |
| 611E06700 15" CONDUIT, TYPE F | 16 FT | $166 | $192 | $161 |
| 611E07400 18" CONDUIT, TYPE B | 594 FT | $113 | $150 | $133 |
| 611E07600 18" CONDUIT, TYPE C | 417 FT | $90.00 | $130 | $134 |
| 611E10400 24" CONDUIT, TYPE B | 461 FT | $128 | $150 | $170 |
| 611E10600 24" CONDUIT, TYPE C | 663 FT | $105 | $120 | $137 |
| 611E13400 30" CONDUIT, TYPE B | 310 FT | $150 | $210 | $320 |
| 611E54200 97" X 151" CONDUIT, TYPE A, 706.04 | 219 FT | $1,500 | $1,900 | $3,463 |
| 611E96600 CONDUIT, BORED OR JACKED, 36" TYP A | 210 FT | $800 | $860 | $730 |
| 611E98180 CATCH BASIN, NO. 3A | 1 EACH | $4,400 | $4,200 | $2,640 |
| 611E98300 CATCH BASIN, NO. 5 | 2 EACH | $5,200 | $3,300 | $4,584 |
| 611E98410 CATCH BASIN, NO. 8 | 21 EACH | $5,600 | $4,400 | $4,790 |
| 611E98470 CATCH BASIN, NO. 2-2B | 2 EACH | $3,100 | $3,000 | $1,752 |
| 611E98510 CATCH BASIN, NO. 2-3 | 1 EACH | $3,100 | $3,000 | $2,206 |
| 611E99574 MANHOLE, NO. 3 | 4 EACH | $5,500 | $5,600 | $4,931 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 9 EACH | $400 | $640 | $573 |
| 611E99900 DRAINAGE STRUCTURE, MISC.:BLIND TAP | 1 EACH | $1,160 | $1,300 | $2,658 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $75,000 | $60,000 | $185,292 |
| 251E01021 PARTIAL DEPTH PAVEMENT REPAIR (442), AS PER PLAN, | 200 SY | $93.00 | $35.00 | $75.25 |
| 251E01021 PARTIAL DEPTH PAVEMENT REPAIR (442), AS PER PLAN, | 800 SY | $68.00 | $60.00 | $80.25 |
| 251E01021 PARTIAL DEPTH PAVEMENT REPAIR (442), AS PER PLAN, | 6,000 SY | $66.00 | $50.00 | $85.65 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=1.5") | 14,258 SY | $5.00 | $3.00 | $1.74 |
| 407E20000 NON-TRACKING TACK COAT | 34,140 GAL | $3.50 | $3.25 | $4.00 |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 10,638 CY | $3.50 | $1.00 | $7.00 |
| 609E24510 CURB, TYPE 4-C | 396 FT | $81.00 | $44.00 | $45.51 |
| 618E40101 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE), AS PER | 600 FT | $15.00 | $20.00 | $21.26 |
| 618E40600 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 12.44 MILE | $625 | $1,000 | $625 |
| 442E22100 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 34 CY | $340 | $700 | $495 |
| 621E00100 RPM | 544 EACH | $36.00 | $33.75 | $33.55 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 284 EACH | $6.00 | $10.00 | $24.07 |
| 625E32000 GROUND ROD | 3 EACH | $340 | $315 | $435 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, (ONE-WAY) | 48 EACH | $11.00 | $10.00 | $9.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, (ONE-WAY) | 212 EACH | $11.00 | $11.00 | $9.00 |
| 626E00118 BARRIER REFLECTOR, TYPE 6 | 147 EACH | $14.00 | $12.90 | $15.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 87 FT | $14.00 | $13.50 | $11.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 40.5 FT | $17.00 | $16.00 | $12.50 |
| 630E04100 GROUND MOUNTED SUPPORT, NO. 4 POST | 30 FT | $20.00 | $19.00 | $15.00 |
| 630E07600 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X12 | 42 FT | $52.00 | $49.00 | $28.50 |
| 630E08600 SIGN POST REFLECTOR | 2 EACH | $52.00 | $49.00 | $42.00 |
| 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION | 2 EACH | $920 | $865 | $875 |
| 630E80100 SIGN, FLAT SHEET | 61 SF | $16.00 | $15.00 | $20.00 |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 90 SF | $23.00 | $22.00 | $24.50 |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 2 EACH | $850 | $795 | $1,350 |
