Figure 0.1 · BRIEFING BID #230167 · ODOT RESULT · awarded Mar 30 D03-PM FY2023 D03 County · est $2.8M
Bid date Thursday, March 30 —
Project scope Bid form · ODOT
30 ITEMS Pavement Marking 70% Maintaining Traffic 7% Mobilization & General 7% Erosion & Landscaping 3% Other 13% Top items by winning bid Item Qty Unit price Extended % 642E00104 EDGE LINE, 6", TYPE 1 1,579.81 MILE $788 $1.24M
Item Quantity R1 Oglesby Construction INC R2 The Aero-mark Company LLC % of bid 642E00104 EDGE LINE, 6", TYPE 1 1,579.81 MILE $788 $788 44% 642E00300 CENTER LINE, TYPE 1 1,118.09 MILE $715 $678 28% 643E00104 EDGE LINE, 6" 142.76 MILE $1,300 $1,338 7% 642E00204 LANE LINE, 6", TYPE 1 499.59 MILE $360 $378 6% 643E00700 TRANSVERSE/DIAGONAL LINE 20,575 FT $3.45 $4.00 3% 643E00300 CENTER LINE 46.5 MILE $1,250 $1,288 2% 643E01300 LANE ARROW 572 EACH $78.00 $85.00 2% 643E00500 STOP LINE 7,137 FT $4.40 $4.85 1% 643E01510 DOTTED LINE, 6" 26,478 FT $1.15 $0.75 1% 614E11000 MAINTAINING TRAFFIC 1 LS $29,500 $50,000 1% 643E00400 CHANNELIZING LINE, 8" 44,687 FT $0.60 $0.75 1% 618E41000 RUMBLE STRIPES, EDGE LINE (ASPHALT CONCRETE) 8.6 MILE $2,500 $1,200 1% 624E10000 MOBILIZATION 1 LS $21,500 $50,000 1% 643E01200 PARKING LOT STALL MARKING 11,522 FT $1.50 $1.49 1% 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM 1 LS $16,000 $13,304 1% 643E40000 AIR SPEED ZONE MARKING 13 EACH $1,000 $900 0% 643E00204 LANE LINE, 6" 25.26 MILE $480 $598 0% 643E50100 PAVEMENT MARKING, MISC.:LANE REDUCTION ARROW 24 EACH $400 $315 0% 643E00620 CROSSWALK LINE, 12" 2,521 FT $3.00 $3.50 0% 618E43000 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE) 4.3 MILE $1,600 $2,400 0%
Show all 30 line items Item Quantity R1 Oglesby Construction INC R2 The Aero-mark Company LLC 832E30000 EROSION CONTROL 1,000 EACH $1.00 $1.00 643E01000 RAILROAD SYMBOL MARKING 13 EACH $360 $475 643E01110 SCHOOL SYMBOL MARKING, 96" 12 EACH $350 $475 643E01310 WRONG WAY ARROW 20 EACH $200 $200 643E01410 WORD ON PAVEMENT, 96" 27 EACH $110 $100 643E20802 YIELD LINE 24 FT $20.00 $40.00 643E30000 REMOVAL OF PAVEMENT MARKING 200 FT
Project details
Description D03-PM FY2023
Type of work Pavement How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →