PRE-SR 503/Var-05.58/Var
PRE County · est $3.6M
Bid dateThursday, March 9—
PRE County · est $3.6M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 36 more items below.
| Item | Quantity | R1Barrett Paving Materials INC | R2John R Jurgensen Company | % of bid |
|---|---|---|---|---|
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 8,237 CY | $233 | $271 | 47% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (2370 CY | $192 | $217 | 11% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.50" | 155,267 SY | $2.50 | $2.68 | 10% |
| 608E52001 CURB RAMP, AS PER PLAN | 5,045 SF | $40.00 | $30.46 | 5% |
| 253E02000 PAVEMENT REPAIR, (A) | 550 CY | $350 | $553 | 5% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3" | 48,932 SY | $3.25 | $3.58 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $136,700 | $110,448 | 3% |
| 644E00104 EDGE LINE, 6" | 19.75 MILE | $4,200 | $4,200 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $80,000 | $100,000 | 2% |
| 644E00300 CENTER LINE | 13 MILE | $5,325 | $5,325 | 2% |
| 617E10100 COMPACTED AGGREGATE | 518 CY | $115 | $120 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 16,656 GAL | $3.50 | $6.70 | 1% |
| 621E00100 RPM | 1,282 EACH | $42.82 | $35.00 | 1% |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 65 EACH | $575 | $581 | 1% |
| 202E30000 WALK REMOVED | 5,038 SF | $7.00 | $12.00 | 1% |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 19.75 MILE | $1,530 | $1,530 | 1% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 13 MILE | $2,296 | $2,296 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $20,000 | $18,483 | 0% |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 16 EACH | $1,200 | $923 | 0% |
| 608E10000 4" CONCRETE WALK | 1,236 SF | $15.00 | $17.06 | 0% |
| Item | Quantity | R1Barrett Paving Materials INC | R2John R Jurgensen Company |
|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 20 SY | $90.00 | $698 |
| 202E32000 CURB REMOVED | 84 FT | $18.00 | $25.00 |
| 202E32500 CURB AND GUTTER REMOVED | 704 FT | $18.00 | $25.00 |
| 202E38000 GUARDRAIL REMOVED | 200 FT | $2.00 | $15.00 |
| 203E10000 EXCAVATION | 3 CY | $100 | $150 |
| 209E72050 PREPARING SUBGRADE FOR SHOULDER PAVING | 6 MILE | $775 | $1,398 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 100 FT | $28.60 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $39.00 |
| 606E35141 BRIDGE TERMINAL ASSEMBLY, TYPE 4, AS PER PLAN | 4 EACH | $1,580 | $2,525 |
| 253E02000 PAVEMENT REPAIR, (B) | 37 CY | $200 | $700 |
| 254E01600 PATCHING PLANED SURFACE | 2,052 SY | $1.00 | $29.79 |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 154 FT | $60.00 | $58.85 |
| 609E26000 CURB, TYPE 6 | 159 FT | $60.00 | $58.58 |
| 617E20000 SHOULDER PREPARATION | 6,794 SY | $1.40 | $0.73 |
| 617E25000 WATER | 11 MGAL | $50.00 | $527 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 59 EACH | $285 | $581 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 1,571 EACH | $5.00 | $12.78 |
| 644E00400 CHANNELIZING LINE, 8" | 20 FT | $3.50 | $3.50 |
| 644E00500 STOP LINE | 266 FT | $7.00 | $7.00 |
| 644E00620 CROSSWALK LINE, 12" | 4,440 FT | $3.50 | $3.50 |
| 644E00900 ISLAND MARKING | 45 SF | $5.30 | $5.30 |
| 644E01000 RAILROAD SYMBOL MARKING | 1 EACH | $750 | $750 |
| 644E01110 SCHOOL SYMBOL MARKING, 96" | 2 EACH | $750 | $750 |
| 644E01200 PARKING LOT STALL MARKING | 1,142 FT | $2.43 | $2.43 |
| 644E01300 LANE ARROW | 11 EACH | $115 | $115 |
| 644E01600 HANDICAP SYMBOL MARKING | 4 EACH | $125 | $125 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $80.00 | $101 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 3.22 MILE | $2,296 | $2,296 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 6.14 MILE | $1,530 | $1,530 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 48 FT | $3.98 | $3.98 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 246 FT | $3.98 | $3.98 |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 33.4 CF | $494 | $494 |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 30.06 CF | $494 | $494 |
| 409E30000 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT | 60 FT | $42.00 | $27.06 |
| 517E75601 DEEP BEAM BRIDGE RETROFIT RAILING, AS PER PLAN | 124 FT | $130 | $127 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $2,250 | $5,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,500 | $15,312 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 8,237 CY | $233 | $1.92M | 45% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (2370 CY | $192 | $455k | 11% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.50" | 155,267 SY | $2.5 | $388k | 9% |
| 608E52001 CURB RAMP, AS PER PLAN | 5,045 SF | $40 | $202k | 5% |
| 253E02000 PAVEMENT REPAIR, (A) | 550 CY | $350 | $193k | 5% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3" | 48,932 SY | $3.25 | $159k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $136,700 | $137k | 3% |
| 644E00104 EDGE LINE, 6" | 19.75 MILE | $4,200 | $83k | 2% |
| 624E10000 MOBILIZATION | 1 LS | $80,000 | $80k | 2% |
| 644E00300 CENTER LINE | 13 MILE | $5,325 | $69k | 2% |