| 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION | 3 EACH | $8,300 | $7,825 | $5,000 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 13 EACH | $10.00 | $10.00 | $15.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 10 EACH | $16.00 | $15.00 | $15.00 |
| 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT | 2 EACH | $198 | $185 | $350 |
| 642E00100 EDGE LINE, 4", TYPE 1 | 0.23 MILE | $4,000 | $3,762 | $3,100 |
| 642E00300 CENTER LINE, TYPE 1 | 0.11 MILE | $6,900 | $6,500 | $4,370 |
| 642E01312 LANE REDUCTION ARROW, TYPE 1 | 2 EACH | $530 | $500 | $200 |
| 648E00104 EDGE LINE, 6" | 18.2 MILE | $2,100 | $1,990 | $2,230 |
| 648E00204 LANE LINE, 6" | 18.2 MILE | $1,300 | $1,250 | $670 |
| 807E10010 WET REFLECTIVE TRAFFIC PAINT, EDGE LINE, 6" | 12.72 MILE | $2,600 | $2,520 | $3,365 |
| 807E10110 WET REFLECTIVE TRAFFIC PAINT, LANE LINE, 6" | 11.89 MILE | $1,300 | $1,280 | $1,055 |
| 807E10410 WET REFLECTIVE TRAFFIC PAINT, DOTTED LINE, 6" | 1,000 FT | $1.00 | $1.00 | $1.50 |
| 850E10010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $2,800 | $2,651 | $2,500 |
| 850E20010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $5,700 | $5,400 | $6,000 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $150,000 | $59,000 | $132,500 |
| 202E22900 APPROACH SLAB REMOVED | 230 SY | $48.00 | $25.00 | $50.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $50,000 | $1.00 | $55,000 |
| 503E21100 UNCLASSIFIED EXCAVATION | 153 CY | $150 | $130 | $50.00 |
| 504E11101 STEEL SHEET PILING LEFT IN PLACE, AS PER PLAN | 462 SF | $45.00 | $25.00 | $35.00 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $24,000 | $25,000 | $35,000 |
| 507E00500 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE | 1,450 FT | $11.00 | $20.00 | $5.00 |
| 507E00550 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 1,550 FT | $60.00 | $43.00 | $75.00 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 59,728 LB | $1.75 | $1.71 | $1.60 |
| 509E30020 NO. 4 DEFORMED GFRP REINFORCEMENT | 4,034 FT | $1.40 | $1.50 | $1.20 |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 226 CY | $1,150 | $1,150 | $1,400 |
| 511E34451 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 39 CY | $1,400 | $1,100 | $1,400 |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 104 CY | $875 | $850 | $750 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 367 SY | $23.00 | $21.00 | $21.00 |
| 512E33000 TYPE 2 WATERPROOFING | 20 SY | $45.00 | $41.00 | $50.00 |
| 515E15070 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 8 EACH | $45,000 | $49,000 | $47,500 |
| 515E20000 INTERMEDIATE DIAPHRAGMS | 21 EACH | $4,700 | $1,300 | $3,000 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 119 SF | $12.00 | $4.00 | $6.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 119 SF | $13.00 | $11.00 | $7.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 67 SF | $14.00 | $18.00 | $14.00 |
| 516E14014 INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 132 FT | $60.00 | $30.00 | $35.00 |
| 516E44001 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 16 EACH | $1,860 | $2,400 | $2,500 |
| 518E12301 SCUPPERS, INCLUDING SUPPORTS, AS PER PLAN | 7 EACH | $1,900 | $4,400 | $6,500 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 89 CY | $120 | $115 | $150 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 151 FT | $10.00 | $10.00 | $15.00 |
