BEL-SR 800-14.97
BEL County · est $1.5M
Bid dateThursday, February 9—
BEL County · est $1.5M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 63 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Black Horse Bridge Construction INC | R3Complete General Construction Company | R4Beaver Excavating Company | % of bid |
|---|---|---|---|---|---|---|
| 511E33312 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 184 CY | $1,600 | $1,275 | $1,750 | $1,850 | 27% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 53,605 LB | $1.75 | $2.00 | $1.90 | $1.70 | 9% |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 74 CY | $1,200 | $835 | $750 | $900 | 8% |
| 615E20001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER | 843 SY | $90.00 | $130 | $100 | $95.00 | 7% |
| 202E11002 STRUCTURE REMOVED, OVER 20 FOOT SPAN | 1 LS | $73,000 | $75,000 | $100,000 | $100,000 | 7% |
| 526E15010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 178 SY | $350 | $400 |
| Item | Quantity | R1Shelly & Sands INC | R2Black Horse Bridge Construction INC | R3Complete General Construction Company | R4Beaver Excavating Company |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $4,500 | $6,500 | $10,000 | $30,000 |
| 202E23000 PAVEMENT REMOVED | 444 SY | $25.00 | $17.00 | $20.00 | $18.00 |
| 202E38000 GUARDRAIL REMOVED | 265 FT | $5.00 | $4.00 | $2.00 | $15.00 |
| 203E10000 EXCAVATION | 542 CY | $28.00 | $20.00 | $15.00 | $12.00 |
| 203E20000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $375 |
| $375 |
| 6% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $40,000 | $26,000 | $85,000 | $75,000 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40,000 | $40,000 | $40,000 | 4% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 162.5 FT | $245 | $270 | $275 | $270 | 4% |
| 619E16010 FIELD OFFICE, TYPE B | 13 MNTH | $2,800 | $750 | $1,500 | $2,000 | 3% |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 1 EACH | $35,000 | $32,000 | $8,000 | $35,000 | 3% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 119 CY | $275 | $350 | $275 | $275 | 3% |
| 507E00300 STEEL PILES HP14X73, FURNISHED | 540 FT | $49.00 | $64.00 | $55.00 | $60.00 | 2% |
| 507E71200 SPECIAL - PILE ENCASEMENT | 150 FT | $165 | $235 | $185 | $215 | 2% |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $24,000 | $45,000 | $25,000 | $50,000 | 2% |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $20,000 | $10,000 | $20,000 | $30,000 | 2% |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 27 CF | $698 | $620 | $535 | $630 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $18,000 | $13,000 | $4,000 | $27,000 | 2% |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 640 FT | $28.00 | $40.00 | $35.00 | $35.00 | 2% |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 292 CY | $56.00 | $96.00 | $70.00 | $110 | 2% |
| 716 CY |
| $13.50 |
| $35.00 |
| $20.00 |
| $12.00 |
| 204E10000 SUBGRADE COMPACTION | 686 SY | $5.00 | $5.00 | $5.00 | $5.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 137.5 FT | $25.00 | $23.20 | $23.20 | $35.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 4 EACH | $2,650 | $2,640 | $2,640 | $2,700 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $2,500 | $2,480 | $2,480 | $2,450 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $98.00 | $100 | $150 | $98.00 |
| 659E00300 TOPSOIL | 229 CY | $34.00 | $50.00 | $25.00 | $50.00 |
| 659E10000 SEEDING AND MULCHING | 2,065 SY | $1.67 | $2.40 | $2.10 | $1.66 |
| 659E14000 REPAIR SEEDING AND MULCHING | 103 SY | $0.79 | $0.50 | $2.10 | $0.78 |
| 659E20000 COMMERCIAL FERTILIZER | 0.29 TON | $857 | $510 | $1,400 | $857 |
| 659E31000 LIME | 0.43 ACRE | $153 | $20.00 | $100 | $152 |
| 659E35000 WATER | 11 MGAL | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,650 | $2,000 | $1,500 | $1,475 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $6,000 | $10,000 | $20,100 | $2,000 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $7,700 | $9,000 | $9,000 | $8,000 |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 50 FT | $37.00 | $21.00 | $35.00 | $30.00 |
| 304E20000 AGGREGATE BASE | 164 CY | $90.00 | $100 | $90.00 | $130 |
| 407E10000 TACK COAT | 55 GAL | $4.00 | $4.00 | $4.00 | $4.00 |
| 441E70101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), AS | 19 CY | $500 | $750 | $500 | $500 |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (22 CY | $450 | $400 | $450 | $450 |
