SAN-Hayes Center Paving
SAN County · est $0.5M
Bid dateThursday, March 9—
SAN County · est $0.5M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 26 more items below.
| Item | Quantity | R1M & B Asphalt CO INC | R2Henry W Bergman INC | R3Erie Blacktop INC | % of bid |
|---|---|---|---|---|---|
| 424E14001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 448 (225 CY | $392 | $299 | $365 | 20% |
| 441E50201 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (281 CY | $305 | $285 | $265 | 20% |
| 253E02000 PAVEMENT REPAIR | 189 CY | $300 | $395 | $325 | 13% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 141 CY | $275 | $272 | $255 | 9% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN (2 | 6,812 SY | $4.30 | $3.30 | $8.00 | 7% |
| 203E10000 EXCAVATION | 720 CY | $28.00 | $19.00 | $29.50 | 5% |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 252 SY | $75.00 |
| Item | Quantity | R1M & B Asphalt CO INC | R2Henry W Bergman INC | R3Erie Blacktop INC |
|---|---|---|---|---|
| 202E30000 WALK REMOVED | 255 SF | $3.00 | $5.00 | $3.15 |
| 202E32500 CURB AND GUTTER REMOVED | 75 FT | $12.00 | $15.00 | $12.75 |
| 202E58100 CATCH BASIN REMOVED | 3 EACH | $325 | $600 | $345 |
| 202E75101 FENCE REMOVED FOR STORAGE, AS PER PLAN | 300 FT | $5.00 | $30.58 | $5.25 |
| 204E10000 SUBGRADE COMPACTION | 1,514 SY | $1.50 | $1.00 | $1.60 |
| 608E10000 4" CONCRETE WALK | 50 SF |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $104 |
| $80.00 |
| 4% |
| 202E23001 PAVEMENT REMOVED, AS PER PLAN | 895 SY | $19.50 | $12.00 | $20.50 | 4% |
| 304E20000 AGGREGATE BASE | 253 CY | $63.00 | $62.00 | $66.50 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $11,000 | $20,000 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $9,600 | $10,000 | $20,000 | 2% |
| 611E98504 CATCH BASIN, NO. 2-2C | 2 EACH | $3,500 | $3,200 | $3,675 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $6,500 | $9,500 | $23,500 | 1% |
| 203E20000 EMBANKMENT | 172 CY | $36.00 | $15.00 | $38.00 | 1% |
| 609E26000 CURB, TYPE 6 | 195 FT | $30.00 | $41.80 | $31.50 | 1% |
| 659E00300 TOPSOIL | 89 CY | $60.00 | $75.00 | $63.00 | 1% |
| 202E23000 PAVEMENT REMOVED | 241 SY | $17.00 | $12.00 | $18.00 | 1% |
| 202E32000 CURB REMOVED | 342 FT | $11.00 | $12.00 | $11.75 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,500 | $5,000 | $9,500 | 1% |
| 642E01200 PARKING LOT STALL MARKING, TYPE 1 | 3,336 FT | $1.00 | $1.10 | $1.05 | 1% |
| $16.50 |
| $8.80 |
| $17.50 |
| 608E52000 CURB RAMP | 146 SF | $16.50 | $30.80 | $17.50 |
| 608E52001 CURB RAMP, AS PER PLAN | 174 SF | $16.50 | $33.00 | $17.50 |
| 659E10000 SEEDING AND MULCHING | 801 SY | $2.60 | $5.45 | $2.75 |
| 659E20000 COMMERCIAL FERTILIZER | 0.11 TON | $1,500 | $1,161 | $1,575 |
| 659E35000 WATER | 4 MGAL | $50.00 | $1.10 | $52.50 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 |
| 611E00406 4" CONDUIT, TYPE F | 5 FT | $40.00 | $60.00 | $42.00 |
| 611E01500 6" CONDUIT, TYPE F | 10 FT | $48.00 | $55.00 | $50.50 |
| 611E02600 8" CONDUIT, TYPE F | 5 FT | $60.00 | $60.00 | $63.00 |
| 611E98471 CATCH BASIN, NO. 2-2B, AS PER PLAN | 1 EACH | $3,200 | $2,500 | $3,360 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 2 EACH | $850 | $1,200 | $895 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 3 EACH | $900 | $1,400 | $945 |
| 407E20000 NON-TRACKING TACK COAT | 1,131 GAL | $2.90 | $4.00 | $2.65 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 661 LB | $1.00 | $5.50 | $8.00 |
| 611E97400 CONDUIT, MISC.: 4 INCH CONDUIT TYPE E, 707.45 | 55 FT | $25.00 | $46.00 | $26.25 |
| 625E75500 LIGHT POLE FOUNDATION REMOVED | 1 EACH | $850 | $1,200 | $895 |
| 642E00700 TRANSVERSE/DIAGONAL LINE, TYPE 1 | 109 FT | $1.00 | $1.10 | $2.10 |
| 644E01600 HANDICAP SYMBOL MARKING | 4 EACH | $150 | $275 | $160 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 1 SNMT | $1,500 | $1,200 | $1,260 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,500 | $5,000 | $4,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 424E14001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 448 (225 CY | $392 | $88k | 19% |
| 441E50201 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (281 CY | $305 | $86k | 18% |
| 253E02000 PAVEMENT REPAIR | 189 CY | $300 | $57k | 12% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 141 CY | $275 | $39k | 8% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN (2 | 6,812 SY | $4.3 | $29k | 6% |
| 203E10000 EXCAVATION | 720 CY | $28 | $20k | 4% |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 252 SY | $75 | $19k | 4% |
| 202E23001 PAVEMENT REMOVED, AS PER PLAN | 895 SY | $19.5 | $17k | 4% |
| 304E20000 AGGREGATE BASE | 253 CY | $63 | $16k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10k | 2% |