| 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 60 FT | $16.00 | $26.00 | $50.00 |
| 523E20000 DYNAMIC LOAD TESTING | 2 EACH | $6,400 | $3,800 | $4,000 |
| 526E25001 REINFORCED CONCRETE APPROACH SLABS (T=15"), AS PER | 330 SY | $375 | $370 | $325 |
| 526E90010 TYPE A INSTALLATION | 112 FT | $310 | $215 | $250 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 197 CY | $100 | $160 | $90.00 |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 47 CF | $428 | $450 | $428 |
| 507E93300 STEEL POINTS OR SHOES | 20 EACH | $295 | $380 | $350 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $85,000 | $37,000 | $87,500 |
| 202E22900 APPROACH SLAB REMOVED | 232 SY | $45.00 | $25.00 | $35.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $25,000 | $1.00 | $55,000 |
| 503E21100 UNCLASSIFIED EXCAVATION | 153 CY | $160 | $120 | $50.00 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $16,000 | $15,000 | $17,500 |
| 507E00500 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE | 1,450 FT | $10.00 | $21.00 | $5.00 |
| 507E00550 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 1,550 FT | $64.00 | $44.00 | $75.00 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 59,088 LB | $1.50 | $1.80 | $1.50 |
| 509E30020 NO. 4 DEFORMED GFRP REINFORCEMENT | 4,034 FT | $1.40 | $1.50 | $1.20 |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 226 CY | $950 | $950 | $1,100 |
| 511E34451 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 39 CY | $1,200 | $930 | $1,100 |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 104 CY | $850 | $850 | $700 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 367 SY | $23.00 | $21.00 | $21.00 |
| 512E33000 TYPE 2 WATERPROOFING | 11 SY | $45.00 | $38.00 | $50.00 |
| 515E15070 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 8 EACH | $43,000 | $44,750 | $42,382 |
| 515E20000 INTERMEDIATE DIAPHRAGMS | 21 EACH | $4,500 | $1,100 | $3,000 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 119 SF | $12.00 | $4.00 | $6.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 119 SF | $13.00 | $11.00 | $7.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 67 SF | $14.00 | $18.00 | $14.00 |
| 516E14014 INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 132 FT | $60.00 | $29.00 | $35.00 |
| 516E44001 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 16 EACH | $1,850 | $2,500 | $2,500 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 89 CY | $125 | $115 | $150 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 151 FT | $10.00 | $10.00 | $15.00 |
| 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 60 FT | $16.00 | $26.00 | $50.00 |
| 526E25001 REINFORCED CONCRETE APPROACH SLABS (T=15"), AS PER | 330 SY | $350 | $340 | $315 |
| 526E90010 TYPE A INSTALLATION | 112 FT | $213 | $200 | $205 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 197 CY | $100 | $170 | $90.00 |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 47 CF | $450 | $445 | $428 |
| 507E93300 STEEL POINTS OR SHOES | 20 EACH | $300 | $370 | $350 |
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $225,000 | $59,000 | $125,000 |
| 202E22900 APPROACH SLAB REMOVED | 246 SY | $55.00 | $25.00 | $50.00 |
| 203E35001 GRANULAR EMBANKMENT, AS PER PLAN | 1,338 CY | $50.00 | $65.00 | $65.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $40,000 | $1.00 | $50,000 |
| 503E21100 UNCLASSIFIED EXCAVATION | 1,274 CY | $50.00 | $20.00 | $20.00 |
