CUY-SR 175 Multi-Purpose Trail
CUY County · est $0.7M
Bid dateThursday, February 9—
CUY County · est $0.7M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 49 more items below.
| Item | Quantity | R1R M H Concrete & Foundations INC | R2Karvo Companies INC | R3Fechko Excavating LLC | R4Digioia-suburban Excavating LLC | R5Tri-mor CORP | R6D L Smith Concrete LLC | R7Perk Company INC | R8C A Agresta Construction CO | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|
| 608E13000 6" CONCRETE WALK | 35,656 SF | $6.00 | $5.20 | $6.00 | $6.50 | $7.00 | $7.20 | $8.10 | $9.00 | 36% |
| 203E10000 EXCAVATION | 1,444 CY | $43.25 | $58.00 | $35.00 | $25.00 | $30.00 | $45.00 |
| Item | Quantity | R1R M H Concrete & Foundations INC | R2Karvo Companies INC | R3Fechko Excavating LLC | R4Digioia-suburban Excavating LLC | R5Tri-mor CORP | R6D L Smith Concrete LLC | R7Perk Company INC | R8C A Agresta Construction CO |
|---|---|---|---|---|---|---|---|---|---|
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $2,800 | $10,000 | $7,500 | $10,500 | $6,500 | $25,000 | $15,000 | $5,000 |
| 202E30001 WALK REMOVED, AS PER PLAN | 491 SF | $2.05 | $9.50 | $2.75 | $10.00 | $3.50 | $2.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $41.75 |
| $35.00 |
| 11% |
| 452E12050 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS | 590 SY | $87.00 | $76.75 | $80.00 | $94.00 | $105 | $90.00 | $77.25 | $110 | 9% |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 539 CY | $75.00 | $126 | $74.00 | $76.00 | $85.00 | $65.00 | $76.75 | $65.00 | 7% |
| 611E98181 CATCH BASIN, NO. 3A, AS PER PLAN | 8 EACH | $4,000 | $4,800 | $5,200 | $6,000 | $5,500 | $5,500 | $4,475 | $6,200 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $25,000 | $32,000 | $27,500 | $23,500 | $17,000 | $30,000 | $17,000 | $40,030 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $25,000 | $15,000 | $50,000 | $10,500 | $15,000 | $25,000 | $21,600 | $22,529 | 4% |
| 608E52001 CURB RAMP, AS PER PLAN | 1,221 SF | $16.50 | $9.50 | $10.50 | $16.50 | $18.00 | $15.00 | $25.70 | $35.00 | 3% |
| 609E26000 CURB, TYPE 6 | 660 FT | $21.50 | $21.00 | $39.00 | $38.00 | $26.00 | $45.00 | $26.30 | $25.00 | 2% |
| 202E23001 PAVEMENT REMOVED, AS PER PLAN | 711 SY | $19.00 | $21.00 | $20.00 | $14.00 | $13.00 | $20.00 | $33.35 | $15.00 | 2% |
| 659E00300 TOPSOIL | 125 CY | $105 | $50.00 | $35.00 | $40.00 | $85.00 | $65.00 | $65.00 | $75.00 | 2% |
| 614E18600 PORTABLE CHANGEABLE MESSAGE SIGN | 10 SNMT | $1,250 | $800 | $1,200 | $975 | $1,200 | $1,000 | $1,250 | $1,050 | 2% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 33 CY | $375 | $375 | $350 | $445 | $250 | $300 | $375 | $350 | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $120 | $75.00 | $77.00 | $80.00 | $80.00 | $120 | $75.00 | $70.00 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $9,500 | $8,500 | $6,850 | $6,500 | $7,800 | $30,000 | $10,000 | $10,000 | 2% |
| 203E20000 EMBANKMENT | 137 CY | $55.00 | $50.00 | $14.00 | $13.00 | $15.00 | $45.00 | $13.35 | $15.00 | 1% |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 5 EACH | $1,500 | $800 | $1,450 | $950 | $2,500 | $1,500 | $1,075 | $550 | 1% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $6,500 | $19,660 | $9,000 | $18,500 | $6,500 | $26,000 | $5,000 | $5,000 | 1% |
