Figure 0.1 · BRIEFING BID #230067 · ODOT RESULT · awarded Jan 26 D05-PM FY2023 (B) Fast Dry West D05 County · est $2.0M
Bid date Thursday, January 26 —
Project scope Bid form · ODOT
21 ITEMS Pavement Marking 43% Maintaining Traffic 19% Mobilization & General 10% Other 29% Top items by winning bid Item Qty Unit price Extended % 642E00104 EDGE LINE, 6", TYPE 1 1,279.33 MILE $837 $1.07M 56% 642E00300 CENTER LINE, TYPE 1 515.35 MILE $849 $438k 23%
Item Quantity R1 Dura Mark INC R2 Oglesby Construction INC % of bid 642E00104 EDGE LINE, 6", TYPE 1 1,279.33 MILE $837 $862 56% 642E00300 CENTER LINE, TYPE 1 515.35 MILE $849 $916 23% 642E00204 LANE LINE, 6", TYPE 1 150.54 MILE $399 $370 3% 614E11000 MAINTAINING TRAFFIC 1 LS $58,000 $24,500 3% 642E00404 CHANNELIZING LINE, 12", TYPE 1 64,018 FT $0.70 $0.50 2% 642E01510 DOTTED LINE, 6", TYPE 1 46,768 FT $0.76 $0.75 2% 642E01300 LANE ARROW, TYPE 1 405 EACH $70.00 $75.00 1% 624E10000 MOBILIZATION 1 LS $25,000 $51,700 1% 642E00620 CROSSWALK LINE, 12", TYPE 1 9,953 FT $2.50 $2.70 1% 642E00500 STOP LINE, TYPE 1 6,290 FT $3.60 $3.90 1% 642E40001 SPEED MEASUREMENT MARKING, AS PER PLAN 15 EACH $1,200 $795 1% 642E01410 WORD ON PAVEMENT, 96", TYPE 1 (ONLY) 165 EACH $88.00 $90.00 1% 642E00400 CHANNELIZING LINE, 8", TYPE 1 25,697 FT $0.55 $0.55 1% 642E01110 SCHOOL SYMBOL MARKING, 96", TYPE 1 31 EACH $385 $400 1% 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM 1 LS $9,252 $10,500 0% 642E01000 RAILROAD SYMBOL MARKING, TYPE 1 23 EACH $385 $425 0% 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST 150 HOUR $50.00 $70.00 0% 642E01322 WRONG WAY ARROW, TYPE 1 12 EACH $365 $190 0% 642E01312 LANE REDUCTION ARROW, TYPE 1 7 EACH $365 $270 0% 642E01410 WORD ON PAVEMENT, 96", TYPE 1 (MERGE) 2 EACH $500 $200 0%
Show all 21 line items Project details
Description D05-PM FY2023 (B) Fast Dry West
Type of work Pavement How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →