HOL-US 62-20.66
HOL County · est $0.1M
Bid dateThursday, April 13—
HOL County · est $0.1M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 6 more items below.
| Item | Quantity | R1Bcc Ohio INC | R2Adena Corporation | R3Eclipse CO LLC | R4Stanley Miller Construction Company | % of bid |
|---|---|---|---|---|---|---|
| 611E96551 FIELD PAVING OF EXISTING PIPE, AS PER PLAN (66" +/ | 144 FT | $133 | $145 | $236 | $166 | 18% |
| 601E11000 RIPRAP, TYPE D | 39 SY | $388 | $238 | $275 | $430 | 14% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $9,086 | $12,899 | $21,000 | $13,000 | 8% |
| 202E70130 SPECIAL - PIPE CLEANOUT OVER 48" | 144 FT | $59.69 | $109 | $55.00 | $128 | 8% |
| 619E16000 FIELD OFFICE, TYPE A | 4 MNTH | $1,894 | $500 | $529 | $600 | 7% |
| 624E10000 MOBILIZATION | 1 LS | $6,653 | $6,022 | $8,608 | $13,700 | 6% |
| Item | Quantity | R1Bcc Ohio INC | R2Adena Corporation | R3Eclipse CO LLC | R4Stanley Miller Construction Company |
|---|---|---|---|---|---|
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $43.31 | $125 | $159 | $100 |
| 659E14000 REPAIR SEEDING AND MULCHING | 43 SY | $2.54 | $1.00 | $3.65 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.12 TON | $1,379 | $2,813 | $1,400 | $800 |
| 659E31000 LIME | 0.18 ACRE | $240 | $600 | $100 | $150 |
| 659E35000 WATER |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 832E30000 EROSION CONTROL |
| 6,000 EACH |
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,940 | $8,667 | $27,000 | $15,600 | 6% |
| 601E32010 ROCK CHANNEL PROTECTION, TYPE A WITH AGGREGATE FIL | 21 CY | $197 | $212 | $173 | $248 | 4% |
| 614E12200 SPECIAL - WORK ZONE GUARDRAIL | 50 FT | $82.43 | $44.11 | $87.00 | $87.22 | 4% |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 25 SY | $144 | $328 | $93.00 | $155 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,225 | $4,725 | $6,000 | $9,260 | 3% |
| 659E10000 SEEDING AND MULCHING | 854 SY | $3.26 | $2.58 | $3.65 | $3.00 | 3% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $2,700 | $9,670 | $1,192 | $4,500 | 3% |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 29.7 FT | $73.50 | $25.00 | $74.00 | $77.78 | 2% |
| 202E98300 REMOVAL MISC.: CONCRETE RIPRAP | 33 SY | $57.73 | $32.07 | $27.00 | $77.00 | 2% |
| 202E32600 GUTTER REMOVED | 40 FT | $42.00 | $16.47 | $21.00 | $60.00 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $1,330 | $1,688 | $2,148 | $2,000 | 1% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,125 | $9,338 | $6,500 | $5,111 | 1% |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 4 EACH | $93.45 | $75.00 | $94.00 | $100 | 0% |
| 5 MGAL |
| $3.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $15.75 | $25.00 | $16.00 | $16.67 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E96551 FIELD PAVING OF EXISTING PIPE, AS PER PLAN (66" +/ | 144 FT | $133.05 | $19k | 18% |
| 601E11000 RIPRAP, TYPE D | 39 SY | $387.92 | $15k | 14% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $9,086 | $9k | 8% |
| 202E70130 SPECIAL - PIPE CLEANOUT OVER 48" | 144 FT | $59.69 | $9k | 8% |
| 619E16000 FIELD OFFICE, TYPE A | 4 MNTH | $1,894 | $8k | 7% |
| 624E10000 MOBILIZATION | 1 LS | $6,653 | $7k | 6% |
| 832E30000 EROSION CONTROL | 6,000 EACH | $1 | $6k | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,940 | $6k | 6% |
| 601E32010 ROCK CHANNEL PROTECTION, TYPE A WITH AGGREGATE FIL | 21 CY | $196.79 | $4k | 4% |
| 614E12200 SPECIAL - WORK ZONE GUARDRAIL | 50 FT | $82.43 | $4k | 4% |