| 621E00100 RPM | 9 EACH | $275 | $275 | $275 | $275 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 9 EACH | $10.00 | $50.00 | $25.00 | $8.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 12 EACH | $10.00 | $12.50 | $12.50 | $10.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 8.5 FT | $15.00 | $40.00 | $40.00 | $15.00 |
| 630E80100 SIGN, FLAT SHEET | 1 SF | $35.00 | $50.00 | $50.00 | $35.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 1 EACH | $20.00 | $10.00 | $10.00 | $20.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1 EACH | $20.00 | $15.00 | $15.00 | $20.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.14 MILE | $4,250 | $4,250 | $4,250 | $4,250 |
| 642E00300 CENTER LINE, TYPE 1 | 0.28 MILE | $3,250 | $3,250 | $3,250 | $3,250 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 20 CY | $90.00 | $85.00 | $125 | $150 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 48 HOUR | $80.00 | $75.00 | $85.00 | $70.00 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,200 | $2,260 | $2,500 | $3,000 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 22 EACH | $7.50 | $18.00 | $18.00 | $18.00 |
| 614E13312 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 14 EACH | $6.50 | $32.00 | $32.00 | $32.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 36 EACH | $14.00 | $26.00 | $26.00 | $26.00 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 0.52 MILE | $2,250 | $2,250 | $2,250 | $2,250 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 0.56 MILE | $11,350 | $11,350 | $11,350 | $11,350 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 22 FT | $12.00 | $12.00 | $12.00 | $12.00 |
| 616E10000 WATER | 2 MGAL | $67.00 | $1.00 | $70.00 | $25.00 |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 670 FT | $20.00 | $28.00 | $14.00 | $20.00 |
| 622E41110 PORTABLE BARRIER, ANCHORED | 240 FT | $30.00 | $32.00 | $20.00 | $30.00 |
| 202E22900 APPROACH SLAB REMOVED | 73 SY | $26.50 | $56.00 | $75.00 | $115 |
| 202E23500 WEARING COURSE REMOVED | 497 SY | $18.00 | $5.00 | $30.00 | $10.00 |
| 503E21100 UNCLASSIFIED EXCAVATION | 133 CY | $80.00 | $100 | $400 | $375 |
| 507E00150 STEEL PILES HP10X42, DRIVEN | 560 FT | $25.00 | $4.00 | $25.00 | $24.00 |
| 507E00350 STEEL PILES HP14X73, DRIVEN | 480 FT | $29.00 | $4.00 | $35.00 | $44.00 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 190 SY | $35.00 | $30.00 | $35.00 | $45.00 |
| 512E33000 TYPE 2 WATERPROOFING | 12 SY | $40.00 | $48.00 | $75.00 | $85.00 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 65 SF | $4.00 | $12.00 | $10.00 | $17.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 86 SF | $5.00 | $14.00 | $10.00 | $20.00 |
| 516E14014 INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 109 FT | $35.00 | $30.00 | $38.00 | $40.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 56 CY | $108 | $105 | $130 | $150 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 110 FT | $6.00 | $12.00 | $12.00 | $15.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 59 FT | $6.00 | $12.00 | $15.00 | $30.00 |
| 526E90010 TYPE A INSTALLATION | 80 FT | $180 | $180 | $200 | $155 |
| 690E98400 SPECIAL - WORK INVOLVING ASBESTOS CONTAINING MATER | 1 LS | $535 | $100 | $5,000 | $50.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,700 | $13,000 | $15,000 | $10,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $10,000 | $28,000 | $65,000 | $20,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 511E33312 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 184 CY | $1,600 | $294k | 21% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 53,605 LB | $1.75 | $94k | 7% |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 74 CY | $1,200 | $89k | 6% |
| 615E20001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER | 843 SY | $90 | $76k | 6% |
| 202E11002 STRUCTURE REMOVED, OVER 20 FOOT SPAN | 1 LS | $73,000 | $73k | 5% |
| 526E15010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 178 SY | $350 | $62k | 5% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $40,000 | $40k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 3% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 162.5 FT | $245 | $40k | 3% |
| 619E16010 FIELD OFFICE, TYPE B | 13 MNTH | $2,800 | $36k | 3% |