PIK-CR 77-02.07 OBPP
PIK County · est $0.5M
Bid dateThursday, January 26—
PIK County · est $0.5M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 34 more items below.
| Item | Quantity | R1Allard Excavation LLC | R2Coopers Excavating LLC | R3George J Igel & CO INC | R4Sunesis Construction CO | R5Double Z Construction Company | R6Axis Civil Construction LLC | R7Heavy Highway Construction Company | R8LLC Alan Stone CO INC | R9Shelly & Sands INC | R10Complete General Construction Company | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 515E12031 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 6 EACH | $15,000 | $13,000 | $12,570 | $14,279 | $13,600 | $14,250 | $12,600 | $13,750 | $13,800 | $14,000 |
| Item | Quantity | R1Allard Excavation LLC | R2Coopers Excavating LLC | R3George J Igel & CO INC | R4Sunesis Construction CO | R5Double Z Construction Company | R6Axis Civil Construction LLC | R7Heavy Highway Construction Company | R8LLC Alan Stone CO INC | R9Shelly & Sands INC | R10Complete General Construction Company |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,200 | $1,000 | $1,000 | $1,290 | $5,200 | $5,500 | $7,500 | $16,000 | $2,100 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 21% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 83 CY | $484 | $600 | $710 | $671 | $650 | $850 | $600 | $900 | $1,200 | $1,000 | 9% |
| 511E31610 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 35 CY | $1,112 | $1,000 | $1,250 | $1,487 | $1,100 | $1,500 | $1,000 | $1,173 | $2,300 | $1,400 | 9% |
| 624E10000 MOBILIZATION | 1 LS | $35,000 | $40,000 | $20,000 | $31,517 | $40,000 | $20,000 | $30,001 | $19,000 | $26,000 | $20,000 | 8% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 12,392 LB | $2.40 | $1.75 | $1.70 | $2.45 | $1.75 | $2.00 | $1.75 | $2.34 | $2.75 | $2.00 | 7% |
| 526E10000 REINFORCED CONCRETE APPROACH SLABS (T=12") | 80 SY | $307 | $275 | $330 | $388 | $350 | $295 | $300 | $304 | $350 | $350 | 6% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 113 FT | $210 | $210 | $220 | $220 | $188 | $218 | $188 | $290 | $200 | $235 | 6% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 39 CY | $575 | $345 | $400 | $379 | $376 | $450 | $520 | $378 | $376 | $376 | 5% |
| 524E94604 DRILLED SHAFTS, 30" DIAMETER, INTO BEDROCK | 80 FT | $183 | $355 | $320 | $734 | $440 | $435 | $350 | $490 | $275 | $700 | 3% |
| 526E90010 TYPE A INSTALLATION | 56 FT | $244 | $175 | $180 | $169 | $170 | $250 | $150 | $300 | $200 | $275 | 3% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 20 CY | $585 | $325 | $470 | $482 | $478 | $410 | $516 | $364 | $478 | $478 | 3% |
| 516E42600 ELASTOMERIC BEARING PAD, MISC.:6"x2" ELASTOMERIC B | 56 FT | $184 | $134 | $125 | $157 | $125 | $160 | $20.00 | $170 | $145 | $127 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 749 SY | $13.45 | $6.25 | $7.00 | $20.18 | $20.00 | $12.00 | $12.00 | $11.70 | $20.00 | $20.00 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $9,500 | $20,000 | $3,000 | $0.01 | $4,000 | $5,000 | $30,000 | $5,000 | $3,800 | $7,500 | 2% |
| 524E94704 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK | 42 FT | $225 | $375 | $290 | $453 | $390 | $435 | $350 | $345 | $350 | $600 | 2% |
| 524E94702 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK | 40 FT | $232 | $375 | $230 | $447 | $275 | $435 | $350 | $485 | $375 | $550 | 2% |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $2,100 | $2,100 | $2,650 | $2,674 | $2,500 | $2,650 | $2,500 | $2,212 | $2,700 | $2,100 | 2% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $8,010 | $15,000 | $25,000 | $8,468 | $13,000 | $13,500 | $10,000 | $10,000 | $15,000 | $40,000 | 2% |
| 619E16000 FIELD OFFICE, TYPE A | 4 MNTH | $1,800 | $100 | $1,500 | $1,348 | $1,000 | $2,200 | $1,800 | $1,000 | $3,500 | $1,500 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $6,500 | $5,000 | $8,000 | $6,307 | $6,000 | $7,500 | $5,000 | $9,000 | $12,500 | $5,000 | 2% |
| $9,000 |
| 203E10000 EXCAVATION | 124 CY | $23.00 | $65.00 | $35.00 | $39.71 | $40.00 | $30.00 | $18.00 | $33.98 | $50.00 | $50.00 |
| 204E10000 SUBGRADE COMPACTION | 267 SY | $6.50 | $3.00 | $6.00 | $1.41 | $6.00 | $3.00 | $3.00 | $4.62 | $6.00 | $9.00 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 37.5 FT | $69.98 | $69.68 | $29.00 | $29.26 | $24.50 | $29.00 | $24.50 | $26.75 | $26.00 | $69.98 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 4 EACH | $1,200 | $1,200 | $1,275 | $1,287 | $1,400 | $1,275 | $1,400 | $1,217 | $1,500 | $1,200 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 57 CY | $94.00 | $98.00 | $90.00 | $118 | $105 | $120 | $100 | $234 | $180 | $150 |
| 659E00300 TOPSOIL | 93 CY | $47.00 | $36.50 | $8.00 | $20.57 | $30.00 | $40.00 | $150 | $45.00 | $55.00 | $25.00 |
| 659E10000 SEEDING AND MULCHING | 834 SY | $3.00 | $4.50 | $6.00 | $4.29 | $7.00 | $4.50 | $2.25 | $4.27 | $4.00 | $4.50 |
| 659E14000 REPAIR SEEDING AND MULCHING | 42 SY | $0.05 | $4.50 | $1.00 | $1.01 | $2.00 | $4.50 | $2.25 | $2.89 | $1.00 | $4.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.11 TON | $1,500 | $1,400 | $1,500 | $1,514 | $600 | $1,400 | $1,700 | $979 | $1,500 | $1,400 |
| 659E31000 LIME | 0.17 ACRE | $1,500 | $100 | $200 | $202 | $100 | $100 | $1,700 | $400 | $215 | $100 |
| 659E35000 WATER | 3 MGAL | $1.00 | $3.00 | $1.00 | $1.01 | $20.00 | $1.00 | $1.00 | $12.97 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 3,500 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 37 FT | $19.00 | $25.00 | $30.00 | $23.56 | $20.00 | $30.00 | $125 | $40.00 | $27.00 | $20.00 |
| 304E20000 AGGREGATE BASE | 45 CY | $91.00 | $136 | $90.00 | $85.37 | $100 | $140 | $100 | $104 | $125 | $95.00 |
| 407E10000 TACK COAT @ 0.07 GAL/SY | 65 GAL | $2.25 | $12.00 | $5.00 | $3.03 | $3.00 | $5.00 | $8.00 | $4.72 | $3.00 | $3.00 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 8 CY | $83.50 | $125 | $100 | $108 | $160 | $220 | $100 | $105 | $150 | $175 |
| 441E70200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 449 (8 CY | $575 | $335 | $450 | $434 | $430 | $450 | $515 | $576 | $430 | $430 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 6 EACH | $12.00 | $12.00 | $9.00 | $9.08 | $10.00 | $9.00 | $10.00 | $13.33 | $10.00 | $12.00 |
| 630E85000 REMOVAL OF GROUND MOUNTED SIGN AND STORAGE | 4 EACH | $62.50 | $25.00 | $35.00 | $35.32 | $40.00 | $50.00 | $75.00 | $30.97 | $161 | $35.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $62.50 | $25.00 | $15.00 | $15.14 | $40.00 | $50.00 | $25.00 | $37.13 | $100 | $15.00 |
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $5,388 | $30,000 | $66,700 | $8,678 | $40,000 | $28,000 | $50,000 | $45,000 | $31,000 | $45,000 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $3,338 | $500 | $8,000 | $255 | $18,000 | $18,000 | $40,000 | $12,000 | $25,000 | $40,000 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 71 SY | $21.00 | $45.00 | $36.00 | $23.48 | $36.00 | $21.00 | $25.00 | $32.64 | $38.00 | $21.00 |
| 512E33000 TYPE 2 WATERPROOFING | 8 SY | $45.00 | $30.00 | $40.00 | $50.32 | $30.00 | $26.00 | $30.00 | $33.35 | $75.00 | $50.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 28 SF | $7.00 | $3.00 | $11.00 | $8.97 | $20.00 | $12.00 | $5.00 | $5.40 | $16.00 | $10.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 76 FT | $42.00 | $33.00 | $32.00 | $54.45 | $28.00 | $35.00 | $35.00 | $50.00 | $30.00 | $40.00 |
| 516E41100 1/8" PREFORMED BEARING PAD | 12 EACH | $119 | $50.00 | $50.00 | $76.00 | $60.00 | $45.00 | $400 | $39.69 | $27.00 | $26.00 |
| 516E43200 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY ( | 24 EACH | $224 | $203 | $230 | $262 | $190 | $200 | $153 | $204 | $180 | $150 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 49 CY | $89.00 | $81.00 | $140 | $84.42 | $110 | $100 | $100 | $136 | $100 | $100 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 124 FT | $9.00 | $14.00 | $15.00 | $22.09 | $15.00 | $16.00 | $9.00 | $40.00 | $15.00 | $14.50 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 96 FT | $7.00 | $3.00 | $9.00 | $4.59 | $12.00 | $10.00 | $10.00 | $9.00 | $5.00 | $10.00 |
| 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 40 FT | $9.00 | $4.00 | $20.00 | $6.50 | $20.00 | $14.00 | $10.00 | $7.00 | $6.00 | $15.00 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,000 | $20,000 | $8,000 | $3,491 | $4,500 | $8,500 | $5,500 | $7,000 | $4,000 | $5,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 515E12031 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 6 EACH | $15,000 | $90k | 18% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 83 CY | $484 | $40k | 8% |
| 511E31610 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 35 CY | $1,112 | $39k | 8% |
| 624E10000 MOBILIZATION | 1 LS | $35,000 | $35k | 7% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 12,392 LB | $2.4 | $30k | 6% |
| 526E10000 REINFORCED CONCRETE APPROACH SLABS (T=12") | 80 SY | $307 | $25k | 5% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 113 FT | $210 | $24k | 5% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 39 CY | $575 | $22k | 5% |
| 524E94604 DRILLED SHAFTS, 30" DIAMETER, INTO BEDROCK | 80 FT | $183 | $15k | 3% |
| 526E90010 TYPE A INSTALLATION | 56 FT | $244 | $14k | 3% |