| 646E10510 CROSSWALK LINE, 12" | 838 FT | $6.50 | $8.10 | $6.00 | $8.00 | $7.00 | $7.00 | $6.00 | $6.00 | 1% |
| 632E64020 PEDESTAL FOUNDATION | 6 EACH | $900 | $840 | $950 | $1,800 | $1,100 | $900 | $950 | $840 | 1% |
| $6.75 |
| $3.00 |
| 202E32001 CURB REMOVED, AS PER PLAN | 100 FT | $12.45 | $31.00 | $2.15 | $9.00 | $8.00 | $10.00 | $15.60 | $10.00 |
| 202E58200 INLET REMOVED | 7 EACH | $475 | $500 | $1,100 | $475 | $550 | $500 | $780 | $600 |
| 204E10000 SUBGRADE COMPACTION | 4,552 SY | $1.00 | $1.55 | $1.90 | $2.50 | $1.00 | $1.00 | $1.00 | $1.00 |
| 608E10000 4" CONCRETE WALK | 491 SF | $9.50 | $5.65 | $6.90 | $11.00 | $7.00 | $6.00 | $8.10 | $10.00 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $350 | $300 | $100 | $250 | $250 | $100 | $500 | $100 |
| 659E10001 SEEDING AND MULCHING, AS PER PLAN | 1,347 SY | $3.15 | $2.00 | $1.15 | $2.00 | $4.00 | $5.00 | $2.65 | $5.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.2 TON | $2,205 | $1,200 | $3,000 | $600 | $2,500 | $1,000 | $1,000 | $500 |
| 659E31000 LIME | 0.05 ACRE | $6,750 | $1.00 | $500 | $300 | $2,500 | $400 | $1,000 | $500 |
| 659E35000 WATER | 3.8 MGAL | $165 | $0.01 | $20.00 | $25.00 | $500 | $100 | $10.00 | $25.00 |
| 670E00700 DITCH EROSION PROTECTION | 370 SY | $8.65 | $3.00 | $3.00 | $3.00 | $25.00 | $9.00 | $25.00 | $3.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,600 | $1,475 | $3,635 | $3,500 | $1,700 | $2,500 | $1,750 | $3,000 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $5,050 | $3,040 | $6,840 | $2,500 | $3,400 | $4,000 | $1,200 | $10,000 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $3,150 | $2,000 | $3,000 | $3,550 | $3,300 | $3,500 | $2,900 | $1,000 |
| 832E30001 EROSION CONTROL, AS PER PLAN | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E13410 6" UNCLASSIFIED PIPE UNDERDRAINS WITH GEOTEXTILE F | 100 FT | $18.00 | $16.00 | $35.00 | $115 | $15.00 | $9.00 | $36.25 | $10.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 110 FT | $15.00 | $15.50 | $24.00 | $22.50 | $15.00 | $14.00 | $36.25 | $15.00 |
| 611E04401 12" CONDUIT, TYPE B, AS PER PLAN | 65 FT | $38.50 | $113 | $150 | $150 | $134 | $100 | $240 | $90.00 |
| 611E98151 CATCH BASIN, NO. 3, AS PER PLAN | 1 EACH | $4,100 | $5,900 | $6,900 | $6,500 | $7,500 | $7,500 | $5,080 | $7,000 |
| 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN | 1 EACH | $800 | $1,500 | $1,350 | $850 | $1,600 | $1,500 | $1,075 | $1,200 |
| 611E98635 CATCH BASIN RECONSTRUCTED TO GRADE, AS PER PLAN | 1 EACH | $1,200 | $2,500 | $3,700 | $1,550 | $2,500 | $3,500 | $1,430 | $1,400 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 2,000 LB | $2.40 | $2.00 | $2.85 | $2.20 | $3.00 | $2.00 | $2.50 | $2.00 |
| 407E10000 TACK COAT | 16 GAL | $3.25 | $3.50 | $3.00 | $11.50 | $5.00 | $6.00 | $15.00 | $3.00 |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 6 CY | $750 | $685 | $700 | $900 | $1,250 | $300 | $790 | $700 |
| 441E70200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 449 (4 CY | $750 | $900 | $700 | $900 | $1,250 | $300 | $1,075 | $700 |
| 609E16000 CURB, TYPE 2-B | 100 FT | $15.15 | $30.50 | $19.00 | $76.00 | $26.00 | $35.00 | $18.00 | $40.00 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 7 EACH | $400 | $55.00 | $170 | $225 | $250 | $250 | $1,000 | $200 |