| 504E11101 STEEL SHEET PILING LEFT IN PLACE, AS PER PLAN (SEC | 2,120 SF | $40.00 | $11.50 | $50.00 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 69,618 LB | $1.60 | $1.60 | $2.00 |
| 509E30020 NO. 4 DEFORMED GFRP REINFORCEMENT | 4,147 FT | $1.25 | $1.50 | $2.00 |
| 511E34448 CLASS QC2 CONCRETE, BRIDGE DECK (PARAPET) | 40 CY | $1,600 | $900 | $900 |
| 511E46012 CLASS QC1 CONCRETE WITH QC/QA, RETAINING/WINGWALL | 282 CY | $1,100 | $750 | $750 |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 396 CY | $475 | $500 | $500 |
| 511E46612 CLASS QC1 CONCRETE WITH QC/QA, HEADWALL | 6 CY | $3,800 | $800 | $800 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 998 SY | $23.00 | $20.00 | $20.00 |
| 512E33000 TYPE 2 WATERPROOFING | 186 SY | $25.00 | $25.00 | $25.00 |
| 512E33010 TYPE 3 WATERPROOFING | 282 SY | $35.00 | $35.00 | $35.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 153 SF | $11.00 | $5.00 | $5.00 |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $14,000 | $5,000 | $8,000 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 390 CY | $115 | $125 | $125 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 362 FT | $9.00 | $10.00 | $10.00 |
| 611E70001 CONDUIT, TYPE A, PRECAST REINFORCED CONCRETE THREE | 68 FT | $6,500 | $6,637 | $6,637 |
| 623E38501 MONUMENT ASSEMBLY, TYPE C, AS PER PLAN | 4 EACH | $900 | $110 | $590 |
| 867E00101 TEMPORARY WIRE FACED MECHANICALLY STABILIZED EARTH | 1 LS | $100,000 | $80,000 | $80,000 |
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $125,000 | $40,000 | $100,000 |
| 202E22900 APPROACH SLAB REMOVED | 246 SY | $58.00 | $25.00 | $50.00 |
| 203E35001 GRANULAR EMBANKMENT, AS PER PLAN | 1,784 CY | $47.00 | $65.00 | $65.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $50,000 | $1.00 | $50,000 |
| 503E21100 UNCLASSIFIED EXCAVATION | 1,274 CY | $50.00 | $20.00 | $20.00 |
| 504E11101 STEEL SHEET PILING LEFT IN PLACE, AS PER PLAN (SEC | 1,760 SF | $40.00 | $11.50 | $50.00 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 67,947 LB | $1.60 | $1.60 | $2.00 |
| 509E30020 NO. 4 DEFORMED GFRP REINFORCEMENT | 4,147 FT | $1.40 | $1.50 | $2.00 |
| 511E34448 CLASS QC2 CONCRETE, BRIDGE DECK (PARAPET) | 40 CY | $1,200 | $900 | $900 |
| 511E46012 CLASS QC1 CONCRETE WITH QC/QA, RETAINING/WINGWALL | 282 CY | $1,100 | $750 | $750 |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 396 CY | $450 | $500 | $500 |
| 511E46612 CLASS QC1 CONCRETE WITH QC/QA, HEADWALL | 6 CY | $3,800 | $800 | $800 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 998 SY | $22.50 | $20.00 | $40.00 |
| 512E33000 TYPE 2 WATERPROOFING | 186 SY | $48.00 | $25.00 | $25.00 |
| 512E33010 TYPE 3 WATERPROOFING | 282 SY | $80.00 | $35.00 | $35.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 153 SF | $12.00 | $5.00 | $5.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 392 CY | $120 | $125 | $125 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 362 FT | $9.00 | $10.00 | $10.00 |
| 611E70001 CONDUIT, TYPE A, PRECAST REINFORCED CONCRETE THREE | 68 FT | $6,500 | $6,637 | $6,637 |
| 623E38501 MONUMENT ASSEMBLY, TYPE C, AS PER PLAN | 4 EACH | $850 | $110 | $590 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $235,000 | $250,000 | $245,000 |
| 202E22900 APPROACH SLAB REMOVED | 247 SY | $60.00 | $25.00 | $45.00 |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $350,000 | $390,000 | $500,000 |
