How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
WORD ON PAVEMENT, 72"
2 EACH
$113
$113
644E01500DOTTED LINE, 4"
1,315 FT
$1.25
$1.25
632E27200LOOP DETECTOR TIE IN
4 EACH
$165
$100
614E22350WORK ZONE EDGE LINE, CLASS III, 4", 642 PAINT
1.62 MILE
$1,400
$1,400
614E24610WORK ZONE DOTTED LINE, CLASS III, 4", 642 PAINT
2,630 FT
$0.70
$0.70
614E30650WORK ZONE ARROW, CLASS III, 642 PAINT
19 EACH
$70.00
$70.00
16%
Top items by winning bid
Item
Qty
Unit price
Extended
%
441E50000ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG
3,420 CY
$204.27
$699k
66%
254E01000PAVEMENT PLANING, ASPHALT CONCRETE, 2"
61,560 SY
$1.98
$122k
12%
614E11000MAINTAINING TRAFFIC
1 LS
$58,743
$59k
6%
624E10000MOBILIZATION
1 LS
$40,000
$40k
4%
407E20000NON-TRACKING TACK COAT
5,233 GAL
$4
$21k
2%
614E21550WORK ZONE CENTER LINE, CLASS III, 642 PAINT
6.3 MILE
$2,800
$18k
2%
644E00300CENTER LINE
2.84 MILE
$5,000
$14k
1%
644E00620CROSSWALK LINE, 12"
2,731 FT
$3.1
$8k
1%
614E11110LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST