WAR-SR 123-30.65
WAR County · est $0.5M
Bid dateThursday, March 30—
WAR County · est $0.5M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 34 more items below.
| Item | Quantity | R1Barrett Paving Materials INC | R2John R Jurgensen Company | % of bid |
|---|---|---|---|---|
| 253E02001 PAVEMENT REPAIR, AS PER PLAN, VARIATION B | 290 CY | $425 | $517 | 26% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (533 CY | $185 | $181 | 21% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 382 CY | $220 | $271 | 18% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3" | 10,975 SY | $4.05 | $2.85 | 9% |
| 608E52000 CURB RAMP | 1,309 SF | $32.00 | $26.28 | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $20,000 | $48,105 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $13,000 | $20,000 | 3% |
| 202E30000 WALK REMOVED | 1,225 SF | $8.00 | $3.29 | 2% |
| 254E01600 PATCHING PLANED SURFACE | 550 SY | $13.00 | $4.02 | 2% |
| 253E02001 PAVEMENT REPAIR, AS PER PLAN, VARIATION A | 18 CY | $375 | $619 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 1,537 GAL | $3.50 | $4.00 | 1% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 45 FT | $115 | $111 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,851 | $4,860 | 1% |
| 644E00620 CROSSWALK LINE, 12" | 624 FT | $4.45 | $4.45 | 1% |
| 644E00300 CENTER LINE | 0.34 MILE | $7,832 | $7,832 | 1% |
| 202E32500 CURB AND GUTTER REMOVED | 122 FT | $20.00 | $28.93 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,000 | $1,676 | 0% |
| 644E00200 LANE LINE, 4" | 0.67 MILE | $1,958 | $1,958 | 0% |
| 614E27050 WORK ZONE CROSSWALK LINE, CLASS I, 12", 642 PAINT | 624 FT | $2.10 | $2.10 | 0% |
| 614E27250 WORK ZONE CROSSWALK LINE, CLASS III, 12", 642 PAIN | 624 FT | $2.10 | $2.10 | 0% |
| Item | Quantity | R1Barrett Paving Materials INC | R2John R Jurgensen Company |
|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 30 SY | $35.00 | $158 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 1 EACH | $1,100 | $567 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $175 | $175 |
| 659E00300 TOPSOIL | 18 CY | $60.00 | $60.00 |
| 659E10000 SEEDING AND MULCHING | 160 SY | $5.00 | $5.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 8 SY | $2.50 | $2.50 |
| 659E20000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 0.04 TON |
| $3,000 |
| $3,000 |
| 659E31000 LIME | 0.05 ACRE | $200 | $200 |
| 659E35000 WATER | 1 MGAL | $50.00 | $50.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 |
| 608E10000 4" CONCRETE WALK | 58 SF | $22.00 | $18.36 |
| 644E00104 EDGE LINE, 6" | 0.02 MILE | $7,120 | $7,120 |
| 644E00404 CHANNELIZING LINE, 12" | 104 FT | $2.25 | $2.25 |
| 644E00500 STOP LINE | 69 FT | $8.90 | $8.90 |
| 644E01300 LANE ARROW | 4 EACH | $135 | $135 |
| 644E01400 WORD ON PAVEMENT, 72" | 2 EACH | $150 | $150 |
| 644E01520 DOTTED LINE, 12" | 150 FT | $1.87 | $1.87 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 8 HOUR | $75.00 | $89.35 |
| 614E20100 WORK ZONE LANE LINE, CLASS I, 4", 642 PAINT | 0.67 MILE | $650 | $650 |
| 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT | 0.67 MILE | $650 | $650 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 0.34 MILE | $2,224 | $2,224 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.34 MILE | $2,224 | $2,224 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 0.02 MILE | $1,350 | $1,350 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.02 MILE | $1,350 | $1,350 |
| 614E23210 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 642 PAI | 104 FT | $0.75 | $0.75 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 104 FT | $0.75 | $0.75 |
| 614E24208 WORK ZONE DOTTED LINE, CLASS I, 12", 642 PAINT | 150 FT | $1.00 | $1.00 |
| 614E24618 WORK ZONE DOTTED LINE, CLASS III, 12", 642 PAINT | 150 FT | $1.00 | $1.00 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 69 FT | $3.90 | $3.90 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 69 FT | $3.90 | $3.90 |
| 614E30200 WORK ZONE ARROW, CLASS I, 642 PAINT | 4 EACH | $40.00 | $40.00 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 4 EACH | $40.00 | $40.00 |
| 614E31200 WORK ZONE WORD ON PAVEMENT, 72", CLASS I, 642 PAIN | 2 EACH | $29.00 | $29.00 |
| 614E31620 WORK ZONE WORD ON PAVEMENT, 72", CLASS III, 642 PA | 2 EACH | $29.00 | $29.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 253E02001 PAVEMENT REPAIR, AS PER PLAN, VARIATION B | 290 CY | $425 | $123k | 25% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (533 CY | $185 | $99k | 20% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 382 CY | $220 | $84k | 17% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3" | 10,975 SY | $4.05 | $44k | 9% |
| 608E52000 CURB RAMP | 1,309 SF | $32 | $42k | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $20,000 | $20k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $13,000 | $13k | 3% |
| 202E30000 WALK REMOVED | 1,225 SF | $8 | $10k | 2% |
| 254E01600 PATCHING PLANED SURFACE | 550 SY | $13 | $7k | 1% |
| 253E02001 PAVEMENT REPAIR, AS PER PLAN, VARIATION A | 18 CY | $375 | $7k | 1% |