| 503E21100 UNCLASSIFIED EXCAVATION | 624 CY | $120 | $145 | $80.00 |
| 504E11101 STEEL SHEET PILING LEFT IN PLACE, AS PER PLAN | 1,337 SF | $45.00 | $16.00 | $10.00 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $27,000 | $25,000 | $30,000 |
| 507E00200 STEEL PILES HP12X53, FURNISHED | 3,100 FT | $56.00 | $44.00 | $49.50 |
| 507E00250 STEEL PILES HP12X53, DRIVEN | 2,780 FT | $10.00 | $19.50 | $5.00 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 112,592 LB | $1.80 | $1.80 | $1.53 |
| 509E10001 EPOXY COATED STEEL REINFORCEMENT, AS PER PLAN | 38,262 LB | $1.50 | $1.60 | $1.30 |
| 509E30020 NO. 4 DEFORMED GFRP REINFORCEMENT | 6,711 FT | $1.40 | $1.50 | $1.40 |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 335 CY | $1,100 | $1,125 | $1,000 |
| 511E34451 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 66 CY | $1,100 | $870 | $950 |
| 511E40513 CLASS QC1 CONCRETE WITH QC/QA, PIER ABOVE FOOTINGS | 159 CY | $1,160 | $1,000 | $1,200 |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 140 CY | $975 | $830 | $760 |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 134 CY | $500 | $430 | $450 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 1,090 SY | $24.00 | $21.00 | $21.00 |
| 512E33000 TYPE 2 WATERPROOFING | 30 SY | $35.00 | $41.00 | $45.00 |
| 513E10241 STRUCTURAL STEEL MEMBERS, LEVEL 2, AS PER PLAN | 222,000 LB | $2.62 | $2.40 | $2.31 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 6,120 EACH | $5.25 | $6.00 | $5.00 |
| 514E00061 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 970 SF | $21.00 | $20.00 | $20.00 |
| 514E00067 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, AS P | 970 SF | $21.00 | $20.00 | $20.00 |
| 516E10010 ARMORLESS PREFORMED JOINT SEAL | 114 FT | $80.00 | $52.00 | $45.00 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 100 SF | $10.00 | $5.00 | $12.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 117 SF | $12.00 | $9.00 | $13.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 45 SF | $14.00 | $20.00 | $14.00 |
| 516E14014 INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 138 FT | $60.00 | $29.00 | $30.00 |
| 516E44100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 16 EACH | $850 | $1,200 | $1,100 |
| 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 16 EACH | $1,350 | $1,900 | $1,600 |
| 518E12301 SCUPPERS, INCLUDING SUPPORTS, AS PER PLAN | 10 EACH | $1,900 | $4,000 | $5,000 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 117 CY | $128 | $115 | $125 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 164 FT | $11.00 | $10.00 | $12.00 |
| 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 80 FT | $14.00 | $31.00 | $18.00 |
| 523E20000 DYNAMIC LOAD TESTING | 2 EACH | $6,000 | $3,800 | $3,500 |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 330 SY | $350 | $360 | $335 |
| 526E90031 TYPE C INSTALLATION, AS PER PLAN | 114 FT | $300 | $250 | $250 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 283 CY | $105 | $160 | $75.00 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $135,000 | $175,000 | $230,000 |
| 202E22900 APPROACH SLAB REMOVED | 247 SY | $60.00 | $25.00 | $45.00 |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $250,000 | $200,000 | $450,000 |
| 503E21100 UNCLASSIFIED EXCAVATION | 633 CY | $120 | $135 | $80.00 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $27,000 | $15,000 | $30,000 |
| 507E00200 STEEL PILES HP12X53, FURNISHED | 3,100 FT | $56.00 | $43.00 | $49.50 |