| 630E80100 SIGN, FLAT SHEET | 12 SF | $55.00 | $67.50 | $24.00 | $58.00 | $27.00 | $50.00 | $24.00 | $50.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 5 EACH | $33.00 | $40.50 | $30.00 | $35.00 | $45.00 | $100 | $30.00 | $30.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 3 EACH | $115 | $142 | $85.00 | $120 | $94.00 | $250 | $85.00 | $105 |
| 646E10400 STOP LINE | 181 FT | $13.00 | $16.20 | $15.00 | $15.00 | $17.00 | $15.00 | $15.00 | $12.00 |
| 646E20300 LANE ARROW | 7 EACH | $185 | $230 | $165 | $195 | $183 | $200 | $165 | $170 |
| 646E50000 REMOVAL OF PAVEMENT MARKING | 7 EACH | $110 | $135 | $60.00 | $115 | $221 | $125 | $200 | $100 |
| 646E50100 REMOVAL OF PAVEMENT MARKING | 652 FT | $4.40 | $5.40 | $2.00 | $5.00 | $6.00 | $5.00 | $5.00 | $4.00 |
| 625E25504 CONDUIT, 3", 725.051 | 109 FT | $13.65 | $13.00 | $18.00 | $24.00 | $20.00 | $13.00 | $18.00 | $13.00 |
| 625E29400 TRENCH IN PAVED AREA | 109 FT | $46.25 | $44.00 | $20.00 | $50.00 | $22.00 | $46.00 | $105 | $44.00 |
| 625E31600 PULL BOX, MISC.: PULL BOX ADJUSTED TO GRADE | 3 EACH | $140 | $130 | $400 | $390 | $445 | $150 | $400 | $130 |
| 625E31600 PULL BOX, MISC.: PULL BOX RELOCATION | 1 EACH | $400 | $350 | $2,500 | $1,200 | $2,760 | $400 | $2,500 | $350 |
| 625E32000 GROUND ROD | 6 EACH | $220 | $208 | $350 | $380 | $400 | $225 | $350 | $208 |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 8 EACH | $510 | $485 | $575 | $1,035 | $650 | $500 | $575 | $485 |
| 632E26000 PEDESTRIAN PUSHBUTTON | 8 EACH | $200 | $190 | $275 | $420 | $300 | $225 | $275 | $190 |
| 632E40300 SIGNAL CABLE, 3 CONDUCTOR, NO. 14 AWG | 1,190 FT | $1.20 | $1.10 | $1.95 | $4.50 | $2.00 | $1.50 | $1.95 | $1.10 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 1,238 FT | $1.50 | $1.40 | $2.65 | $4.80 | $3.00 | $1.75 | $2.65 | $1.40 |
| 632E89900 PEDESTAL, 8', TRANSFORMER BASE | 6 EACH | $600 | $565 | $1,100 | $1,200 | $1,225 | $600 | $1,100 | $565 |
| 632E90300 SIGNALIZATION, MISC.: REMOVAL OF PEDESTRIAN SIGNAL | 1 LS | $1,300 | $1,220 | $2,500 | $1,175 | $2,800 | $1,500 | $12,500 | $1,220 |
| 632E90400 SIGNALIZATION, MISC.:FOUNDATION TEST HOLE | 7 EACH | $100 | $95.00 | $500 | $335 | $555 | $150 | $500 | $95.00 |
| 616E10000 WATER | 10 MGAL | $105 | $1.00 | $20.00 | $80.00 | $115 | $100 | $25.80 | $10.00 |
| 616E20000 CALCIUM CHLORIDE | 1 TON | $735 | $1.00 | $700 | $500 | $2,000 | $150 | $250 | $10.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 608E13000 6" CONCRETE WALK | 35,656 SF | $6 | $214k | 31% |
| 203E10000 EXCAVATION | 1,444 CY | $43.25 | $62k | 9% |
| 452E12050 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS | 590 SY | $87 | $51k | 7% |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 539 CY | $75 | $40k | 6% |
| 611E98181 CATCH BASIN, NO. 3A, AS PER PLAN | 8 EACH | $4,000 | $32k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $25,000 | $25k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $25,000 | $25k | 4% |
| 608E52001 CURB RAMP, AS PER PLAN | 1,221 SF | $16.5 | $20k | 3% |
| 609E26000 CURB, TYPE 6 | 660 FT | $21.5 | $14k | 2% |
| 202E23001 PAVEMENT REMOVED, AS PER PLAN | 711 SY | $19 | $14k | 2% |