| 507E00250 STEEL PILES HP12X53, DRIVEN | 2,780 FT | $10.00 | $14.00 | $5.00 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 140,733 LB | $1.50 | $1.60 | $1.37 |
| 509E10001 EPOXY COATED STEEL REINFORCEMENT, AS PER PLAN | 9,592 LB | $1.50 | $1.60 | $1.30 |
| 509E30020 NO. 4 DEFORMED GFRP REINFORCEMENT | 6,711 FT | $1.40 | $1.50 | $1.40 |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 335 CY | $1,000 | $1,000 | $970 |
| 511E34451 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 66 CY | $1,100 | $870 | $950 |
| 511E40513 CLASS QC1 CONCRETE WITH QC/QA, PIER ABOVE FOOTINGS | 159 CY | $1,100 | $1,000 | $1,200 |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 140 CY | $900 | $830 | $750 |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 134 CY | $500 | $400 | $425 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 1,090 SY | $24.00 | $21.00 | $21.00 |
| 512E33000 TYPE 2 WATERPROOFING | 20 SY | $35.00 | $41.00 | $45.00 |
| 513E10241 STRUCTURAL STEEL MEMBERS, LEVEL 2, AS PER PLAN | 222,000 LB | $2.57 | $2.30 | $2.26 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 6,120 EACH | $6.00 | $6.00 | $5.00 |
| 514E00061 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 970 SF | $21.00 | $20.00 | $20.00 |
| 514E00067 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, AS P | 970 SF | $21.00 | $20.00 | $20.00 |
| 516E10010 ARMORLESS PREFORMED JOINT SEAL | 114 FT | $80.00 | $52.00 | $45.00 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 100 SF | $10.00 | $5.00 | $12.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 117 SF | $11.00 | $9.00 | $13.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 45 SF | $14.00 | $20.00 | $14.00 |
| 516E14014 INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 138 FT | $60.00 | $29.00 | $30.00 |
| 516E44100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 16 EACH | $850 | $1,200 | $1,100 |
| 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 16 EACH | $1,350 | $1,900 | $1,600 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 117 CY | $120 | $115 | $125 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 164 FT | $11.00 | $10.00 | $12.00 |
| 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 50 FT | $14.00 | $32.00 | $18.00 |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 330 SY | $350 | $340 | $325 |
| 526E90031 TYPE C INSTALLATION, AS PER PLAN | 114 FT | $300 | $250 | $250 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 283 CY | $105 | $160 | $75.00 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $200,000 | $200,000 | $200,000 |
| 202E22900 APPROACH SLAB REMOVED | 156 SY | $45.00 | $25.00 | $45.00 |
| 204E30010 GRANULAR MATERIAL, TYPE B | 20 CY | $125 | $105 | $90.00 |
| 204E50000 GEOTEXTILE FABRIC | 313 SY | $5.00 | $2.80 | $3.50 |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 542 CY | $40.00 | $49.00 | $50.00 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 81,888 LB | $1.41 | $1.60 | $1.50 |
| 509E25000 UNCOATED STEEL REINFORCEMENT | 450 LB | $2.00 | $1.20 | $1.25 |
| 509E30020 NO. 4 DEFORMED GFRP REINFORCEMENT | 10,345 FT | $1.44 | $1.50 | $1.20 |
| 510E10001 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, AS | 128 EACH | $14.00 | $20.00 | $35.00 |
| 511E33501 SEMI-INTEGRAL DIAPHRAGM GUIDE, AS PER PLAN | 2 EACH | $4,500 | $3,500 | $5,000 |
| 511E34413 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, AS | 27 CY | $930 | $790 | $1,000 |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 260 CY | $1,160 | $1,100 | $1,200 |
| 511E34451 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 101 CY | $900 | $700 | $750 |
| 511E46210 CLASS QC1 CONCRETE, RETAINING/WINGWALL INCLUDING F | 31 CY | $1,500 | $1,700 | $1,500 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 987 SY | $23.00 | $21.00 | $21.00 |
| 512E33000 TYPE 2 WATERPROOFING | 20 SY | $35.00 | $50.00 | $40.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 2,904 EACH | $5.00 | $6.00 | $5.00 |
| 513E95030 STRUCTURAL STEEL, MISC.: 2" DIA. FILED DRILLED HOL | 24 EACH | $75.00 | $78.00 | $75.00 |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 11,700 SF | $11.00 | $11.00 | $10.00 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 11,700 SF | $3.25 | $4.00 | $3.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 11,600 SF | $3.25 | $4.00 | $3.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 11,600 SF | $3.25 | $4.00 | $3.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 19 MNHR | $107 | $100 | $100 |
| 514E10000 FINAL INSPECTION REPAIR | 12 EACH | $425 | $400 | $400 |
| 516E10010 ARMORLESS PREFORMED JOINT SEAL | 70 FT | $80.00 | $58.00 | $50.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 20 SF | $10.00 | $23.00 | $8.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 380 SF | $12.00 | $15.00 | $14.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 64 FT | $90.00 | $29.00 | $35.00 |
| 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 8 EACH | $1,320 | $1,800 | $1,850 |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $8,000 | $6,500 | $15,000 |
| 518E21201 POROUS BACKFILL WITH GEOTEXTILE FABRIC, AS PER PLA | 40 CY | $100 | $300 | $150 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 65 FT | $13.00 | $13.00 | $15.00 |
| 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 48 FT | $18.00 | $50.36 | $50.00 |
| 519E00100 SPECIAL - COMPOSITE FIBER WRAP SYSTEM (SEE PROPOSA | 1,248 SF | $35.00 | $35.00 | $34.50 |
| 526E25010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 175 SY | $350 | $350 | $325 |
| 526E90031 TYPE C INSTALLATION, AS PER PLAN | 66 FT | $360 | $250 | $350 |
| 601E20001 CRUSHED AGGREGATE SLOPE PROTECTION, AS PER PLAN | 100 SY | $60.00 | $76.00 | $30.00 |
| 607E39900 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI | 570 FT | $86.00 | $100 | $107 |
| 625E33000 STRUCTURE GROUNDING SYSTEM | 1 EACH | $12,000 | $5,400 | $9,100 |
| 840E23000 SELECT GRANULAR BACKFILL | 227 CY | $53.00 | $60.00 | $80.00 |
| 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA | 28 SF | $95.00 | $160 | $200 |
| 863E00100 GEOGRID, TYPE P1 | 971 SY | $7.00 | $3.60 | $3.50 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 1,238 CY | $76.00 | $105 | $117 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 750 HOUR | $85.00 | $100 | $105 |
| 614E11630 INCREASED BARRIER DELINEATION | 500 FT | $0.70 | $0.40 | $3.19 |
| 614E12200 SPECIAL - WORK ZONE GUARDRAIL | 275 FT | $32.00 | $30.00 | $31.00 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,300 | $2,140 | $3,345 |
| 614E12420 DETOUR SIGNING | 1 LS | $16,000 | $19,000 | $9,140 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 21 EACH | $660 | $650 | $250 |
| 614E12500 REPLACEMENT SIGN | 5 EACH | $480 | $370 | $237 |
| 614E12600 REPLACEMENT DRUM | 150 EACH | $160 | $60.00 | $84.92 |
| 614E12756 WORK ZONE CROSSOVER LIGHTING SYSTEM | 1 EACH | $78,000 | $70,000 | $52,450 |
| 614E12801 WORK ZONE RAISED PAVEMENT MARKER, AS PER PLAN | 2,192 EACH | $22.00 | $39.80 | $49.30 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, (ONE WAY) | 1,238 EACH | $12.00 | $6.00 | $21.28 |
| 614E13312 BARRIER REFLECTOR, TYPE 2, (ONE WAY) | 52 EACH | $13.00 | $18.00 | $21.27 |
| 614E13350 OBJECT MARKER, ONE WAY | 656 EACH | $16.00 | $16.00 | $21.28 |
| 614E13360 OBJECT MARKER, TWO WAY | 314 EACH | $16.00 | $19.00 | $21.28 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 72 SNMT | $910 | $600 | $550 |
| 614E20056 WORK ZONE LANE LINE, CLASS I, 6", 807 PAINT | 11.3 MILE | $1,200 | $1,106 | $600 |
| 614E22056 WORK ZONE EDGE LINE, CLASS I, 6", 807 PAINT | 24.4 MILE | $3,200 | $2,130 | $2,320 |
| 614E23110 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 807 PAI | 4,112 FT | $2.60 | $1.35 | $1.55 |
| 614E24102 WORK ZONE DOTTED LINE, CLASS I, 6", 807 PAINT | 1,115 FT | $2.20 | $0.85 | $1.25 |
| 614E32658 WORK ZONE SPEED MEASUREMENT MARKING, CLASS I, 642 | 15 EACH | $160 | $360 | $75.00 |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 11,892 SY | $58.00 | $68.00 | $58.92 |
| 615E20001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER | 19,617 SY | $59.00 | $60.00 | $53.37 |
| 616E10000 WATER | 254 MGAL | $66.00 | $80.00 | $17.59 |
| 618E41000 RUMBLE STRIPES, EDGE LINE (ASPHALT CONCRETE) | 12.1 MILE | $650 | $1,014 | $685 |
| 622E41011 PORTABLE BARRIER, 50", AS PER PLAN | 45,382 FT | $10.00 | $10.00 | $20.65 |
| 622E41110 PORTABLE BARRIER, ANCHORED | 607 FT | $23.00 | $35.00 | $48.52 |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 152 SNMT | $420 | $480 | $475 |
| 829E00100 WORK ZONE EGRESS WARNING SYSTEM | 40 SNMT | $1,600 | $1,250 | $3,515 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $150,000 | $100,000 | $209,482 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 12.2 MILE | $800 | $685 | $865 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 12.2 MILE | $1,500 | $895 | $2,270 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $750,000 | $950,000 | $919,486 |
| 108E10000 CPM PROGRESS SCHEDULE | 1 LS | $15,000 | $20,000 | $8,182 |
| 619E16020 FIELD OFFICE, TYPE C | 40 MNTH | $3,500 | $4,000 | $1,874 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $400,000 | $200,000 | $892,800 |
| 100E51100 DEPARTMENT'S SHARE OF THE DISPUTE RESOLUTION BOARD | 130,000 EACH | $1.00 | $1.00 | $1.00 |
| 111E10100 SPECIAL - DEPARTMENTS SHARE FACILITATED PARTNERING | 12,250 EACH | $1.00 | $1.00 | $1.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 302E56001 ASPHALT CONCRETE BASE, (449), AS PER PLAN (PG64-22 | 120,511 CY | $125 | $15.1M | 12% |
| 302E56001 ASPHALT CONCRETE BASE, (449), AS PER PLAN (PG64-22 | 44,429 CY | $125 | $5.55M | 4% |
| 304E20000 AGGREGATE BASE | 89,661 CY | $57 | $5.11M | 4% |
| 442E10300 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 22,376 CY | $194 | $4.34M | 3% |
| 442E10080 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 24,299 CY | $148 | $3.60M | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $3,000,000 | $3.00M | 2% |
| 203E10000 EXCAVATION | 211,637 CY | $14 | $2.96M | 2% |
| 206E10500 CEMENT | 13,894 TON | $200 | $2.78M | 2% |
| 202E23000 PAVEMENT REMOVED | 369,326 SY | $6 | $2.22M | 2% |
| 624E10000 MOBILIZATION | 1 LS | $2,000,000 | $2.00M | 2% |